primary shield 中文意思是什麼

primary shield 解釋
一次屏蔽層
  • primary : adj 1 第一的,最初的,初級的;初等的;基本的;基層的。2 主要的,為首的,第一位的。3 原始的,根本...
  • shield : n 1 盾;盾牌。2 罩;屏;屏蔽。3 防禦物;保護物。4 防禦;保護。5 保護者;庇護者[人]。6 盾形物;【...
  1. The primary contents are as follows : 1. according to the feature and the theory of shield tunnel construction, based on the factors that cause effects on environment, the workable monitoring project is established, which include principles of design, the selection of monitoring cross section, the layout of monitoring points, monitoring content and materials feedback. such as operation program, selection of earth pressure, wall - back grouting, rectification of shield machine, which are used to reduce the effect of construction on environment, are analyzed in detail

    完成的主要研究內容如下: 1 、根據盾構法的施工特點及原理,在明確了盾構施工安全影響因素的基礎上,從監測方案設計原則、監測斷面的選擇、監測點的布置、監測內容以及信息反饋等出發,提出行之有效的監測方案;詳細分析了掘進模式、土壓力選擇、壁后注漿、盾構糾偏等施工控制手段,用來減小盾構施工對周邊環境的影響。
  2. Blade flurry : this ability will now do damage to secondary targets when the primary target takes no damage due to a damage shield ( such as power word : shield )

    劍刃亂舞:在主目標帶著能吸收傷害的盾的情況下,這個技能也能正確的對第2個目標造成傷害了。
  3. Through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  4. Abstract : through simulating model tests of shield tunnel passing through the yellew river in the diversion project from south to north china, a systematic analysis on the primary factors affecting joint stiffness, including arrangement of joint bolt, thickness of annular packing of bolt, behavior and thickness of cushion material between two tube plates, magnitude of prestressing force of joint bolt and different stressed states at tube plate joint etc., are performed. the study results may provide reference for tube plate design of shield tunnel

    文摘:通過南水北調穿黃盾構隧道模擬模型試驗,對影響接頭剛度的主要因素即連接螺栓的布置、螺栓墊圈的厚度、管片與管片之間墊層材料的性能和厚度、連接螺栓的預緊力的大小及管片接頭不同的受力狀態進行了系統的分析,為盾構隧道管片設計提供了參考。
  5. Primary shield water system

    一次屏蔽水系統
分享友人