road construction works 中文意思是什麼

road construction works 解釋
道路建造工程
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • works : 的印表機描述格式
  1. There are many factors which contribute to the uneven surface of precast paving slabs. this may be due to the heavy loading caused by illegal parking of vehicles on the footway ; improper construction methods and substandard reinstatement works after road excavation

    (二)導致預制鋪路磚表面凹凸不平的因素很多,包括在行人路上違例泊車,以致路面負荷過重;鋪砌方法不當;以及掘路后進行的修復工程不合標準等。
  2. Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress

    大澳污水渠與東北河堤建造工程及地盤平整工程、長洲舊墟道路改善工程,以及南丫島榕樹灣的填海、道路及渠務工程,均在進行中。
  3. Re - alignment of existing carriageways and construction of new at - grade carriageways for the road junction ; and associated drainage, retaining wall and slope works

    為有關路口的現有行車道重新定線,並興建新的地面行車道及進行相關的渠務斜坡及護土墻工程。
  4. We are pleased to learn that the tourist attraction areas along canton road will not be substantially affected by the works during the construction of the ksl.

    我們很高興得悉九龍南線施工期間,沿廣東道一帶的旅遊景點將不會受到很大的影響。
  5. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公路近水邊圍的現有行人天橋nf85拆除現有臺階斜道興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士站及相關的道路排水系統和環境美化工程。
  6. Abstract : introduceing the pedestrian subway construction method works and fitted technical measures with the shallow depth and covered cut method at the saturated sand layer in the city in the light of pedestrian subway of xiangxi - road works

    文摘:結合向西路地下人行通道工程實例,介紹城市飽和含水砂層中採用淺埋暗挖法修建地下人行通道施工方法和配套技術措施。
  7. It comprises surplus materials from site clearance, excavation, construction, refurbishment, renovation, demolition and road works

    這包括由工地平整、掘土、樓宇建築、裝修、翻新、拆卸及道路等工程所產生的剩餘物料。
  8. Continuation of construction temporary works for retaining wall no. 44, above south lautau road near cheung sha

    繼續鄰近於長沙嶼南道的擋土墻編號44進行臨時泥釘鉆孔的工程
  9. Continuation of construction of temporary works for retaining wall no. 44, above south lautau road near cheung sha

    繼續鄰近於長沙嶼南道的擋土墻編號44進行臨時泥釘鉆孔的工程
  10. Zhejiang 8 amounting to tunnel engineering limited company is alley of well of bridge of road surface of channel of pilot a ship into a harbour of water and electricity of volume road tunnel, railroad channel, irrigation works, roadbed, mine, large cubic metro of earth and stone blow up the professional construction company that construction is an organic whole, have channel highway project to always contract two class aptitude

    浙江八達隧道工程有限公司是集公路隧道、鐵路隧道、水利水電引水隧道、路基路面橋梁、礦山井巷、大型土石方爆破施工為一體的專業施工企業,擁有隧道公路工程總承包貳級資質。
  11. Motorists are advised that in order to facilitate the carrying out of the construction works for road t3 in tai wai, the section of mei tin road northbound between chik fai street and tai wai road will be temporarily closed from 10. 30 p. m. to 5. 00 a. m

    號道路建造工程,介乎積輝街及大圍道之間的一段美田路北行方向,將由
  12. In west kowloon, good progress has been made on the stage i and ii drainage improvement works which are scheduled for completion in 2003 and substantial completion in 2004, respectively. in order to minimise the extent of road openings caused by the extensive drainage improvement works, construction of an underground flood storage tank

    為了盡量減少在西九龍區因進行排水改善工程而須掘路的范圍,渠務署於二零零一年年初在大坑東游樂場地底興建容量達十萬立方米的蓄洪池,以及在九龍塘興建一條長1
  13. Widening of fo tan road and related improvement measures in fo tan " general progress of construction works along

    火炭路擴闊工程及於火炭進行的相關改善工程
  14. To improve the traffic capacity at the fo tan and sui wo areas in sha tin, construction works to widen the existing fo tan road between yuen wo street and kwei tei street started in december for completion in 2002

    為增加沙田區火炭和穗禾一帶的交通流量,由源和路至桂地街的一段火炭路於十二月展開擴闊工程,預期工程可在二零零二年竣工。
  15. To improve the traffic capacity at the fo tan and sui wo areas in sha tin, construction works to widen the existing fo tan road between yuen wo street and kwei tei street started in december 1999 for completion in early 2003

    為增加沙田區火炭和穗禾一帶的交通容量,由源和路至桂地街的一段火炭路在一九九九年十二月展開擴闊工程,預期工程可在二零零三年年初竣工。
  16. Code for construction and acceptance of municipal road base works

    城市道路路基工程施工及驗收規范
  17. The piling works for tin wah road tin shui road elevated light rail stop have been completed. the contractor will carry out construction works for the light rail viaducts at the end of march

    天華路天瑞路交匯處輕鐵架空車站的樁柱工程已大致完成,興建架空橋工程將於三月底動工,預計于年底前完成。
  18. Construction works for the 4. 4km tin shui wai light rail extensions are now taking place at the junction of tin wah road and tin shui road. the contractor is carrying out piling works for the light rail viaducts and building an elevated light rail stop that will link the stop with nearby housing estates and shopping malls. at other sections of the extensions, the contractor is working on the surcharge

    4公里的天水圍新支線工程,現時工程主要集中在天華路天瑞路交匯處,承建商正興建架空橋的樁柱,該處將設置一個架空車站,連接鄰近的屋?及商場,至於其他路段,現時主要是進行壓土工程。
  19. Ancillary works including drainage, geotechnical, landscaping works, construction of watermains and installation of fire hydrants associated with the road widening works, and the construction of noise barriers and retaining walls and installation of traffic control and surveillance system

    進行附屬工程,包括進行渠務工程土力工程環境美化工程水務工程安裝消防栓和豎設隔音屏障和護土墻及配置交通控制及監察系統。
  20. To enhance accessibility by further promoting road construction works in the rural and less affluent areas

    進一步推動農村及貧困地區公路建設,提高鄉郊通達水平。
分享友人