permeability limit 中文意思是什麼

permeability limit 解釋
滲透極限
  • permeability : n. 1. 透過性,可透性,滲透性;滲蝕度;【航空】(氣球氣體的)透出量。2. 【物理學】磁導率,磁導系數(=magnetic permeability)。
  • limit : n. 1. 界限,界線;邊界。2. 極限,限度;限制。3. 〈pl. 〉范圍,范域。4. 限價;限額;賭注限額;獵物限額。vt. 1. 限制,限定。2. 減少。adj. -able
  1. Economical well spacing and technical limit well spacing must be considered when making up development plan for low permeability sandstone reservoir

    摘要低滲油田開發方案設計必須同時考慮經濟合理井距和技術極限井距。
  2. Observation of drilling cores and casting - sections and the characters of pore structures and permeability of the matrix of the lower - ordovician carbonate in comparing with the lower limit of a reservoir for matrix reveal that the porosity, permeability, maximum pore diameter, saturation and median throat diameter in the matrix with undeveloped fissures, holes and solution pores are far lower than those of a reservoir limit although some micro - pores are developed in the matrix which therefore has no capacity of storing and producing oil - gas

    摘要通過鉆井巖心和鑄體薄片觀察,根據下奧陶統灰巖基質的孔滲特徵和孔隙結構特徵,並與基質作為儲層的下限對照裂隙、洞穴和溶蝕孔洞不發育的灰巖基質,發現盡管有微孔隙的發育,但其孔隙度、滲透率、最大孔喉半徑、飽和度、中值喉道半徑等參數值遠低於儲層下限值,基本不具備儲集和生產油氣的意義。
  3. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低基巖的承載能力、增大基礎的透水性、惡化基巖的天然結構和地質構造,這對於水工建築物,特別是擋水建築物是不能允許的,同時將會增加採取補救處理措施所發生的費用,延長建築物施工直線工期。
  4. The indoors tests of compaction, liquid and plastic limit, strength, permeability and compres - sion are done, including cement - improved - soil, lime - improved - soil, lime - fly ash - improved soil. the correctness and rationality of mixing proportion is proved according to the site of qin - shen quick - speed railway. and the construction technics of each improved soil are summarized

    最後結合秦沈客運專線的施工,驗證了各摻入料配合比的正確性、合理性,歸納總結了各改良土的施工工藝、關鍵工序、質量保證措施,為今後高速鐵路路基填料的改良積累了一些資料。
  5. If the technical limit spacing is bigger than or equal to the economical spacing, it would be feasible in low permeability sandstone reservoir and reservoir engineering plan can be scheduled on this basis

    如果技術極限井距大於或等於經濟合理井距,則該井距就是低滲透砂巖油藏的合理井距,油藏工程方案就可據此部署井網。
分享友人