remaining load 中文意思是什麼

remaining load 解釋
遺留負載
  • remaining : 保持
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. One such scheme involves an improved control method designed to automatically quarantine trouble spots and gerrymander the remaining grid into islands of balanced load and generation

    可行方案之一是改良控制方法,自動將出錯的部份隔離起來,並將剩餘的電力輸送網重新劃分成數個供需平衡的獨立區域。
  2. The suggested control scheme fulfills automatic full range feedwater control by changing the structure and parameter of control system according to different stages of load, making full use of intelligent fuzzy logic function on conditons of remaining process system

    充分利用模糊智能控制系統的功能,在不改變工藝系統的情況下,從控制策略著手,隨工況的變化改變控制系統的參數,在鍋爐點火、升壓、並網、升負荷、降負荷全過程實現自動控制。
  3. The pertinence of actualizing the measures is particular, which requires the status of remaining heating and cooling load, building utility, meteorological data, etc. should synthetically be taken into consideration

    但節能技術措施的實施具有較強的針對性,需要綜合無余熱負荷(冷負荷) 、建築功能、氣象參數等多方面的因素進行綜合考慮。
  4. Because of effect of welding remaining stress on static strength, fatigue strength and structural stabilization of metal structure, the stress due to load is a result of heap of remaining stress

    由於焊接殘余應力對金屬結構靜強度、疲勞強度和結構穩定性的影響,載荷引起的應力是在殘余應力之上的迭加。
  5. The engineering work load detailed list reckoning method has the advantages of simple, clear, operation easily, remaining the account settlement rarely, etc compared with the present day running unit price budgeting method, which will be the direction of national engineering cost system reform, cost management first, this text states thoroughly the existing problem of the present day national engineering mode and price reckoning method, and the necessity of application right away and the existing problem, and then make a detailed discussion of the principle of quota reckoning and the engineering work load detailed list reckoning, so that we may be safe to draw such a conclusion that the new cost management system of the new price reckoning method is a necessary way to adapt to the international competition

    工程量清單計價法與目前我國實行的預算單價法相比,有簡單、清晰、可操作性強、不易留結算尾巴等優點;是我國工程造價體制改革的方向。本文首先全面闡述了目前我國工程造價管理模式和計價方式存在的問題以及現在推行的必要性及存在的問題,進而對定額計價和工程量清單計價的原理進行了詳細的論述,從而得出實行新的計價方式的造價管理體制是適應國際化競爭的必走之路。然後,對即將實行的工程量清單計價模式各單位需要面對的風險,提出幾點抵禦風險措施。
  6. The principle of the predigestion in geometry modeling is omitting the function part and the non - load - carrying process structure, and to the big and transition arc, the curve is replaced by straight line using the thought of curve and free - surface segmentation. the physical characteristic of the digital model reflect on remaining the main mechanical characteristic of the objects. the shell element model is used in strength analysis, stiffness analysis and dynamic analysis

    文中幾何建模的簡化原則是,略去功能件和非承載的工藝結構,對于大圓弧和過渡圓弧,以曲面分塊和曲線分段的思想進行適當的以直代曲;數模的物理特性反映在最大限度地保留對象的主要力學特性;在強度、剛度和動態分析中採用殼元模型,輕量化設計中採用梁元模型;材料特性根據所用材料定義其主要性能參數。
分享友人