prestressed concrete tower 中文意思是什麼

prestressed concrete tower 解釋
預應力混凝土塔
  • prestressed : 安裝預應力
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • tower : n 塔,樓塔;城堡;碉堡;要害地;〈罕用語〉(負傷鳥的)筆直向上飛;〈美國〉鐵路信號所。 a bell tow...
  1. Construction technology of hoisting tower and super long cased beam of prestressed concrete in huanglong sport center

    黃龍體育中心吊塔及超長預應力混凝土箱形外環梁施工技術
  2. Finally, with the research results, the author analyzes the two tv tower drums : the normal concrete tower and the presrtressed concrete tower. at the same time, the calculation reliability of prestressed concrete tower drum and dropping - coefficient of stiffness established in this paper has been proved

    最後,利用本論文的研究成果,對普通混凝土電視塔和預應力電視塔進行實例分析,驗證了本文建立的塔筒計算公式和剛度降低系數計算公式的可靠性。
  3. Thirdly, for the sake of convenience for calculating the section stiffness of prestressed concrete tower drum, this paper interprets the relationship between the stiffness dropping - coefficient of prestressed concrete tower drum cross and prestress degree. based on the cross stiffness coefficient under different prestress, a brief method for calculating the stiffness dropping - coefficient is presented in this paper

    第三,為了便於預應力混凝土塔筒截面剛度的計算,本文對塔筒截面剛度降低系數與截面預應力度的關系進行了研究,並根據不同預應力度下的截面剛度降低系數,歸納總結出一種簡單的剛度降低系數計算方法。
  4. Binzhou yellow river bridge is a three - tower cable - stayed bridge with prestressed concrete girders

    摘要濱州黃河大橋主橋是三塔預應力混凝土斜拉橋,主梁為預應力混凝土箱梁。
  5. Construction controlling of single tower and single cable prestressed concrete partition cable bridge

    預應力砼部分斜拉橋施工監控技術研究
  6. Referring the application of prestressed concrete tower drum in practice, this paper primarily focuses on a few problems mentioned below and the author hopes to offer some contribution to the revision of the new norm

    本文結合預應力混凝土塔筒在工程實際中的應用,主要針對以下幾個問題進行了研究,希望對新規范的修編起到一定的作用。
  7. Secondly, according to the change of calculation formula when prestress were added to the chapter of concrete tower drum, the paper has given the calculation formulas of prestressed concrete tower drum in limited states of carrying capacity and normal serviceability

    其次,針對高聳規范混凝土塔筒一章中增加預應力后,塔筒計算公式發生的變化,本文對預應力混凝土塔筒在承載能力極限狀態和正常使用極限狀態下的計算公式進行推導。
分享友人