inclined layer 中文意思是什麼

inclined layer 解釋
傾斜層
  • inclined : adj. 1. 傾斜的;成斜坡的;【數學】與線或平面成角的。2. 傾向于…的〈同不定式連用〉。
  • layer : n 1 放置者,鋪設者,計劃者。2 【賽馬】(一般)賭客。3 產卵的雞。4 【軍事】瞄準手。5 層;階層;地...
  1. This paper describes the principle and method for testing pile bottom force - hearing layer and pile body force - bearing declivity, deals with results of standard component test and inclined model pile test under the condition of inclination, and also gives some practical examples of engineeing application

    摘要闡述了樁底持力層與樁身傾斜度測試原理及方法,列舉了傾斜情況下的標準件試驗及傾斜模型樁試驗結果與工程應用實例。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土的材料特性、施工特點、溫度場溫度應力的變化特點入手,結合幾個工程總結了碾壓混凝土重力壩、拱壩的分縫方式,降低澆築溫度、水管冷卻、表面保溫、施斜層碾壓等溫控措施,採用微膨脹混凝土、提高材料抗裂性能等改善材料性能措施及碾壓混凝土溫度場、應力場模擬分析的要求和應注意的問題。
  4. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  5. Spreading method of horizontal push on inclined layer of roller compacted concrete

    碾壓混凝土施工中的斜層平推鋪築法
  6. In order to facilitate the analysis of the minimum repeated unit cell, the following geometrical characteristics were assumed : ( a ) all the yarn segments parallel to a diagonal direction or braiding axis in all unit cells lying in the same layer of the perform are treated as forming inclined lamina or horizontal lamina after matrix impregnation, ( b ) fibers were considered to be straight and unidirectional

    以精確的復合材料單胞模型為基礎,從最小的可重復的單胞入手,對單胞的結構進行簡化分析,認為纖維是平直的,將單胞中的四個不同方向的纖維束看成是空間四個不同方向的單向復合材料,纖維束的性能可以等價于單向復合材料的宏觀性能。
  7. The work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached

    分析了斜管沉澱裝置的工作原理,探討了應用淺層沉澱技術改造撈坑的可行性。
  8. Abstract : the work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached

    文摘:分析了斜管沉澱裝置的工作原理,探討了應用淺層沉澱技術改造撈坑的可行性。
分享友人