load characteristic curve 中文意思是什麼

load characteristic curve 解釋
負載特性曲線
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • characteristic : adj 有特性的;表示…特性的,…特有的。 Japan s characteristic art 日本特有的藝術。n 特性,特徵,性...
  • curve : n 1 曲線;彎曲;彎曲物。2 曲線規 (=French curve);【機械工程】曲線板;【棒球】曲線球;【統計學...
  1. The dissertation proposes originally the idea of decomposing the time - variant load to solve this problem. first, the time - variant load is decomposed into the time - variant load characteristic and the time - variant load model due to the modeling method. second, the multi - curve approximation method is proposed to identify the load parameters, which to a great extent, reduces the effects on the time - variation of the load model from modeling method

    針對負荷的時變性,論文首次提出了將負荷時變性分解的思想,首先將負荷的時變性分解為負荷特性的時變性和由建模方法引起的負荷模型的時變性,然後提出了多曲線擬合參數辨識方法,很大程度上消除了建模方法引起的負荷模型的時變性。
  2. The principle of the predigestion in geometry modeling is omitting the function part and the non - load - carrying process structure, and to the big and transition arc, the curve is replaced by straight line using the thought of curve and free - surface segmentation. the physical characteristic of the digital model reflect on remaining the main mechanical characteristic of the objects. the shell element model is used in strength analysis, stiffness analysis and dynamic analysis

    文中幾何建模的簡化原則是,略去功能件和非承載的工藝結構,對于大圓弧和過渡圓弧,以曲面分塊和曲線分段的思想進行適當的以直代曲;數模的物理特性反映在最大限度地保留對象的主要力學特性;在強度、剛度和動態分析中採用殼元模型,輕量化設計中採用梁元模型;材料特性根據所用材料定義其主要性能參數。
  3. Load characteristic curve

    負載特性曲線
  4. The adopted alternative coefficient for capacity is from 1. 05 to 1. 10 and for electric generation 1. 05. in fact, the capacity benefits are related to maximum load, load curve and the weight of hydropower power capacity. while the benefits of coal consumption saving are related to load consumption characteristic and power structure in addition to maximum load and load curve of the power system

    當系統的水電(含抽水蓄能)比重較小時, 1 . 05 1 . 1容量替代系數可能偏小;而當抽水蓄能電站佔有一定比重時,這種方法又可能過高地估計了抽水蓄能電站的容量效益,因為它未能考慮某些月份抽水蓄能電站可能出現的空閑容量。
分享友人