road excavation 中文意思是什麼

road excavation 解釋
路基開挖
  • road : n 1 路,道路;街〈略 Rd 〉;公路;行車道;路程,行程。2 〈美國〉鐵路。3 方法,手段,辦法;(走向...
  • excavation : n. 1. 開鑿;發掘;挖掘;挖土,剜通。2. 穴,洞;坑道,開鑿成的山路。3. 【考古】出土文物,發掘物。
  1. Danglars hazarded a look on both sides of the road, and perceived monuments of a singular form, and his mind now recalled all the details morcerf had related, and comparing them with his own situation, he felt sure that he must be on the appian way. on the left, in a sort of valley, he perceived a circular excavation. it was caracalla s circus

    騰格拉爾大著膽子向路的兩邊望了一望,看見兩邊都是一式的紀念碑,馬爾塞夫那場冒險的種種細節在他的頭腦裏面盤桓著,他確信自己已被帶上了阿匹愛氏路上,在一塊象山谷似的地方,他看見有一個圓形凹陷的建築物。
  2. Secondly, to consummate the theory of fault to lay a more solid foundation, the article carried a comprehensive and thorough excavation on the coeval historical condition and cultural sources of each theory of fault lack of feelings. third, the article explained that because the theory development and the practice need, taking feelings into the theory of fault is urgency and necessity. at last, the article analyzed the contemporary scholar of criminal law failure in taking feelings into theory of fault, and had pointed out the road bring feelings into theory of fault

    本文首先通過三個層次的分析,表明了傳統罪過理論的不足之處,以及情感因素在傳統罪過理論分析中的尷尬處境;並對各個歷史形態的罪過理論的形成及其情感因素缺失的歷史條件和思想文化淵源進行了比較全面和深入的挖掘,以探源把脈,以能為進一步完善罪過理論奠定一個比較堅實的認識基礎;然後,說明了由於理論的發展和實踐的需要,罪過理論中納入情感因素的迫切性和必要性;最後,文章具體分析了當代刑法學者為將情感因素納入罪過理論所做努力之所以失敗的原因,進而提出了筆者自己對這一理論問題的解決方案。
  3. There are many factors which contribute to the uneven surface of precast paving slabs. this may be due to the heavy loading caused by illegal parking of vehicles on the footway ; improper construction methods and substandard reinstatement works after road excavation

    (二)導致預制鋪路磚表面凹凸不平的因素很多,包括在行人路上違例泊車,以致路面負荷過重;鋪砌方法不當;以及掘路后進行的修復工程不合標準等。
  4. " the well - planned road with even manholes proves that the citadel was managed by a very efficient administration, " mostafizur added. " i am confident further excavation will lead us to residue of a palace, " he said

    莫斯塔費祖爾還補充說: 「我敢肯定,通過進一步的挖掘,我們一定會找到古代宮殿的遺跡。 」
  5. " the citadel and a raft of artifacts may help redefine history of india, " said sufi mostafizur rahman, head of the department of archaeology at jahangirnagar university, near dhaka. " the well - planned road with even manholes proves that the citadel was managed by a very efficient administration, " mostafizur added. " i am confident further excavation will lead us to residue of a palace, " he said

    達卡賈罕吉爾納加爾大學考古系的系主任考古學家蘇非莫斯塔費祖爾拉赫曼表示, 「這條古代道路當初在建設時顯然經過了細心的設計,它上面甚至還附帶有下水道出入孔,這也可以證明它曾經處在一個工作效率極高的政權的管理下」 。
  6. Monitoring of government road excavation works

    監察政府的掘路工程
  7. Monitoring road excavation works

    監察掘路工程
  8. With an aim to arouse public awareness on the protection of underground utilities ( gas, water, drains, power, telecom, etc ) and work safety in road excavation, a series of open competitions will be jointly organized by hong kong institute of utility surveyors ( hkius ), the hong kong the hong kong association for the advancement of science and technology ( hkaast ), and utilityinfo institute ( uti )

    為提高大眾市民保護地下設施(煤氣、水管、水渠、電纜、視訊等)及道路安全的認知,香港管線測量師學會、香港工程師學會安全工程專責事務委員會、香港科技協進會及香港工程網路資料管理中心現正聯辦一系列地下管線相關之大型公開比賽。
  9. Analysis of stability about excavation and support of super - span road tunnel

    超大跨公路隧道開挖與支護穩定性分析
  10. Abstract : this paper gives the fe simulating analysis of the effect on road construction in the process of mine open - cut, analysis and evaluates stability of road foundation during many rock material steps excavation, concludes that the different conditions, for example, the rock caves, steps and the dis tance between the steps and road have influence on the road foundation stability

