inspection schedule 中文意思是什麼

inspection schedule 解釋
檢查圖表
  • inspection : n. 1. 檢查,檢驗;審查。2. 檢閱,視察;參觀。
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. Aerospace series - metallic materials - manufacturing schedule, inspection schedule, inspection and test report - definition, general principles, preparation and approval

    航空航天系列.金屬材料.生產進度表檢驗進度表檢驗和試驗報告.定義一般原理制備和驗收
  2. Article 36 the preparation and construction office is responsible for the following concrete works : examining the designs of the project, signing the project construction contract, organizing the purchase and inspection of related equipment, materials, etc., working out the general schedule of project construction, compiling the expenditure plans, controlling project financial payments and final accounts of the project, drawing up managerial methods and keeping and filing documents, drawings, files and materials, etc., during the construction period of the project

    第三十六條籌建處具體負責審查工程設計,簽訂工程施工承包合同,組織有關設備、材料等物資的采購和驗收,制定有關的管理辦法,做好工程施工過程中文件、圖紙、檔案、資料的保管和整理等工作。
  3. The risk assessment and the risk sequence of the equipment and piping of catalytic cracking unit in lanzhou petrochemical company were defined by applicating the risk - based inspection ( rbi ) technology, and the inspection program which offers scientific basis for repairing schedule and strategy was made according to different equipment, piping and different risk classes

    摘要通過運用基於風險的檢驗( rbi )技術對蘭州石化公司300萬噸年重油催化裂化裝置的靜設備和管道進行風險評估和風險排序,針對不同的設備,不同的風險等級制定了相應的檢驗策略,為制定裝置的檢修計劃和長期的檢修策略提供了一種科學方法。
  4. Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep

    ( 3 )針對川塔項目施工建設具體需要,在充分體現項目事前規劃與全面控制相結合管理思想和所進行的項目wbs結構分解基礎上,基於項目進度? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵路線法的川塔項目進度計劃制定方案,實現了進度規劃與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔項目成本基本規劃方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了項目施工方案中,針對子項目招標、設備采購、重點質量監控點等設立了詳細的質量保障機制和細則,以確保達到工程優質建設的目標。
  5. Maintain and ensure up - dated spec used in the molding production. establish and implement first article inspection schedule of new or modified molding tool for sample qualification

    確保成型過程中產品執行最新的規范要求並及時更新相應的文件.根據新產品計劃要求合理安排首件檢驗計劃
  6. Schedule the inspection, and possibly overview, meetings and distribute a meeting notice

    安排評審會議或者還有評審說明會議的時間,並發出會議通知。
分享友人