sequence equipment 中文意思是什麼

sequence equipment 解釋
程序裝置
  • sequence : n 1 繼續;接續;連續。2 順序;程序;次第;關系;關聯。3 後果;結果;接著發生的事;後事;後文。4 ...
  • equipment : n. 1. 〈常 pl. 〉設備,裝備,配件,配備物品。2. (一個企業除房地產以外的)固定資產。3. (工作必需的)知識,技能,修養。4. (火車)車輛;(汽車等)運輸配備。
  1. Technical specification for zero sequence current direction protection equipment

    零序電流方向保護裝置.技術條件
  2. Harmonics, reactive power, voltage flicker and negative - sequence current of power grids can affect the power quality and harm the power equipment badly

    摘要電網中存在諧波、無功、電壓閃變及負序電流等問題,嚴重影響電能質量,危害電力設備。
  3. Now the affect and the measure of hypo _ harmonics is in the research. the influence of negative sequence is almost eliminated along with the enlargement of the system ' s capacity and the alternate connection of traction substations. the fixed parallel compensate equipment applied in traction substations consist of a constant capacitor and a constant inductance, so its output is constant

    負序電流的問題已經因系統容量的增大、牽引變電所採用輪換接線方式而基本解決,電力部門實行的「反轉正計」 ,使採用對無功功率固定補償方式由於牽引負荷變化頻繁而出現補償容量不足或過補償現象,難以達到滿意效果。
  4. Abstract : this article retrospects the development of sequence control system in thermal power plants at home and abroad , especially introduces the three developmental stages of sequence control system in china over the past 35 years , i. e. : 1. starting stage ; 2. the second stage with programmable logic controller ( plc ) as core hardwares ; and 3. the third stage with sequence control systems of main and auxiliary equipment incorporated into the distributed control system ( dcs ) and with field bus control system ( fcs ) got involved. this article also appraises the features of sequence control system composed of different configurations and looks forward to the developmental tendency of this system for the next century

    文摘:回顧國內、外火電廠順序控制系統的發展,特別介紹35a來我國順序控制系統經歷的起步階段、以程序控制器( plc )為核心硬體的中期階段和主、輔機順序控制系統融入分散控制系統( dcs )階段、現場總線控制系統( fcs )介入階段,並對由不同形式組成的順序控制系統的特點進行評價,展望下一世紀該系統的發展趨勢。
  5. The risk assessment and the risk sequence of the equipment and piping of catalytic cracking unit in lanzhou petrochemical company were defined by applicating the risk - based inspection ( rbi ) technology, and the inspection program which offers scientific basis for repairing schedule and strategy was made according to different equipment, piping and different risk classes

    摘要通過運用基於風險的檢驗( rbi )技術對蘭州石化公司300萬噸年重油催化裂化裝置的靜設備和管道進行風險評估和風險排序,針對不同的設備,不同的風險等級制定了相應的檢驗策略,為制定裝置的檢修計劃和長期的檢修策略提供了一種科學方法。
  6. Electromechanical components for electronic equipment. basic testing procedures and measuring methods. part 11 : climatic tests. section 1 : test 11a. climatic sequence

    電子設備用機電元件.基本試驗程序和測量方法.第11部分:氣候試驗.第1節:試驗11a .氣候序列
  7. A completion time algorithm for the multiproduct batch scheduling problem in mixed intermediate storage ( mis ) policy is proposed. the transfer time, sequence - dependent setup time of equipment, and the effect of double transferring are considered in the algorithm

    提出了混合中間存儲策略下多產品間歇生產過程調度問題的一種完成時間演算法,該演算法考慮了產品傳輸時間,與產品生產順序有關的設備準備時間,中間存儲清洗時間以及中間存儲「雙傳輸」對完成時間的影響。
  8. Electrical safety in low voltage distribution systems up to 1000 v a. c. and 1500 v d. c. - equipment for testing, measuring or monitoring of protective measures - part 7 : phase sequence

    1000v交流和1500v直流的低壓分配系統的電氣安全.防護測量的試驗測量和監測設備.第7部分:相序
  9. Junma company established in 2000, had factory buildings with an area of 5000 square meters, the staff are about 200, there are professional design, 15 developers, our company specializes in various kinds of men and women in one set of producers of pack, the wallet and cell - phone cover, the equipment is advanced, first - class craft, the products are complete, collect designing, develop, produce, sell for enterprises of economic entity of a connected sequence

