shaft loading 中文意思是什麼

shaft loading 解釋
軸荷載
  • shaft : n 1 箭;箭桿。2 (槍、槌、斧等的)柄;矛。3 【植物;植物學】稈;莖;柄。4 【動物;動物學】羽軸;...
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  1. Loading and structure of shaft lining by shaft drilling in deep alluvium

    深厚表土中鉆井法鑿井的井壁外載和結構
  2. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  3. Then, by using the great fem programme and the drucker - prager model, the thesis establishes the pile - soil model of super - long piles, analyzes the mechanism of bearing and deformation of super - long piles under vertical loading systemically, studies the characteristics of q - s curve, bottom resistance, pile shaft resistance and critical length of super - long piles in detail, acquires some practical guidance conclusion. secondly, with a practical engineering, the author expatiates the bearing characters of super - long piles farther. the thesis points that super - long piles are frictional piles under the condition of working loading

    然後應用大型有限元程序,採用土的drucker - prazer模型,建立了超長樁分析計算的樁土模型,系統分析了超長樁在豎向荷載作用下的承載機理和變形特性,研究了超長樁的荷載?沉降特性,端阻、側阻的發揮性狀以及超長樁的有效樁長,得出了具有實際指導意義的結論。
  4. Torsional stress analysis of circular shaft under circumaxile shearing loading

    受周向剪切載荷的圓軸扭轉應力分析
  5. 2. mon - shaft pneumatic conic node printing plate loading, prompt and convenient for plate changing

    2無軸氣動錐頂裝版,換版省時方便。
  6. 2. non - shaft pneumatic conic node printing plate loading, prompt and convenient for plate changing

    2無軸氣動錐頂裝版,換版省時方便。
  7. 2. non - shaft pneumatic conic node printing plate loading, prompt and convenient printing plate changing

    2無軸氣動錐頂裝版,換版省時方便
  8. 4. non - shaft pneumatic conic node printing plate loading, prompt and convenient printing plate when change

    4無軸所頂式裝版,換版省時方便。
  9. 3. pneumatic backpressure moving erasing knife, non - shaft pneumatic conic node printing plate loading, prompt and convenient printing plate changing

    3氣動背壓式移動刮刀,無軸氣動錐頂裝版,換版省時方便。
  10. New way of deepening skip loading chamber construction in shaft

    立井延深箕斗裝載硐室施工新途徑
  11. Selection of the loading and unloading equipment for mine ' s main shaft and the relevant comprehensive tech - economic comparison

    主井裝卸載設備的選擇及綜合技術經濟比較
  12. If the using abrasion speed is low and the loading is not very big, but it undertakes heavy impact when running, it is better to apply thick wall shaft liner, for if the wall is too thin, the rigidity is not enough

    如果使用滑動磨擦速度較低,負載不是很大,但運轉時受很大的沖擊,此時應採用厚壁軸套。如果軸套壁薄,剛度不足,可與金屬外套復合使用。
  13. Through teat of relative vibration, center - line and center orbit of the shaft during starting - up and carrying load process, the abrasion mechanism, radial disturbance, loading status, and self - centering capability etc. of the the failured bearing have been analysed, and measures for preventing damage of bearing shoes being put forward

    摘要通過對機組起動及帶負荷過程中軸的相對振動、軸中心線、軸心軌跡的測試,對失效軸承的磨損機理、徑向擾動、承載狀況和軸承自調心能力等進行分析,提出了預防軸瓦損傷的措施。
  14. Using a loading and square - wave high voltage electric field, intermittent movement of the output shaft of the coupling was realized

    使用杠桿加載和給電流變液聯軸器施加方波高壓電場,實現了輸出軸的間歇轉動。
  15. The working condition of nylon shaft liner is determined by many factors, for example : the different formula, shaping technique, the design of shaft liner, installation method, loading features, running speed, lubricant condition, the working environment of shaft liner temperature, humidity and the influence of impurity, abrasion when working etc. so, when designing shaft liner, it is necessary to take consideration of all conditions

    鑄型尼軸套的許用工作情況是由很多因素決定的,例如不同配方和成型工藝所制得的材料物理機械性能,軸套的設計裝配方法,負載特點,運轉速度,潤滑情況,軸套的工作環境溫度濕度雜質的影響,工作時的摩擦條件,對磨材料的性能等。因此,在設計軸套時,應綜合考慮各個方面的因素。
  16. Secondly, considering the complexity of the analysis of inclined - loading pile, nonlinear finite element method is adopted to calculate the internal force and displacement of pile group under inclined loads, with the concept of equivalent width presented to simplify 3d problems into 2d problems. and a program is developed as well, which is able to consider the continuity, elastic - plasticity and layered characteristic of soil around the pile shaft. besides, the interactions among pile, base slab and soil are considered in this program and contact surface element is used to simulate slipping and crazing between pile and soil, or between base slab and soil under loads. then, the non - tension analysis is proposed, to reflect the low - tensile property of soil and concrete

    在此基礎上,針對傾斜荷載下群樁基礎分析中的復雜性,提出採用非線性有限元對傾斜荷載下群樁的內力及位移進行分析,應用樁的等效寬度概念將空間問題簡化為平面問題考慮,並開發出能考慮樁周土介質連續性、彈塑性、分層性等因素的傾斜荷載下群樁內力及位移分析的計算機程序,並在程序中考慮了樁、土、承臺的相互作用,提出了採用接觸面單元來考慮荷載作用下樁與土體及承臺與土體間的滑移、開裂;並在此基礎上,提出了傾斜荷載下群樁基礎的「無拉力」分析方法,可有效地反映土體及混凝土材料的低抗拉特性。
  17. Skip loading chamber and bottom shaft construction in jining no. 2 coal mine

    濟寧二號礦箕斗裝載硐室及下部井筒等施工
  18. Third, finite element analyses have been carried out for a notched shaft under proportional bending and torsional loading

    第三,採用有限元法對受彎扭情況下的缺口件進行了應力應變分析。
  19. Through the test of the separating sieve ' s and beams vibration acceleration, the dynamic bending moment, torque and shearing force as well as the analyze of each parameter by dividing rotation speed range from 300 r / min to 600 r / min of the main shaft, the change regularity of the vibration of the separating sieve, the vibration and the dynamic load on dangerous cross section with the change of rotation speed of the main shaft is obtained. research shows that there exits apparent relevance between the vibration as well as the dynamic load of the main beam and the vibration of the separating sieve. the vibration of the separating sieve mainly affects the composition of low frequency of the vibratio n of the main beam, appropriately amending the vibration acceleration of the separating sieve, the loading and vibration of the mam beam can be directly improved

    通過分檔測試主軸轉速在300 600r min范圍內分離篩與梁的振動加速度、梁所承受的動態彎矩、扭矩和剪力以及各參量的時頻域分析,得到了主軸轉速與分離篩振動、主梁的振動及其危險截面的動態載荷間的變化規律,研究表明梁的振動和其所承受的動載與分離篩的振動之間具有明顯的相關性,分離篩的振動主要影響梁振動的低頻成分,適度改善分離篩的振動加速度,可直接改善梁的負載和振動特性。
  20. Application of nuclear measuring and controlling in main shaft quantitative loading system

    核子計量控制在主井定量裝載系統的應用
分享友人