ice flow 中文意思是什麼

ice flow 解釋
冰流
  • ice : n 1 冰,冰塊。2 〈英國〉冰淇淋,冰淇淋 (= ice cream); 〈美國〉冰涼飲料[點心]。3 冰狀物,糖衣。...
  • flow : vi 1 流,流動。2 (血液等)流通,循環。3 流過;川流不息;(時間)飛逝;(言語等)流暢。4 (衣服、...
  1. Some researchers have made study on this subject, such as the generation and evolution of frazil ice, shore ice, bottom ice, ice cover and ice jam, the resistance of freeze - up river, flow capacity and variation of water stage

    國內外一些學者通過原型觀測,試驗和數值模擬的方法對水內冰,岸冰,底冰,冰蓋和冰塞的生成和演變,封凍河道的阻力、過流能力和水位變化等有關問題進行了研究。
  2. The lakes are under moving sections of ice, called ice streams, that flow into the ross ice shelf

    這些湖泊在冰流的下面,冰流是移動的冰層,流向「羅斯冰架」 。
  3. The collapse of the larsen b ice shelf two years ago has accelerated the flow of glaciers into the nearby weddell sea

    兩年前崩塌的"守護神b "冰架巨大的浮動冰層加快了冰河流入附近的威德爾海的速度。
  4. " these two papers clearly illustrate, for the first time, the relationship between ice shelf collapses caused by climate warming, and accelerated glacier flow, " said dr rignot

    里戈諾特博士說: "這兩份報告第一次清楚地說明了氣候變暖導致的冰架崩塌與冰河流速加快之間的關系。
  5. The cable provides a continuous drain path for melting snow and ice to flow ( through the gutter and into the downspout )

    電熱帶(為融化雪和流動的冰)提供了一條連續的排水的路徑。
  6. But with the continuous decrease of ice mountain water flow, the water conservancy and hydropower potential will diminish, the industrial production will be adversely affected, and the agricultural output will reduce due to lowered irrigation capacity

    但是,隨著冰山水流的不斷減少,水利發電的能量潛力也將減少,工業生產將受到影響,同時灌溉能力的降低也將造成農業減產。
  7. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布設要考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫的庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  8. Liquid flow measurement in open channels. flow measurements under ice conditions

    明渠液體流量的測量.結冰條件下的流量測量
  9. If energy were to flow spontaneously from a block of ice to a surrounding volume of water, this could accord with energy conservation completely

    如果能量自發地從冰塊傳到周圍大片水域的話,這完全符合能量守恆定律。
  10. Measurement of intake flowrate of ice with quasi - steady flow method

    準定常流法測量內燃機脈動進氣的瞬時流量
  11. Taking ningxia - inner mongolia reach of yellow river as a study case, a ice regime forecast data warehouse is established for the datamining concerned on the basis of the analysis on the ice regime changing law and its influencing factor of the reach, and then the conceptual mathematic model and artificial neural network model for the parameter calibration of ice regime forecast are built up with gis in combination of the relevant empirical forecast models based on the principles of the hydrological flow muting, thermodynamics and ice hydraulics etc., with which the design and development of the decision support system for the ice regime forecast with the integrated functions of information inquiry, model parameter calibration, temperature forecast and ice regime forecast are preliminarily discussed

    摘要以黃河寧蒙河段為例,在對河段歷史冰情變化規律及其影響因素分析的基礎上,建立冰情預報數據庫,進行數據挖掘,並以地理信息系統( gis )為平臺,以水文學流量演算、熱力學、冰水力學等原理為基礎,結合相關經驗預報模型,建立用實測資料進行參數率定的冰情預報概念性數學模型和人工神經網路模型,初步探討了集信息查詢、模型參數率定、氣溫預報、冰情預報等功能為一體的冰情預報決策支持系統的設計與開發。
  12. In the regulation in company worth and domestic worth clauses : to the flood, seismic sea wave, ice approach, rainstorm, the natural disaster such as mud - rock flow belongs to insurance scope of business, the person that every attends insurance ( safe unit and individual ) the dangerous rate that has state and seat area to suffer water to browbeat by belongings builds insurance contract or bond, pay insurance premium regularly

    在企業財產和家庭財產保險條款中規定:對洪水、海嘯、冰凌、暴雨、 ,泥石流等自然災難都屬于保險業務范圍,凡參加保險者(保險的單位和個人)按財產擁有狀況和所在地區受水威脅的危險程度建立保險合同或契約,定期交納保險費。
  13. Wave off into shallow waters, seabed by the friction effect change steep wave front, trough ice, water points trajectory showed reciprocating flow, but also to the shore into the flow speed usually return rate greater than offshore, the net result of sediment at the bottom to the shore handling, and was the shock waves on the shore with the water current - riviera online accumulation

    外海波浪傳入近岸淺水區,受到海底的摩擦作用,波鋒變陡、波谷變緩,水質點運動軌跡呈現往復流動,而且向岸進流速度通常大於離岸迴流速度,導致底部泥沙凈向岸搬運,並被激岸浪的上沖水流帶至海濱線上堆積。
  14. During the melting ice flood season, any reservoir upstream a river or lake responsible for the control of melting ice flood must obtain the consent of the relevant flood control headquarters and be subject to its supervision when discharging its flow down stream

    在凌汛期,有防凌汛任務的江河的上游水庫的下泄水量必須徵得有關的防汛指揮機構的同意,並接受其監督。
  15. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底水利樞紐工程管理區內水工建築物的安全運行,充分發掘管理區的區位優勢和資源優勢,實現「防洪(包括防凌) 、減淤為主,兼顧供水、灌溉、發電、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進行了總體規劃。
  16. But global warming is melting the polar ice caps and disrupting this flow

    但是全球變暖正在融化極地的冰川而這干擾了這個洋流
  17. The three basic steps are as follows : firstly, the flow field is computed. secondly, the droplet trajectory equation is solved in order to determinate the limiting droplet trajectories and local collection coefficient. thirdly, a new iced shape is defined according to ice accretion model

    其基本步驟一般分三步:計算物體的繞流流場;求解水滴軌跡方程以確定極限水滴軌跡和收集系數;根據冰增長模型來確定新的結冰翼型形狀。
  18. An offshore platform is subjected to the action of environment loads such as the wind, wave, flow and ice etc. these loads are long - term and consecutive, so an offshore platform exist more serious vibration during its serving life than other buildings in land

    海洋平臺受風、浪、流和冰等環境荷載的作用,這些外荷載具有顯著的長期性、連續性特點,因此,海洋平臺在使用過程中存在著較陸上結構更為明顯、持續的振動問題。
  19. The ice accretion is considered a quasi - steady process in which the accretion is calculated layer by layer, assuming a constant flow field during the accretion of each new ice layer

    在對結冰進行數值模擬時,結冰被當成一個準定常過程,即把冰看成是一層一層增長的,假定每一層內冰增長時流場是定常的。
  20. Rignot and kanagaratnam found that ice loss due to glacier flow has increased from 12 cubic miles of ice loss per year in 1996 to 36 cubic miles of ice loss per year in 2005

    他們發現,由於冰山移動所造成的冰川流失從1996年的每年12立方英里上升到了2005年的每年36立方英里。
分享友人