preliminary scheme 中文意思是什麼

preliminary scheme 解釋
初步規劃
  • preliminary : adj 1 預備的;初步的,初級的。2 序言性的,緒言的。n 1 〈常 pl 〉初步,開端;預備行為[步驟、措施]...
  • scheme : n 1 計劃;方案;路線;設計。2 系統;配合;組織。3 綱目;表;清單;分類表;大綱。4 謀劃,策劃;詭...
  1. The researcher adopts the scheme of learning strategies given by o ' malley and chamot ( 1990 ) to illustrate the significance of using learning strategies in english learning, mainly in listening and speaking activities which are dominant in english classes at the preliminary stage of primary school. various metacognitive, cognitive, social and affective learning strategies are presented in this chapter

    採用o 』 malley和chamot )的學習策略體系,詳細介紹了各種策略(包括認知策略、元認知策略、社會與情感策略)的內容並結合小學生的心理特點和認知特點論述了在英語學習中運用學習策略的重要性口第五章是實驗報告。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  3. Emsd will then vet the preliminary cooling tower ( s ) installation proposal, and forward the application to wsd for further process or approval provided that the cooling tower ( s ) installation satisfies the latest requirements stipulated in the pilot scheme

    機電工程署會審核冷卻塔裝置的初步建議,並且將符合先行性計劃最新訂定的要求的申請轉交水務署繼續處理及審批。
  4. This paper presents the important effect of construction cost analysis in the schematic design stage based upon the preliminary design of liberation bridge in guilin city, and indicates that a reasonable, safe and economical design scheme can only be obtained when the construction cost analysis is closely mordinated with the structural design of the project

    本文根據桂林市解放橋的初步設計,介紹經濟分析在方案設計階段的重要作用,同時說明只有結構設計和造價分析密切配合,才能獲得合理、安全、經濟的設計方案。
  5. According to the design scheme of dishing axial - symmetric unmanned helicopter, the configuration and preliminary parameters are determined, and the general performance characteristics of the helicopter has been computed

    初步設計了碟形無人直升機的機身外形、旋翼系統、操縱系統,對全機總體結構進行了布置。
  6. Camera calibration, depth maps recovering and constructing representation scheme are important issues in ibr, on which our research is concentrating. camera calibration is the preliminary step towards deriving metric information from the images

    相機定標、圖像深度信息提取和建立圖像模型是圖像繪制技術的重要研究內容,本文著重對這些問題開展研究。
  7. Issues to be reviewed included preliminary vetting of the merits of an application ; the eligibility criteria for joining the panel of counsel ; assignment of cases to lawyers not on the panels ; frequency of progress reports ; time taken by lad to review its decision not to grant legal aid following issue of a counsel s certificate stating that the applicant had a reasonable chance of success in the intended appeal to cfa and possible expansion in the scope of the scheme

    檢討的事宜包括初步審查申請的成功機會納入大律師名冊的資格準則外判案件予非名冊律師進度報告的次數如發出大律師證明書證明申請人上訴至終審法院將有合理成功機會,法援署覆核其拒批法援的決定所需的時間,以及計劃可能擴大的范圍。
  8. Preliminary study of the processing scheme of a high viscous crude from liaohe oil field

    遼河超稠原油加工方案的初步研究
  9. A preliminary suggestion is made concerning network scheme of rbn dgps in china

    系統聯網方案的初步設想與建議
  10. Under stage 2a of the harbour area treatment scheme, the preliminary treatment works on the northern, western and southwestern shores of hong kong island will be upgraded

    在凈化海港計劃第二期甲,港島北面和西南面的初級污水處理設施將會擴建。
  11. Harbour area treatment scheme, stage 2a - planning and design of the upgrading works of stonecutters island sewage treatment works and the preliminary treatment works

    凈化海港計劃第二期甲昂船洲污水處理廠及初級污水處理廠改善工程的規劃和設計
  12. Traditionally, the design process of weapon system consists of the following steps : the user puts forward requirements, and the designer goes thiough scheme argumentation, preliminary design, detail design and finalizes the design, finally weapon system is handed over to the militare to operate

    傳統的設計過程一般是由用戶方提出性能要求,由工業部門經過方案論證、初步設計、詳細設計及進行各種試驗,最後定型生產並裝備到部隊。
  13. The article have devoted the energy to study how to plan logistics nodes and have got some research results or some advises for the planning of nanking logistics node. firstly, it have predicted the quantity of the demand for logistics about fives years. secondly, the essay have preliminary researched the program of the nodes according to the quantity. then, we have analyzed the method of program, the proposal of the address, the size of the nodes and so on in detail. lastly, the essay have got the planning scheme which is to organize the logistics nodes into an organic integral

    依據系統工程和物流工程的相關理論,首先預測出南京市未來五年內的物流需求量;然後以此預測量為主要依據對南京市物流節點的規劃設計進行了初步探討,並詳細分析了物流節點規劃方法、選址方案、節點規模的確定;最後提出了以三大物流基地為一體、功能互補的物流節點規劃方案。
  14. This system possesses the friendly interface, and stronger knowledge reasoning ability and preliminary self - study ability with the bases of database and model base, the new functions which the old system does n ' t have, have been realized. the system has avoided the wholly renovation of the old equipments in the renovation scheme, while meeting the needs of renovating plan, the cost of pumping station renovation has been reduced. the real supporting of decision making has been provided for pumping station renovation

    該系統以數據庫和模型庫為基礎,具有友好的人機界面,較強的知識推理能力,和初步的自學能力,著重實現了舊系統尚不具備的功能,該系統避免了改造方案中對原有設備的全盤更新,在滿足泵站規劃要求的同時,降低了泵站改造的成本,真正地為泵站改造過程提供決策支持,實踐表明,本系統具有較高的實用價值。
分享友人