section drawing 中文意思是什麼

section drawing 解釋
截面圖
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • drawing : n 1 延引,牽引;引誘。2 抽簽;拈鬮。3 【機械工程】拔絲;沖壓成形。4 描畫,制圖;圖,圖形;素描;...
  1. At the same time, the section studies a new amendable method on drawing - up the dynamic extension forms of the motion input - output forms, it discusses the defer problem of input - output analysis too. meanwhile, it points out the fact that motional inut - ouput is a motional problem. however, the authentic economical running which recreates constantly is continual and dynamical, that is to say, it have to think about investing

    本章還從靜態投入產出模型入手,研究了利用動態投入產出模型編制投入產出表的一種新修正方法,討論了投入產出分析中時滯問題,並指出,靜態投入產出模型是一個靜態問題,而現實生活中的經濟運行是連續性的,動態的,不斷擴大再生產,也就是需要考慮投資的問題,文中還討論了規劃問題和預測問題的前提條件。
  2. To avoid cluttering the drawing, the dip section may be projected parallel to itself, to one side.

    為了避免線條紊亂,剖面可以平移到一側。
  3. The application of opengl technology in drawing geological section map

    技術及其在地質剖面圖繪制中的應用
  4. Drawing a geological section or plane graph with computer aided design

    地質剖面圖和平面圖的計算機輔助繪制
  5. This thesis primarily makes below the work of a few aspects : ( 1 ) the method to append the section line in the geological section plane and the geological plane graph intersected each other ; ( 2 ) the principle and method that automatic determinate of orebody on transverse section with the neural network theory was presented, and draw the slippery boundary of ore ; ( 3 ) the method that drawing the surveying well and lane way engineering in the geological and survey graph ; ( 4 ) the method to automatic calculation and statistics output ore reserves and grade ; ( 5 ) the method that automatic creating the geology cross section of the hole ; this thesis realizes automation for managing geological graph based on the substantive research work

    本論文主要作了以下幾個方面的工作: ( 1 )提出了在相交平面圖和剖面圖中添加剖面剖切線的方法; ( 2 )提出了應用人工神經網路理論確定剖面中礦體界線的理論和方法以及礦巖界線圓滑的原理與方法; ( 3 )實現了礦山生產實測工程數據處理與地測圖件的有機結合; ( 4 )實現了礦塊地質品位和儲量的自動計算和統計輸出; ( 5 )提出了中深孔炮孔排面地質剖面圖自動剖切的原理和方法。本論文在大量研究工作基礎上,實現了地測圖件管理的計算機自動化。
  6. A number of constructions drawing method and their rule that are similar like variable section arch

    一束形似變截面圓拱的構造圖式方法及其規律
  7. Clipping drawing can be restricted to a particular section of the client area

    剪裁-繪圖可以受限於客戶區的特殊區域。
  8. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  9. If increasing drawing interval, the movement and flow range of top coal will enlarge, and the velocity gradient on flow cross - section will diminish, so that it is good for controlling the flow rate of thin sand among loose top coal

    研究表明,加大放煤步距,頂煤運移流動的范圍變大,流動斷面內速度梯度變小,有利於控制細砂的下竄速度。
  10. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜井採用小斷面導硐后刷大、高負壓多排鉆強抽,密集交叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  11. Shaped drawing dies for non - ferrous metal of square and flat section

    有色金屬方材及扁材拉型模
  12. Shaped drawing dies for steel of square and flat section

    方鋼及扁鋼型材的成形拉模
  13. Second, our country has n ' t made standardize system of the information resources yet. drawing up standardize isn ’ t known correctly, and is carried on in the all levels government, different section, some officials lack to standardize consciousness

    (二)信息標準建設是在各級政府、不同部門中零散進行,條塊分割嚴重,缺乏統一規劃,缺乏標準化的意識,沒有形成一個完整的標準化體系。
  14. A summary introduction is made of the electrovibrating ore - drawing techniques that have been used in shizishan copper mine, which includes the electrovibrating ore drawing of the ore pass in middle section, the one for in - stope ore drawing, the one for the main underground ore bin and the one for the coarse ore bin in the concentrator

    針對獅子山銅礦應用中的幾種電振動放礦技術進行了總結性介紹,它們分別是:中段溜井電振動放礦、采場內電振動放礦、坑下主礦倉電振動放礦、選礦廠粗礦倉電振動放礦。
  15. During the process of the midship section design, drawing and calculating are carried through crossly ; moreover, with the development of this step, design of detailed structures would be deepened continuously. so drawing and calculating of the midship structure must be modificated again and again, until the perfect consistence between the data and graph is realized

    在進行舯部結構設計時,繪圖工作與計算工作一般是交叉進行的;而且,隨著結構設計階段的發展,局部性結構設計不斷深化,舯部結構的計算和圖紙的繪制均不免要反復加以修改,直到彼此能相互準確呼應。
  16. By using it, the section mapping drawings of multi - types & complex pipeline system can be automatically generated through the entity crossing operation. this method composes of the following three key steps. in the first, different graphic entities are identified from the complex pipelines drawing in terms of the layer information they owned, then the correspondent information is to be encapsulated to keep the spatial data completeness of the graphic symbols

    該方法通過管線系統設計圖中的圖形實體的分層處理與信息封裝,首先實現了復雜管線實體的自動識別並確保了圖形實體具有對應管線實體對象的完備空間信息;在此基礎上,根據用戶給出的任意位置截切線,構造隱式描述的截切面並與隱式描述的管線實體進行求交運算;最後通過對求交結果的坐標變換,生成能夠直觀反映出多類型復雜管線系統空間分佈信息的截切面映射圖。
  17. In order to effectively use the vacant space beside the passenger train paths in the train running diagram of mixed passenger and freight lines and draw more freight train paths to improve the carrying capacity, the essay analyzes the reasonable drawing plan for freight train paths beside single passenger train arid two passenger trains respectively on the double tracked section with automatic blocking system according to the principle of minimal additional removal time and on the basis of the calculation method of removal coefficient table

    摘要為了在客貨共線運行圖中有效利用旅客列車運行線兩側的空檔,盡可能多地鋪畫貨物列車運行線,以提高區段通過能力,在扣除系數表格計演算法的基礎上,按照附加扣除時間最少的原則,分析了在雙線自動閉塞區段單列旅客列車和2列旅客列車兩側貨物列車運行線的合理鋪畫方案。
  18. 3to complete the product application design of project. include the establishment of design concept, lay - out plans, elevation drawing, section drawing, standard system detail, detail drawing and necessary technical information

    進行項目的產品應用設計,包括:產品平面布置圖、立面圖、剖面圖、標準產品系統安裝圖、節點詳圖及必要的技術說明。
  19. A study on transformation method between the 3d coordinates of a geological prospecting line section and the 2d coordinates of the line section drawing

    勘探線剖面三維坐標與剖面圖二維坐標轉換計算方法
  20. This system adopt matlab replace autocad carry on circuit of vertical section drawing and supportter disposition, adopt vc6, vf6 replace traditional computer language based on dos, make the system function stronger and operation speed fastter, have more friendly man - machine interfaces, input and export further more convenient

    本軟體採用matlab6 . 1 、 vc6 . 0 、 vf6 . 0等可視化語言進行開發,人機界面十分友善,輸入輸出非常方便。文章由文獻綜述和學位論文兩部分組成。
分享友人