section of construction project 中文意思是什麼

section of construction project 解釋
工段
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • of : OF =Old French 古法語。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  3. Based on the project imbrued especially by hunan province construction office, the study of this paper includes four parts as follows : the first part does some simplify on the characters of the rc material under high temperature. after transferring the rc section under fire to equivalent one at normal temperature based on the stiffness and intensity equivalent, the rc members under fire can be calculated as ones at normal temperature

    主要研究內容如下: ( 1 )基於剛度等效或強度等效原則,根據截面各點材料力學性能的退化,把受火鋼筋混凝土非均勻截面等效成常溫下的鋼筋混凝土截面,使得高溫下構件剛度和強度的計算可按常溫下的計算理論進行。
  4. Petrifaction industry section in plan for construction, the stretch of the oil refinery project at the southern bank of meizhou bay

    規劃建設石化工業規劃小區,承接湄洲灣南岸煉化一體化石化項目延伸。
  5. The application of tbm construction method in 7 tunnel of connection section of yellow river diversion project

    萬家寨引黃北干線1號隧洞出口段優化設計
  6. With the advancement of calculating theory and design technology, as well as the wide application of computer in the engineering design area, the bridge structure is developing towards large span, thin section, and prestress. the bridge construction scheme is also made great progress. with the research on construction project, the construction of the bridges over the river or the gorge is becoming more and more simple, efficient and economical

    隨著結構計算理論和設計技術的進步,以及計算機在工程設計領域的廣泛應用,橋梁結構向大跨度、薄截面、預應力方向發展,橋梁的施工方案也取得了很大的進展,通過施工方案的研究,使位於大江大河上及深山峽谷中的橋梁施工作業更加簡單高效、經濟合理。
  7. Abstract : the paper is based on the working particle for sever al bridges in the construction of w8 section of sheng - yan railway project. it sy stematicaly instructs the construction method of bore - hole filling pile in the rock area with under - earth mined - out layer

    文摘:筆者以神延鐵路w8標段多座橋梁工程實踐為基礎,系統介紹了有地下采空層的巖石地區鉆孔灌注樁施工的方法
  8. Through a real project - - - - - - " b " bid section of shijiazhuang south bridge. it is proved that high - low brace gantry crane wide double guiding girder method is a good and new technique of bridge construction

    經過實際工程(石家莊南環大橋b標段)的施工實踐驗證,證明高低支腿龍門吊寬幅雙導梁法是一種優良的橋梁工程施工新技術。
  9. The primary contents are as follows : 1. according to the feature and the theory of shield tunnel construction, based on the factors that cause effects on environment, the workable monitoring project is established, which include principles of design, the selection of monitoring cross section, the layout of monitoring points, monitoring content and materials feedback. such as operation program, selection of earth pressure, wall - back grouting, rectification of shield machine, which are used to reduce the effect of construction on environment, are analyzed in detail

    完成的主要研究內容如下: 1 、根據盾構法的施工特點及原理,在明確了盾構施工安全影響因素的基礎上,從監測方案設計原則、監測斷面的選擇、監測點的布置、監測內容以及信息反饋等出發,提出行之有效的監測方案;詳細分析了掘進模式、土壓力選擇、壁后注漿、盾構糾偏等施工控制手段,用來減小盾構施工對周邊環境的影響。
  10. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  11. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  12. This project together with central reclamation phases i, ii and iii will mainly provide land for the construction of the central - wan chai bypass and the island eastern corridor link, the hong kong island section of the shatin to central link and the north hong kong island line

    這計劃會連同中環填海計劃第i ii及iii期,主要提供土地興建中環及灣仔繞道和東區走廊連接路沙田至中環線鐵路港島段及北港島鐵路線。
  13. Integrated the 8th section of sui - yu railway project being built bycrec ( china railway engineering civil co. ltd ) into this paper and proceeding with the macrocosmic management of construction item, the author expatiates on how to focus on the center of the construction schedule goal and do well in schedule, quality, safety, cost and environment protection