    文摘:針對礦山在地下開采轉為露天開采過程中,原地采區域在露天采場臺階開挖過程中對露天采場公路建設及運營的影響,進行了數值模擬分析,並對通過各種巖體介質的露天采場公路路基在臺階開挖和汽車運營過程中的穩定性進行了分析評價,得出了在不同條件下,如空洞地區、臺階材料介質、材料界面、開挖臺階與公路距離等對路基穩定性影響的評價。
  11. To allow construction of road network leading to sai kung town, a large scale rescue excavation funded by the civil engineering department was launched from october 2001 to september 2002

    本處為配合西貢市的道路建築工程,於二一年十月至二二年九月期間在沙下遺址進行大規模的搶救發掘,發掘經費由土木工程署撥款提供。
  12. It comprises surplus materials from site clearance, excavation, construction, refurbishment, renovation, demolition and road works

    這包括由工地平整、掘土、樓宇建築、裝修、翻新、拆卸及道路等工程所產生的剩餘物料。
  13. It has been reported that since 1997, the application procedure for road excavation permits ( eps ) has become increasingly complex and lengthy

    據報,自1997年至今,掘路許可證的申請程序日趨繁復,所需時間亦日見冗長。
  14. To manage road opening activities properly, road works proponents are required to have an excavation permit ( xp ) before commencement of works since the 70s

    為妥善管理道路開掘工程,自七十年代起,道路工程倡議人須領有掘路許可證,方可展開工程。
  15. Prior to the commencement of road construction in 2001, the antiquities and monuments office organized a large - scale rescue excavation for the sake of conserving the underground cultural remains, jointly with the shaanxi archaeology institute, hebei provincial institute of cultural relics, henan provincial institute of cultural relics and archaeology and the institute of cultural relics and archaeology of guangzhou. abundant ancient cultural relics were unearthed by this operation

    在2001年道路工程開展以前,為了確保沙下考古遺址的地下文物得到妥善的保護,古物古跡辦事處邀請了河北省文物研究所、河南省文物考古研究所、陜西省考古研究所及廣州市文物考古研究所組成聯合考古隊伍,進行大規模的考古發掘,並出土豐富的古代文化遺存。
  16. Based on the characteristics of the buried culvert under west no. 4 ring road in beijing for south - to - north water transfer project, the arrangement of the monitoring points and the monitoring results are emphatically described, and then a verification is made for the availability of the excavation parameters of the culvert through the analysis of the monitoring results, which provides a guidance for the construction of the later - period

    摘要結合南水北調北京西四環暗涵工程施工特點,著重介紹了南水北調西四環暗涵工程施工期監測點的布置和監測情況,並通過對觀測成果的整理分析,對暗涵開挖施工參數的可行性進行了驗證,並為後期的施工提供了指導。
  17. Chengdu longquan reixing engineering materials plant set product development, manufacturing and marketing its products and services into one, through the introduction, absorption, development and production of innovative self - drilling bolt grouting hollow products and exclusive ancillary machinery widely used in underground engineering ( traffic tunnel, hydraulic tunnels, mine roadway road and the various uses of anchorage support ) geotechnical engineering ( slope, dike rocks, the deep excavation anchorage support ) repair reinforcement project ( tunnels, dikes, dams, housing construction )

    成都龍泉瑞鑫工程材料廠集產品開發、生產製造及產品銷售與服務於一體,通過引進、吸收、開發、創新生產的自鉆式中空注漿錨桿系列產品及專用配套機械廣泛應用於地下工程(交通隧道,水工隧道,礦山巷道和各類用途的錨固支護)巖土工程(邊坡,堤巖,深基坑的錨固支護)修復加固工程(隧道,海堤,大壩,房屋建築) 。
  18. Based on the engineering practice of the side slope excavation of dayanchi section within the road for the construction traffic of guandi hydropower station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole - making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed ; for which the specific solutions are put forward herein as well

    摘要通過官地水電站對外交通公路大鹽池合同段邊坡開挖中預裂爆破的工程實踐,對預裂爆破的孔距選擇及下部嚴重出現巖坎、預裂面平整度、預裂爆破后輔助孔成孔率低、預裂與爆破區爆破網路以及預裂孔角度變化等問題進行分析,提出了具體的解決方法。
  19. " the highways department has established a dedicated audit inspection team to ensure that road excavation works are properly carried out

    路政署已成立專責審核巡查隊,以確保掘路工程妥善進行。
  20. The contractors are required to set out clearly the manpower arrangements in each stage of the road excavation works in their tenders for such works ; and

    (一)承建商須否在競投掘路工程的投標書內清楚列明每個工程階段的人手安排;及
分享友人