river pier 中文意思是什麼

river pier 解釋
河墩
  • river : n 1 河,江。 Rriver Thames 或 the R Thames 泰晤士河; the Hudson R 〈美國〉哈得孫河。 the Rriver ...
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  1. On october 4 his imperial highness the crown prince boarded a water bus from the emergency use pier at akashicho, chuo ward to inspect the port of tokyo and the waterfront area along the sumidagawa river

    皇太子視察東京港10月4日皇太子在明石町防災用碼頭登上水上巴士,視察東京港和隅田川流域。從大學時代起,皇太子就已經開始致力於水上交通的調查。
  2. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  3. Slipform construction of songshan spillway weir gate pier on songjianghe river

    松江河松山溢洪道工程堰首閘墩滑模施工
  4. Dish from the yellow river in shandong jinan luo town pier, with the yellow river carp, the bombing from center

    此菜源於山東濟南黃河碼頭洛口鎮,用黃河鯉魚,經炸、熘而成。
  5. Based on the urgent need that pier protective device primarily designed needed to be tested its crashworthiness by the impact of ship in multi - situation, etc in multi - angle and multi - water, the writer analyzed the critical elements that affect the simulation of the collision between ship and pier protective device, and found the feasible way to deal with the conflict between calculation efficiency and precision. using this method and employing ansys / ls - dyna program, which is the universal nonlinear dynamic analysis software, a head - on collision between ship and pier protective device designed for guanzhou river bridge is simulated and presented, the simulation of time history course of full - scale mini - collision between ship and pier protective device was taken into reality with a spot of elements ( less than 21000 ) and scanty time ( 9 hours on p4 pc )

    本文在前人研究的基礎之上,結合船橋碰撞實例,對碰撞計算機模擬模擬的關鍵技術進行了研究,在效率與精度的矛盾中找到平衡,對一艘2000噸級散貨船橫橋向正撞廣東管洲河大橋橋墩防撞鋼套箱這一種工況進行了計算機模擬模擬,實現了以較小的單元和較短的時間模擬碰撞的時間歷程,模擬滿足工程精度要求,解決了目前碰撞模擬計算周期太長的問題,同時模擬模擬得到的結論對該類防撞裝置提供了有價值的參考。
  6. Construction of no. 2 pier main tower of minjiang river bridge

    三縣洲閩江大橋2號墩主塔施工
  7. The damming caused by a bridge pier is one of the aspects considered intentionly while building a bridge on a river which flood control standard is low and flood control cost is high so the study of damming is of important value

    橋墩壅水是在防洪標準低、防洪費用高的平原河道上修建橋梁時必須重點考慮的問題之一,其研究具有重要價值。
  8. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊箱圍堰採用工廠整體製造,下河浮運至墩位,利用錨墩施加預拉力精確定位的施工新工藝。
  9. The local current disturbance after bridge being built in qiantang estuary leads to correspond changes of riverbed near bridge. but there is not any impact on astronomical tide, runoff large - scaled river shape and riverbed after bridge being built. so it does n ' t change the formation of tidal bore at all after bridge being built, but there is some impact on the shape and intensity of tidal bore because of pier resistance

    在錢塘江河口建橋將引起局部水流的擾動及近區河床的相應變化,但不會對天文潮、徑流及大范圍河勢、河床產生影響,因而,建橋不會從根本上改變涌潮的產生,但橋墩阻力對涌潮形態和強度是有影響的。
  10. At last the hudson came into view ; and at a quarter - past eleven in the evening of the 11th, the train stopped in the station on the right bank of the river, before the very pier of the cunard line

    最後旅客們看到了赫德森河, 12月11日,晚上十一點一刻,火車到達了居納爾輪船公司右邊的車站,換句話說,也就是到達了英國和北美皇家郵船公司的碼頭。
  11. A leisurely sightseeing cruise in tokyo is available on an economical tour by water - bus. we introduce you " sumida river line, " a downtown route with an atmosphere from asakusa to hinode pier, and " kasai sealife park line, " an excursion on a river connecting hinode pier and kasai sealife park this time

    此次向您介紹連接淺草和日之出棧橋的充滿下町風情的"隅田川線" ,和很受歡迎的連接日之出棧橋和葛西臨海公園的海邊線路"葛西臨海公園線"這兩個小型水上之旅。
  12. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各墩位平臺及圍堰的方案比選,總結了該橋深水鋼圍堰的施工方法。
  13. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼圍堰與鉆孔樁相結合的復合基礎。
  14. The scheme helps to promote the economic co - operation between hong kong and the pearl river delta ". mrctv operators who are interested in the scheme may submit their applications to the harbour control section of the immigration department situated at 2f, central government pier, 32 man fai street, central

    有興趣為代理的內河船辦理預檢的航運業界或船務公司,可向位於中環民輝街三十二號中區政府碼頭二樓的入境處港口管制組提交申請。
  15. Melbourne, capital of victoria, forms a backdrop, with the san street bridge, for a coxless four rowing on the tranquil yarra river. inset : the city from st kilda pier

    以維多利亞州首府墨爾本和桑街橋為背景,一艘四人無舵手艇在靜靜的耶那河上劃行。插圖:從聖基爾達港看墨爾本城。
  16. Chapter five and six, a head - on collision between ship and pier protective device designed for guanzhou river bridge is simulated and presented

    第六章總結了全文,並對進一步的研究工作進行了展望。
  17. Steel wall cofferdam construction of the no. 3 main tower pier for tianxingzhou yangtze river bridge

    天興洲長江大橋3號主塔墩鋼吊箱圍堰施工
分享友人