load wall 中文意思是什麼

load wall 解釋
承重墻
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. Based on the analysis of mechanism for joint region, the " frame - wall " and " aslope compression stub column " mechanical models and yielding patterns of core zone of the joints are set up. the shear load - carrying formulation for joint core zone is also given in terms of plastic ultimate analysis. and then, the comparisons between the formulas given in this paper and that of chinese design code ( draft ) and nonlinear fem as well are presented

    對節點核心區的抗剪,通過受力機理的分析,建立了鋼「框架剪力墻」加混凝土「斜壓短受力體系及其屈服機制,根據塑性極限分析,給出了節點核心區抗剪承載力計算的迭加公式, 《規程》公式和非線性有限元近似模擬分析結果進行了比較。
  2. Stress analysis of symmetrical and thick wall components with axial symmetry in geometry and load

    幾何軸對稱及載荷軸對稱厚壁零件的應力分析
  3. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  4. Abstract : this paper discusses some problems in design of brick masonry building with internal frame under horizontal earthquake effect t he problems of the distance of asemic cross wall, the caculation model of outer wall - colum and interal frame, some asemic load bearing capacity the author ' s vi ew is also presented

    文摘:本文就多層內框架磚房在水平地震作用下抗震橫墻間距、外壁柱和內框架柱的計算模型,與有關抗震承載力計算等問題進行了分析,並提出作者的意見。
  5. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed

    在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同連接構造和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。
  6. The regularities of pile - top reaction distribution, the carrying load ratio between pile and raft, the settlement and the imparity settlement of foundation in the frame - tube structure and the single wall are influenced by some factors such as the stiffness of the superstructure, the intensity of the soil under the piles, the length and radius of the piles, the distance between the piles, the thickness and the suspended width of the raft

    對豎向荷載作用下的空間筒中筒結構、樁筏基礎和地基進行了三維有限元分析。研究整體結構和單片墻結構在上部結構剛度、樁端土強度、樁長、樁徑、樁距、筏板厚度、筏板外挑寬度等影響因素變化時的樁頂反力分佈規律、樁筏荷載分擔比、樁基沉降和差異沉降規律。
  7. Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties couplet test

    圬工輔助砌塊的試驗方法.墻拉桿的拉伸和壓縮負載容量和負載轉移特性的測定
  8. Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test

    圬工輔助砌塊的試驗方法.墻拉桿的拉伸和壓縮負載容量和負載轉移特性的測定
  9. Methods of test for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couple test

    圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定
  10. Methods of test for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test

    圬工輔助成份試驗方法.第5部分:拉伸和壓縮負載容量和墻系柱和負載代替特性測定
  11. Methods of tests for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couplet test ; german version en 846 - 5 : 2000

    磚石工程輔助元部件試驗方法.第5部分:墻拉桿抗拉荷載
  12. Methods of tests for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test ; german version en 846 - 6 : 2000

    磚石工程輔助元部件試驗方法.第6部分:墻拉桿抗拉荷載
  13. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產線焊接成形,施工現場用高強螺栓連接,減少了焊接工作量,使進度和質量得到完全保證。
  14. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設計工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  15. It is suggested that the impervious wall combined with curtain grouting should be taken as the main vertical impervious body for seepage control, and that the full use of slope wash and fully weathered zone as horizontal impervious blanket should be taken to reduce work load for seepage control

    建議採取截滲墻結合帷幕灌漿作垂直防滲體為主的防滲措施,同時充分利用坡積土和全風化帶作為水平防滲鋪蓋以減少防滲處理工作量。
  16. This paper uses for reference with an example of frame - shear wall structure and studies the conceptual design and method for optimizationof structural system. through establishing frame - shear wall structure unisonous differential eguation and finding a result, the side shifting curve, moment and shear force distribution curve are obtained under inverted triangle load action on the frame - shear wall structure. after analyzing and comparing, the range of best rigid characteristics for such structure has be gotten

    本文結合框架-剪力墻實例,研討了結構體系的概念設計和整體優化方法。通過建立框-剪結構協同工作的微分方程及求解,得出框-剪結構在倒三角形荷載作用下的側移曲線、彎矩、剪力分佈曲線,經分析對比,得出框-剪結構最佳剛度特徵值區間。
  17. Then the judging method is proposed, and the proposed method can consider the stress history and viscosity shear strength of soft soil. in this paper, a fem program dpfbm1. 0 ( double plastic foundation beam method ( version 1. 0 ) ) is established. with this program, the influence of some parameters on foundation excavation is fully studied, the parameters include : compression modulus, cohesive strength, angle of internal ficiction, effective angle of internal friction, the embedded length of the wall and building load

    針對當前國內外彈性地基梁法存在的缺陷,基於對軟土流變性的研究,採取了剪應力判斷彈塑性狀態,以改進和完善基坑工程彈性地基梁法,推導了彈性狀態下地基反力系數的近似解,提出了採用剪應力組合判斷土彈簧彈塑性狀態的方法,編制了相應的彈塑性共同變形法分析程序dpfbm1 . 0 ( doubleplasticfoundationbeammethod ( version1 . 0 ) ) ,並採用該程序分析了壓縮模量、粘聚力、內摩擦角等參數變化對基坑工程的影響。
  18. On the base of the basic structure study of the tooth - locked quick closure vessel of middle and low pressure with crown head, the optimization method of parameterized whole device is presented in this paper, the emphases of research is put on optimization of the tooth - locked quick closure device whose structure and load distribution is complicated, the wall of vessel, however, is designed according to the existing strength formula

    本文對帶有球冠形封頭的中、低壓齒嚙式快開容器的基本結構進行研究的基礎上,提出了齒嚙式快開容器的參數化整體優化方法,研究重點放在結構和受力復雜的齒嚙式快開裝置的優化,對于容器簡體壁厚仍採用現有強度公式設計。
  19. Firstly, the shear wall ' s load - carrying capacity, displacement, properties of ductility, shape of damage, distribution of plastic hinge are analyzed through delaminating combination finite element method with numerical value method

    首先選用分層組合式有限元方法利用數值方法分析剪力墻結構的承載力、位移、延性性能、破壞形態、塑性鉸等問題。
  20. Through developing the comprehensive experiment device with large - scale drum strength and stability, the stress - measuring experiments of various wall thickness of the normal drums of the cranes were performed. the law that the stress of the drums along the circumference and along the axis changes with the load increase of the wire ropes was studies for the first time

    通過研製全比尺大型捲筒強度、穩定性綜合試驗裝置,對起重機常用規格的捲筒進行了各種壁厚條件下的應力測量試驗,首次對捲筒體周向和軸向應力隨鋼絲繩逐步加載過程變化的規律進行了研究,發現最大應力產生在鋼絲繩繞過后3 ~ 5圈截面處,該現象與理論分析結果也是符合的。
分享友人