power transformer substation 中文意思是什麼

power transformer substation 解釋
配電站
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • transformer : n. 使變化的人[東西];【電學】變壓器;變換器;互感器。 polarity of transformer 變壓器繞線方向。
  • substation : n. 分站;變壓所;支局,分局,派出所。 a power substation 變電所。
  1. Achievable unmanned power transformer substation

    無人值班變電所的實現
  2. Cubical substation series - power transformer jiangsu bright group cubical substation series

    箱式變電站系列歐式箱變
  3. Aiming at the problem that existence in the monitoring of simulate disk in local power grid, to enhance the level and efficiency of the electricity dispatch, to improve operation procedures, to change the troublesome work about 6kv line simulation disk, 35kv transformer substation and 6kv substation host cording diagram revision and maintenance from man - power, manual promotion to direct - viewing, real - time and work flow high automation level

    針對地方電網「模擬盤」監視中存在的問題,為提高電力調度工作水平和效率,完善操作規程,把煩瑣的6kv線路模擬盤、 35kv變電所和6kv配電所主結線圖的修改和維護工作從人工、手動提升到直觀、實時和工作流程高度自動化水平,實現電力調度日報、月報及日常管理實現規范化、自動化。
  4. Application of geometric programming and geometric programming with fuzzy coefficients in seeking power supply radius of transformer substation

    系數的幾何規劃在城市變電所供電半徑選擇中的應用
  5. The emulational calculating theories of traction power supply system ' s operating charts combine with actual things of engineering design at present in chapter three, to set up traction web current distributing mathematical model, integral distributing mathematical model, locomotive distribution and obtaining current model at every moment, and on which making use of mathematical planning methods to set up mathematical models is based at every moment in every instance interval of the railroads. for instance, instantaneous current, instantaneous voltage descent and effective current, main changing capacity and so on, in addition, there are the minimum power shortage model, the optimal transformer substation location, the least engineering expenditure, the optimal mathematical model of traction power supply system. optimize design ' s algorithm of traction power supply system is introduced in detail in chapter four, where programming idea and realizing method of the computer software are given an explanation

    本研究主要進行了以下工作:結合牽引供電系統運行圖的模擬原理和現行工程設計的實際情況,建立了牽引網電流分佈、積分分佈、任一時刻機車分佈和取流的數學模型;應用數學規劃方法建立了任一距離區間、任一時刻的瞬時電流、瞬時電壓降數學模型和有效電流、主變容量和主變壓降、最小功率損失、最佳變電所容量、最佳變電所位置、最少工程費用、最少運營維護費用和牽引供電系統方案最優等方面的數學模型;闡明了牽引供電系統優化設計的演算法和計算機軟體編程思想及實現方法;進行了工程實例計算;最後,對牽引供電系統優化設計技術應用進行了總結。
  6. And so, the gis - based electric cable information management system can administrate transformer substation, switch substation, power distribution room, power cable, silo, canal and high voltage user according to their location, drawings, cable records. the system provides multiple index for query service and statistical electric cable graph and information on properties

    本系統可以實現對變電站、開關站、配電室、電纜、豎井、溝道及高壓用戶等空間位置、圖形資料(包括一次接線圖、竣工圖、斷面圖) 、電纜臺帳信息的綜合管理;並可按多種方式來查詢、檢索、統計電纜圖形及屬性數據信息。
  7. The engineer of the electric power science academy tested the harmonic occurred in 220kv transformer substation in baishiyan 、 110kv transformer substation in nantupo 、 110kv transformer substation and converting station in 821 factory. this article analyzed these data particularly. the three - phase commuted device of 821factory is one of the main harmonic in the power supply & transmit electricity system in guangyuan

    四川電力公司諧波監測站對廣元電業局所屬的袁家壩220kv變電站、白石巖220kv變電站,新廣興220kv變電站,懶土坡110kv變電站,廣興鋁廠110kv變電站,八二一廠110kv變電站及整流站進行了諧波測試,本文對其測試結果作了較為詳盡的分析。
  8. Tangyin substation is an important substation which has two transformer of 120mva, eight 220kv lines and three 110kv lines. tangqian line is a 110kv line specially for traction transformer substation. because traction load is high - power nonlinear and asymmetry. it will produce much harmonic and negatvie sequence current, which have done harm to compensation capacitors of tangyin substation. in recent years, the tang6c capacitor often interrupted and in 2001 july the tang7c capacitor ' s discharge pt exploded

