installed capacity of power station 中文意思是什麼

installed capacity of power station 解釋
電站裝機容量
  • installed : 安裝
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  • of : OF =Old French 古法語。
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  2. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  3. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。
  4. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    瀾滄江糯扎渡水電站擬建壩高261 . 5m ,裝機容量5850mw ,採用左岸地下發電系統,由主廠房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。
  5. At the end of 1998, total installed capacity at the lamma power station was

    一九九八年底,南丫島發電廠的總發電量為
  6. At the end of 2000, total installed capacity at the lamma power station was

    二零零零年年底,南丫島發電廠的總發電量為
分享友人