schedule control during construction 中文意思是什麼

schedule control during construction 解釋
工程進度控管
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  • control : n 1 支配,管理,管制,統制,控制;監督。2 抑制(力);壓制,節制,拘束;【農業】防治。3 檢查;核...
  • during : 在…的期間;在…的時候。 during the day [morning evening] (在)白天[早上,晚上]。 during and after...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. During the construction of the prophase works of dalong water control project, the supervisor can hold the construction progress and optimize various basic factors of the construction with quantitative management on all the contractors concerned in accordance with the requirement of the construction schedule before flood season ; with which the control objectives required by the owner are realized with the top construction quality rate over 90 %

    摘要在大隆水利樞紐前期工程施工中,監理部能把握汛前工程進度要求的主線,優化各生產要素,對多個承包商實行量化管理,實現了業主要求的控制目標,使完工項目質量評定優良率超過90 % 。
  2. Schedule control during construction

    工程進度控管
  3. Our services include project feasibility study, project planning, pre - construction governmental procedure, construction, schedule and cost control and others through out the period of construction, and handling all issues during the warranty period

    我們的業務范圍包括:工程項目的可行性研究、規劃設計、工程前期的手續辦理、建築施工、工期和成本控制等階段,並在擔保期內負責處理各項相關事宜。
分享友人