    湯陰變電站是豫北一座樞紐變電站,有2臺120mva的主變, 8條220kv線路和3條110kv線路,其中的湯牽線是專為牽引變電站供電的110kv線路。由於電力機車屬于大功率的非線性負荷,且三相不對稱,在其運行過程中必然會產生較大的高次諧波和負序電流。
  9. Vacuum circuit breaker, drop - out fuse, current limiting fuse, hv fuse, lightning arrester, load switch, power cable distribution box, ring - type net switch station, intelligent power distribution automation system, box transformer substation, hv switchgear cabinet set, lv switchgear cabinet set, isolating switch, hv synthetic rubber insulator, etc. high technology is the source of sunrise development " continuous improvement, keep learning to succeed " is our concept. the group has established a long - tem cooperation with uk birmingham university. electric power research institute of china

    主要生產126kv以下輸變電設備,主要有真空斷路器跌落式熔斷器限流熔斷器高壓熔絲避雷器負荷開關電纜分接箱環網開關站智能配電自動化系統箱式變電站高壓成套開關櫃低壓成套開關櫃隔離開關高壓合成膠絕緣子等14大系列800多種規格。
  10. Relying on years of researching of electric power, accumulated manufacturing experience, and affluent economic technological power, the enterprise is capable of product pgl, ggd, gcs, gck low voltage power distributing panel, xgn2 - 12, hxgn15a - 12 high voltage switch cabinet, xbz1, xbj1 box - type transformer substation and zw8 - 12 630 - 20 outdoor high voltage vacuum breaker, totally 6 series and 200 more varieties. the products are a great contribution to the social economic development and have been recognized and praised by vast customers

    企業憑借多年的電氣成套研製生產經驗和雄厚的經濟技術力量,生產pgl ggd gcs gck型低壓配電屏xgn2 - 12 hxgn15a - 12型高壓開關櫃xbz1 xbj1型箱式變電站及zw8 - 12 630 - 20型戶外高壓真空斷路器等6大系列200多種品種,為社會經濟發展提供可靠的產品和服務,得到廣大客戶的認可和贊譽。
  11. It can be applied for purification of unqualified transformer oil, mutual inductor oil, oil switch oil and capacitor oil as well as low - viscosity lubricating oils for electric plant, power station, electric company, transformer substation working area, plant, railway, ect

    廣泛適用於電廠電站電力公司變電工區廠礦鐵路等,對不合格變壓器油互感器油油開關油電容器油低粘度潤滑油的凈化再生處理。
  12. The dc distributor shelf play a important role in transformer substation, power plant, big and middle plants etc. it supply mainly to the controled, protected and communicate equipment, automechanism, manipulaor and adjusted machine. the same time it may as accident lighting power supply, so its performance and reliability affect directly the running safely of whole power supplying system

    直流電源屏作為供電電源在變電站、發電廠、大中型廠礦企業等供電系統中佔有很重要的地位,主要用於向控制、保護、通信設備、自動裝置操作機械和調節機械的傳動機構供電,同時還可以作為獨立的事故照明電源,所以其性能及可靠性直接影響到整個供電系統的正常安全運行。
  13. Engineering technicians enter the equipment testing area in the linhai power transformer substation in mudanjiang city of northeast china ' s heilongjiang province, nov. 22, 2006

    11月22日,在牡丹江市林海變電站,工程技術人員進入調試設備區。
  14. Breaking off at wuwei on the hai - jin liens, after " ti " mode joined into wuwei 330kv transformer substation, it may bring some problems, such as fundamental frequency excessive voltage, resonance excessive vohage, stability, undercurrent, reactive power compensation, etc. these problem be analyzed. it provides the schemes of design and build wuwei transformer substation and reform the transmission line of hai - jin - jia

    在海金線武威開斷, 「 」入武威330kv變電站后可能帶來的如:工頻過電壓、諧振過電壓、穩定水平、潛供電流、無功補償等問題進行分析,對武威變電站的設計、建設及海金嘉線路改進提供方案。
  15. Now days, with the further improvement of dependability requires to transformer substation in electric power system, the level of on - line inspection to dc system must be strengthened to meet the request of more dependability to dc system. the content about the inspection of dc system of substation is researched in this paper, including the study of on - line inspection to storage cells and the study of earthing fault lookup. in the aspect of inspection to cells, the inspection to cells is discussed on foundation of analysing in several pieces of measuring amount to the battery