    駿馬公司創辦於2000年,擁有廠房面積5000平方米,員工200人,有專業設計、開發人員15人,本公司是專業生產各種男女包、票夾及手機皮套廠家,設備先進,一流工藝,產品齊全,是集設計、開發、生產、銷售為一條龍服務的經濟實體企業。
  10. Then the hierarchy model of maintenance sequence is established by means of analytical hierarchy process. maintenance sequence is obtained by means of constructing decision - matrix and multi - hierarchy synthesizing. finally, using the above - mentioned research findings synthetically, the dissertation develop an equipment maintenance policy decision - making support prototype system successfully and the situation of the prototype system ’ s primary application is also presented

    確定了影響裝備維修次序的因素指標及其權重,用層次分析法建立了裝備維修次序的層次結構模型,通過判斷矩陣和多層併合排列裝備的維修次序;最後,本文綜合利用上述研究成果,設計開發了裝備維修策略決策支持原型系統,並介紹了原型系統在某部隊的初步應用情況。
  11. Connectors for electronic equipment - tests and measurements - part 11 - 1 : climatic tests - test 11a : climatic sequence

    電子設備連接器.試驗和測量.第11 - 1部分:氣候試驗.試驗11a :氣候順序
  12. Electromechanical components for electronic equipment - basic testing procedures and measuring methods - part 11 : climatic tests - section 1 : test 11a : climatic sequence

    電子設備用機電元件.基本試驗程序和測量方法.第11部分:氣候試驗.第1節: 11a :氣候順序
  13. The construction processes of large - scale underground structure group are very complicated. in order to quicken the construction processes, reduce price and assure success, it is necessary that adopting scientific system simulation method to simulate the whole construction processes, to make all tunnels, all activities and all machine equipment harmonious and make construction sequence schedule reasonable

    大型地下洞室群施工過程是極其復雜的,採用科學的系統模擬方法對地下洞室群施工全過程進行模擬,使各洞室、工序及施工機械設備相互協調配合,使洞室群施工順序和施工進度計劃更加合理,對于加快洞室群施工進度,降低工程造價,保證工程順利進行非常必要。
  14. Electrical safety in low voltage distribution systems up to 1 kv a. c. and 1, 5 kv d. c. equipment for testing, measuring or monitoring of protective measures. part 7 : phase sequence

    最高可達1 kv交流電和1 . 5 kv直流電的低壓配電系統中的電氣安全性.試驗測量或保護測量監測用設備.第7部分:相序
  15. To the exploration, the author studies sailimu and buerjin wind - electricity field. the study shows the short circuit proportion supplied by wind - electricity is very high, so the wind - generator can " t be treated as a simple equipment that assumes energy, nor a simultaneous generator, if as an unsimultaneous generator, the short circuit will be different when the capacity changes, as a sequence, the relay will be influence too

    以上研究結果表明:風力發電機提供的短路電流在短路電流中占相當大的比例,因此不能將風力發電機作為簡單負荷處理,也不能視為同步機處理,即使作為異步機處理,當採用容量不同時,短路電流大小也有變化,因此,也就直接影響繼電保護的整定計算。
  16. Electromechanical components for electronic equipment - basic testing procedures and measuring methods - climatic tests - test 11a - climatic sequence

    電氣設備的機電元件.基本試驗程序和測量方法.氣候試驗.試驗11a .氣候後果
  17. Aiming at four analysis measures - spectrometric, ferro graphic, routine, and particulate counting, the author has established time - sequence model based on fuzzy estimation regulations, tentatively provided analysis standard criterion for failure analysis, and proposed fuzzy systematized model for diagnosis system of lubricant monitoring expert ; employing mathematical methods of fuzzy analysis, the author has established analytical synthetic evaluation model, analyzed the reasonability of analytical measures in lubricating oil and equipment condition evaluation, and provided extraction method model of information regulations for diagnosis system of lubricant monitoring expert by means of analyzing par ameters

    針對光譜、鐵譜、常規理化、顆粒計數四種分析手段,建立了基於模糊判斷規則的時序模型,並建立了輪機油液監控專家診斷系統所需的模糊分類器模型;採用模糊分析的數學方法,建立了綜合分析評判模型,並對各分析手段在潤滑油評定和評判設備狀態時的合理性進行闡述,為輪機油液監控智能診斷專家系統提供了一種通過特徵參數分析與處理,建立的規則信息提取方法和模型。
  18. Electrical safety in low voltage distribution systems up to 1000 v a. c. and 1500 v d. c. equipment for testing, measuring or monitoring of protective measures - phase sequence

    不超過交流1000v和直流1500v的低壓配電系統電氣安全性.防護測試測量或監測設備.相位序列
分享友人