    本文結合中鐵二局股份公司正在施工的遂(寧)渝(重慶)鐵路第8標段工程,從施工項目整體管理入手,闡述了如何圍繞施工進度總目標這個中心,從進度、質量、安全、成本、環水保管理搞好項目管理。
  14. With a purpose to provide basic data or figures for the feasible research of a project construction and its planning, taking the practical project of preselecting a factory location for an instance, using the principle and method of shallow seismic reflection, based on the area conditions, differences in physical features and disturbance, with experiments on typical sections of the construction area, one can draw reasonable measuring lines, choose right modes of producing and receiving waves, conduct primary and precise computer data processing, acquire a distinct reflected wave section from a shallow depth and explore the stratum structure in the preselected location and the distribution of longitudinal waves

    摘要結合某重大工程預選廠址項目的工程實例,利用淺層地震反射波法的原理和方法,根據現場的場地條件、物性差異和干擾情況等,結合典型地段的試驗,合理布置測線,選擇恰當的激發和接收方式,進行初步和精細的計算機資料處理,可以得到清晰的淺層反射剖面,準確地查明了預選廠址的地層結構和縱波速度分佈,為工程建設的可行性研究和規劃提供了基礎資料。
  15. The 4th section was the key section of whole article, and conducted the countermeasure study in the following law fields : engineering payment ensurence surety, legal demand on the available construction project fund, restlessly contradicted right, contract dissolution right, subrogation right, engineering payment compensation priority, the punish rule of engineering payment in arrears, construction industry enterprise law consciousness and law enforcement consciousness and level, so as to solve the problem of engineering payment in arrears in construction field radically

    第四章是本文的重點部分,該章節從工程款支付保證擔保、建設項目資金到位的法定要求、不安抗辯權和合同解除權、代位權、工程款優先受償權、拖欠工程款的處罰規則、建築業企業的法律意識及執法意識和執法水平等方面進行對策性研究,以期從根本上解決建設領域的拖欠工程款問題。
  16. This paper, as for the contradiction happened in design, construction, acceptance check when the quality of the project was needed and the building speed is different in every section of the road, the residual settlement a h is needed to be less than the standard value, launches the project - - - - - - the analysis on the settling velocity o f high earth fill sub - grade and the study of stability

    本文主要是針對近幾年來在設計、施工、竣工驗收在工程質量評定中所出現的矛盾? ?一條公路少至幾公里至幾十公里,甚至上百公里,由於各個標段完工速度不一致,其剩餘沉降值(即竣工驗收時) h要求小於「評定標準」 (即垂直變形3cm ) ;而進行的《高填方路基沉降速度分析與穩定性研究》課題研究。
  17. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
  18. Post - assessment for highway project is the final task in the management of highway construction project and its major content includes mainly the assessment of operation condition and benefit of the project during the check period. this paper develops a relation model between velocity and oil - consumption both for expressway and ordinary using the method of example comparison between ji - qing expressway and the corresponding section of 102 state - owned highway, which offers the basic data for transportation cost and further financial analysis

    高速公路后評價是高速公路建設項目管理的最後一個環節,主要內容以項目考核期運營情況及評價和項目效益評價為主.針對這個環節,本文應用實證對比分析的方法,以濟青高速公路和國道102線的實際交通情況為範例,應用統計方法建立了高速公路與普通公路的車速-油耗模型,為運輸成本及財務分析提供了基礎數據
  19. Construction measurement technology for main building in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期航站區航站樓工程施工測量技術
  20. Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project. based on theorize analysis, expriments of material properties and members under deformed vibration, verification of isolating and reducing vibration in building as well as construction technology and quality control, the effect of post - casting section suffered deformed vibration is studied thoroughly. through the analysis of 28 tests of shear strength with post - casting section under deformed vibration, the related laws are deduced. and the analysis of finite element method, the studies of quality control and construction technology are also completed

    通過現場測試、模型和試塊的模擬振動成型試驗、加載破壞試驗、理論分析、現場減振隔振試驗、施工工藝和質量控制等一系列全面、系統的研究工作,認真、深入地研究了現澆混凝土受火車行駛振動的影響,特別是在約束構件后澆濕接頭區段內現澆混凝土受火車行駛振動影響研究方面作出了開創性的工作,完成了振動使濕接頭區段受到彎曲變形影響條件下的構件模擬振動試驗、抗剪強度試驗。
分享友人