pipe crossing 中文意思是什麼

pipe crossing 解釋
管道跨越
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • crossing : n 1 交叉,相交;橫切,橫斷;橫越,橫渡。2 交叉點;十字街口;人行橫道;(河的)渡口,(鐵路的)閘...
  1. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  2. Considering different soil spring models for vertical fault movement and horizontal fault movement, two damage cases of pe pipeline in ji - ji earthquake have also been simulated. the large deformation of a buried pipeline under fault movement is investigated in the 4th chapter. to examine the inelastic behavior of buried pipelines, the parametric studies on pipe material property, diameter ( d ), diameter - to - thickness ratio ( d / t ), crossing angle ( ), as well as soil stiffness, have been conducted using a shell - spring fem method

    對於0 p三90 」的情況,當斷層位移相對管徑還不是很大時(管子內的彎曲應變與軸向拉伸應變相差不大的情況) ,斷層附近管子變形形式與梁相似;當斷層位移相對管徑很大時(管子以軸向拉伸應變為主的情況) ,斷層附近的管子軸線變形為一圓弧,管子表現得像一條沒有彎曲剛度的索。
  3. Crossing his legs, he resumed his pipe with a nicely adjusted gaze at a point in the air.

    他交叉起兩腿,端端正正地凝視著空中的某一點,重新抽起他的煙斗。
  4. Since it is difficult for the cable or beam model to consider the large deformation in the pipe crossing section, the fem analysis with shell element has been proposed to investigate the response of pipe. takada ( 2000 ) proposed a simplified design formula to obtaining the maximum strain in steel pipes based on the parametrical study using a beam - shell hybrid fem

    現在的抗震規范和有關研究中,還很少有估計大變形時管子內的應力應變的方法,雖然2000年高田至郎等人基於殼有限元模型的參數研究提出了設計用的簡化計算公式,但在他們的分析模型中存在一些問題有待改進。
  5. When the crossing angle is larger than 90 degree, the pipeline would prone to suffer a buckling damage ; ( 2 ) it cannot be used to analyze the large deformation in the pipe section

    現有的殼模型有限元方法雖然可以分析管截面中的大變形情況,但是,由於在斷層作用下受影響的管子的范圍比較長,需要耗費大量的計算時間。
  6. Firstly, the study of damage of buried pipelines crossing faults is introduced in the first chapter, specially for the damage of pe gas pipeline in 1999 ji - ji earthquake, because these kinds of direct evidences of fault ruptures on pe pipe failures were rare in the past

    本文首先介紹了埋地管線在斷層作用下的震害,特別是以往震害資料極少的聚乙烯( pe )管在1999年集集地震中通過斷層的破壞情況。根據震害資料,本文歸納總結了埋地連續管道的各種破壞模式。
  7. Taking zibo - qingdao natural gas pipeline engineering for example, starting with the present crossing river modes for gas transport pipeline, the main contents and methods of geotechnical engineering investigation for pipeline crossing river are put forward ; the existential geotechnical engineering problems and relevant countermeasures in the course of design and construction of this pipeline engineering ' s crossing river project are analyzed and evaluated ; the importance of geotechnical engineering investigation in the design and construction of long distance pipe lines is pointed out

    摘要以淄青天然氣管道工程為例,從目前輸氣管道河流穿跨越方式入手,提出了管道穿越河流巖土工程勘察的主要內容和方法,分析評價了淄博青島輸氣管道工程河流穿越工程設計及施工過程中存在的巖土工程問題及相應的對策,指明了巖土工程勘察在長輸管道設計及施工中的重要性。
  8. For above ground installation, the receiver & launcher shall be horizontal, which center is about 1m high from ground, and shall be connected to underground pipe by nozzle stub and bend but not skewed crossing connection

    地面時,收發球筒為臥式,中心距地面高度一般為1米左右,通過短管及彎管與地下管線連接,不宜採取斜交叉連接。
  9. Cable pipe ? a protection casing pipe used for special purposes when crossing roads or bridges, with good characteristics of being acidproof and alkaliproof, and good performance on electric insulation and electromagnetic shielding

    電纜管? ?為電纜過路、過橋專用保護套管,具有良好的耐酸堿和電氣絕緣性能,電磁屏蔽性能。
  10. The deformation of parallel buried pipelines and perpendicularly crossing buried pipelines induced by pipe jacking is analyzed by 3 - d fem. the displacement pattern of buried pipelines and its influence factors are studied. the measures for protecting neighborhood underground pipelines and relevantly controlling measures for minishing the ground movements during pipe jacking are advanced

    採用ansys程序進行了三維有限元建模,模擬了頂管施工對相鄰平行地下管線和垂直交叉地下管線產生的影響,研究了地下管道的位移模式,對影響地下管線位移的主要因素進行了分析,提出了頂管施工中對鄰近地下管線的保護措施以及減小地層移動的控制措施。
分享友人