    近年來,隨著電力系統對變電站運行可靠性要求的進一步提高,為滿足大型變電站對更高可靠性直流系統的要求,就需加強對直流系統在線監測水平。本文主要討論了變電站直流系統監控方面的內容,包括了蓄電池組的在線檢測的研究和接地故障選線裝置的研究兩個方面。在蓄電池的檢測方面,在對蓄電池的幾個檢測量分析的基礎上,針對內阻的檢測做了詳細的討論,並結合原有方法的缺陷提出了自己的改進方法。
  16. According to the object and principal of this rural power network building and reconstruction, combining with the specific policy of fuxin ' s structural adjustment in economy, and based on sufficient consideration of the current situation of fuxin ' s rural power network, and the experiences of myself, and after referring to a great deal of technical information, i have done the technical and economic analysis concentrated on the following aspects, such as network arrangement optimizing, building and reconstruction of transformer substation, the building and reconstruction of low voltage power network, the technical and economic analysis of transformer renewing, the inefficient power compensation in rural power network, therefore concludes the direction of fux in ' s rural power network building and reconstruction

    論文根據此次全國農村電網建設與改造的目標和原則,結合阜新地區經濟轉型的具體方針,在充分考慮阜新地區農村電網的實際現狀的基礎上,本人根據自己多年的工作經驗,在查閱了大量技術資料的基礎上,就農村電網結構優化、變電所的建設與改造、低壓配電網的建設與改造、變壓器更新技術經濟分析、農網的無功補償進行了詳盡的闡述分析。確定了阜新農村電網建設與改造的方向。
  17. In recent years, some new challenging problems have come forth in automation systems with the fast development of electric power industry. firstly, to build transformer substation with no - operator, which often causes abnormal or even wrong data. secondly, alarming module should be well strengthened in no - operator dispatching

    近年來,電力工業快速發展對自動化系統帶來了一些新問題:特別是通過變電站無人值班建設,誤發信息出現頻繁,給正常運行監控帶來很大麻煩;無人值守電網的調度,需要強大的告警功能;無人值守變電站新的管理模式,也對調度自動化scada系統功能提出了新的要求。
  18. The paper analyses the on - line monitoring power transformer " s chromatogram of oil in the pingliang 110kv substation and investigation the status in quo of transformer insulation monitor based on chromatogram of transformer oil. after the analysis of deflection sources in routine chromatogram of oil test, the paper brings into effect successfully the equipment on the base of characteristic infiltrative film monitoring six gases dissolved in transformer oil in the pingliang substation 2 # transformer. through analyzing a great deal practical data, it is proved that the monitoring system is stable and reliable, and has the ability to show the transformer ' s running state

    論文通過對平涼110kv變電站實施主變壓器油色譜在線監測及目前國內外對變壓器油色譜在線監測技術的現狀分析,結合影響常規油色譜測量結果及誤差來源分析,在平涼變電站2 #主變壓器上成功實施了以滲透氣體膜原理為基礎的變壓器油中六種溶解氣體在線監測及診斷裝置,通過大量運行數據分析,系統運行穩定,能正確反映變壓器的實際運行情況,並有效抓住了變壓器的一次故障,可作為狀態維修的依據。
  19. Safety management rules for oil and gas field power transformer substation

    油氣田變電所安全管理規定
  20. The simulation center is one of the key training departments in hebei power corporation. it provides the training programs of power plant and grid control, operation of transformer substation, anti - accident practice, etc. it offers a close to real environment for operation technique training, evaluation and consulting. the simulation center has a broad cooperation with national wide power plants, power companies, and research institutes and provides a high quality training service

    河北省電力公司模擬技術培訓中心是河北省電力公司實施科教興電人才戰略的重要培訓基地之一,模擬培訓大樓於1992年落成,建築面積2215 ,內設模擬培訓廳主機房辦公室會議室資料室等,具備承擔電廠和變電調度運行調試及相關管理人員的生產準備培訓在崗培訓驗證培訓技能鑒定反事故演習和培訓技術比賽運行技術咨詢和學生實習培訓的能力,並與來自全國各地的電廠和科研院所進行著廣泛的技術交流與合作,同時提供優質的培訓服務。
分享友人