road construction work 中文意思是什麼

road construction work 解釋
築路工程
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • work : n 1 工作,操作,勞動,作業;工件;功課;努力;行為,作用。2 (待辦的)事務,業務;職業。3 〈前有...
  1. The road construction work is in progress.

    築路工程正在進行中。
  2. The cement - concrete road paver and it ' s craft work of the construction

    滑模式水泥混凝土攤鋪機及其施工工藝
  3. Work on the primary road link to ma on shan town centre is scheduled for completion in 2002. five public housing estateshome ownership scheme projects are under construction

    馬鞍山市中心主要連接路工程定於二零零二年完成。五個公共屋?居屋屋苑的工程項目正在施工。
  4. Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress

    大澳污水渠與東北河堤建造工程及地盤平整工程、長洲舊墟道路改善工程,以及南丫島榕樹灣的填海、道路及渠務工程,均在進行中。
  5. Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction

    土木工程和路面結構用非粘合和液壓粘合材料用集料
  6. It is one foundational work of large - scale construction and enormous investment. the departments of the highway design must be required to make decision according to the indexes, such as rational highway capacity, level of service and road alignments, etc. if not, the huge wasting and back - end ecocatastrophe will be brought

    這是一項建設規模宏大、投資規模巨大的基礎工程,要求各級部門在公路設計時,必須依據合理的公路通行能力、服務水平、道路線形等指標來確定,防止工程投資的巨額浪費和後期的生態災難。
  7. The application of modified asphalt becomes necessary in the construction of high - grade road, as the traffic and wheel load increases. the object of research work for compatibility of modified asphalt is to the high - point of modifying effect

    隨著交通量的增大、軸載的增加,在高等級公路的建設中改性瀝青的應用勢在必行,通過改性瀝青的配伍性研究可使瀝青的改性效果達到最佳。
  8. Wiring distribution systems for construction, agricultural, and off - road work machines

    建築農業和野外作業機器的布線系統
  9. According the overal plan of nanbei lake scenic spot, the goverment will first expand the green planting work along the nanbei lake road, the path sanwan to qingchaoding. as the landscape design and construction will be open potential investirs and the goverment prefer bt form

    根據景區總體規劃及景觀建設需要,分輕重緩急,擬先期對南北湖大道、三灣至鷹巢頂道路沿線兩側進行地形改造及景觀綠化,其中涉及景觀建設有投資方建設,政府按合同約定價格及方式予以回購。
  10. Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction ; german version en 13242 : 2002

    土木工程和道路建築用非結合和液壓結合材料用集料
  11. Apply to the temporary construction houses of such field work as the road, railway, building, etc. ; urban municipal administration, commerce and other provisional houses, for instance : temporary office, meeting room, command post, dormitory, temporary shop, temporary school, temporary hospital, temporary parking area, temporary exhibition hall, temporary maintenance, temporary distribution room, temporary service station, etc.

    廣泛應用於道路鐵路建築等野外作業的臨時施工用房城市市政商業及其他臨時性用房,如:臨時辦公室會議室指揮部宿舍及臨時商店臨時學校臨時醫院臨時停車場臨時展覽館臨時維修部臨時配電房臨時加油站等。
  12. Apply to the temporary construction houses of such field work as the road, railway, building, etc. ; urban municipal administration, commerce and other provisional houses, for instance : temporary office, meeting room, command post, dormitory, temporary shop, temporary school, temporary hospital, temporary parking area, temporary exhibition hall, temporary maintenance, temporary service station, etc. shenzhen yazhi integrated house co., ltd

    廣泛應用於道路鐵路建築等野外作業的臨時施工用房城市市政商業及其他臨時性用房,如:臨時辦公室會議室指揮部宿舍及臨時商店臨時學校臨時醫院臨時停車場臨時展覽館臨時維修部臨時加油站等。
  13. Reclamation, road and drainage works at yung shue wan on lamma island are also in progress. construction of the north - eastern riverwall and site formation work adjacent to lung tin estate in tai o is scheduled for completion in early 2002

    南丫島榕樹灣的填海、道路及渠務工程也在進行。大澳龍田?毗鄰的東北河堤建造工程及地盤平整工程,預定在二零零二年年初完成。
  14. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨水管道中遇到的技術難題,進行手掘式工具管砂土層頂管法施工技術試驗研究,在研究中考慮砂土層存在的后靠土體移位、變形,工具管難以進入出洞土體,挖掘面易坍塌、管道中心易偏差及難糾偏等問題,通過對后靠土體和挖掘面的穩定計算及偏差產生原因的理論分析,提出並採用后靠土體換填加固,出洞土體換填加固,以及在工具管頭部設置管帽、格柵、糾偏系統等技術措施
  15. After acquiring the land for the hsr chiayi station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵嘉義車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程共同管道工程自來水工程及相關管線埋設工程等。
  16. After acquiring the land for the hsr taoyuan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, irrigation, transplanting, common duct, water engineering, piping and bridge work

    高鐵桃園車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程灌溉工程植栽移植工程共同管道工程自來水工程相關管線埋設工程及橋梁工程等。
  17. After acquiring the land for the hsr taichung station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵臺中車站地區區段徵收公共工程施工項目包括:整地工程道路工程排水工程自來水工程污水工程公共照明工作及傳統管線埋設工程橋梁工程等。
  18. With the completion of construction work on the final section of ring road no. 8 kanpachi dori, the road was fully opened to traffic at 12 noon on may 28

    由於8號環線最後部分的修築工程完畢,此道路在5月28日的中午12點全線開通。
  19. This photo shows road work, which is a kind of general construction work

    下圖顯示屬建築工程的道路工程:
  20. Under the ordinance, construction activities are grouped into two categories and are controlled by means of a system of construction noise permits : general construction work for example, excavation, renovation, road work ; and

    條例將建築工程分為兩類,並透過簽發建築噪音許可證的制度來管制a一般建築工程例如挖土裝修及道路工程及b撞擊式打樁工程例如使用油壓錘或吊錘。
分享友人