preliminary design report 中文意思是什麼

preliminary design report 解釋
初步設計報告
  • preliminary : adj 1 預備的;初步的,初級的。2 序言性的,緒言的。n 1 〈常 pl 〉初步,開端;預備行為[步驟、措施]...
  • design : vt 1 計劃,企圖,立意要…。2 指定,預定;留給,留著。3 設計,草擬,擬定,籌劃;起草,畫草圖,打(...
  • report : vt 1 告知,報告,匯報;報導(新聞、調查結果等);發表,公布,發表公報。2 傳達(人的話);轉述;傳...
  1. Group leader : responsible for coordination of group works, design and completion of the preliminary model, finical management, group photography, group purchase, manufacture, cable arrangements, writing the final report

    組長:負責小組工作協調、初步模型設計與製作、財務管理、小組攝影、小組采購、現場加工、配線、書面報告之設計篇撰文。
  2. Project proposal, feasibility rearch report, preliminary design and working drawing design in steel rolling projects, including product lines such as bar mill, wire mill, tube mill and strip mill ect

    軋鋼(含型、線、管、帶等生產線)工程設計的各階段工作,項目建議書、可行性研究、初步設計,施工圖設計。
  3. Being resipansible for technology guality of this unit, i have arganized and completed or then 10 great consultative projects in meteluvgical industing including feasible research repart and preliminary design of dan yang ring - type sintering plant loaned from world bank. designed no. 6 semi - contiuars rolling mill line of shagang group ; nangang group steel making plant water treatinent system, feasible research report and preliminarg design of nangang group no. 3 continuous casting machiue and hebei wwan iron making co. 24m2 rinn - tgpe sintering plant, as chief - disigner, none argamizing working drawing disign far it

    作為本單位技術質量負責人,近年來組織了完成了10餘項較大規模的冶多工程咨詢任務,其中包括世行貸款的丹陽環燒工程可研和初步設計;擔負港沙鋼集團六軋車間半連軋生產線設計;南鋼集團煉鋼廠水處理系統完善;南鋼集團煉鋼廠矩形櫃連鑄可研及初步設計;河北武安市鐵業公司24m ^ 2環燒工程擔任總設計師,完成了初步設計,正組織開展施工圖設計。
  4. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  5. Project construction for wood processing and drying, artificial board and face decoration, incloding the proposal report, overall plan, research for possibility, preliminary design, design of construction

    木材加工及乾燥、人造板及飾面的工程建設,含項目建議書、總體規劃、可行性研究、初步設計、施工圖設計。
  6. The west kowloon cultural district traffic impact assessment final report in the cd - rom suggested 415 parking spaces for private cars for the core arts and cultural facilities while the schedule of accommodation and preliminary design brief for core arts and cultural facilities in the cd - rom stated a total of 2, 300 parking spaces for private cars for these facilities

    載于光碟內的西九龍文娛藝術區交通影響評估最後報告建議,應為核心文藝設施設置415個私家車停車位,但光碟內的核心文藝設施用途分配表和初步設計大綱則規定,應為這些設施合共設置2300個私家車停車位。
  7. Understand hydraulic fracturing engineering, prefer worked as frac engineer or sand control field engineer before, can use stimplan, or fraccad, myer, fracpro, etc to do preliminary design, mini frac analysis, post job match and report, more than 3 years would be an advantage

    對防砂,壓裂井下工具和地面泵送設備有較深的理解,有實際操泵經驗,曾經帶隊作業從事井下防砂壓裂工具操作或地面設備操作。
分享友人