loading spot 中文意思是什麼

loading spot 解釋
裝貨地點
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • spot : SPOT =satellite positioning and tracking 人造衛星定位及跟蹤。n 1 斑點;污點;疵點,缺點。2 地點...
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水重心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  2. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  3. The result shows that under the effect of repeated impact load, the stress wave produces reflection in the metallurgical junction plane between coating and basal body, and forms stretch wave causing longitudinal split and angle split of coat ; the microcosmic spot pitting and deep layered peeling off occur in coating surface due to stress concentration ; the energy accumulation of impact loading causes rigidity variation and plastic deformation

    結果表明:在多沖載荷作用下,應力波在塗層和基體的冶金接合面發生反射,形成拉伸波造成塗層的縱裂和角裂;在塗層表面由於應力集中,塗層表面發生微觀點蝕和深層剝落;沖擊載荷能量的積累,造成塗層試樣硬度變化和塑性變形。
  4. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  5. This text verify the linear regression relation of the power factor, efficiency and rated loading according to the spot data, and proof the linear regression relation is more accurate than other related relation

    本文還根據現場數據確定了功率因數、效率和負載率三者之間的線性回歸關系,並證明了線性回歸關系比其他相關關系準確。
  6. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區鉆孔灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層厚度及嵌巖深度等方面做一些探討性研究。
  7. Firstly, the analyses on the dynamical response of the tsing ma bridge ( tmb ) under traffic loading are performed on the basis of the three dimensional finite element model of the full - scale structure of the bridge, and some regions critical to fatigue damage are determined from the result of the dynamical response. the hot spot stress approach is usually adopted in the fatigue design and analysis of tubular welded joints. to apply the hot spot stress approach for the fatigue evaluation of long - span suspension bridges, the fem is further used to determine the hot spot stress of the critical fatigue locations

    首先,在青馬大橋三維有限元模型和整體動力響應分析計算的基礎上進一步進行關鍵疲勞構件的局部熱點應力分析,對疲勞危險部位處的焊接構件建立三維有限元模型,施加符合橋梁實際工況的載荷與位移邊界條件,進行局部熱點應力分析,確定這些焊接構件內的名義應力和相鄰焊接區域內熱點應力之間的關系,得到相應的應力集中系數。
  8. The results show that in the later stage of the nucleation process, the maximum slip velocity is monotonically accelerating ; the slipping hot spot ( where the slip rate is maximum ) migrates spontaneously from a certain instant, and such migration is spatially continuous ; when the maximum velocity reaches a detectable order of magnitude ( at least one order of magnitude greater than the loading rate ), the remaining time is 20 hours or more, and the temporal variation of slip velocity beyond this point may be used as a precursory indicator ; the average slip velocity is related to the remaining time by a log - log linear relation, which means that a similar relation between rate of microseismicity and remaining time may also exist ; when normal stress variation is taken into account, time scale of such processes can be extended by about 2 times

    結果表明,在成核的後期階段:最大位移速率單調加速增加;滑動熱點(最大滑動速率處)在後期階段開始自發性遷移,且在空間上連續;當最大滑動速率達到可以明顯探測的量級時(高於載入速率一個數量級以上) ,倒計時間為20小時或更長一些,這時的速率變化可作為臨震預測標志;平均滑動速率與倒計時間的關系在臨震階段呈對數線性趨勢,由此可推測微震活動增長率與倒計時間同樣存在對數線性關系;正應力的變化對上述時間尺度有延長作用,使之大致增加到原數值的2倍。
分享友人