slope off 中文意思是什麼

slope off 解釋
逃走
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • off : adv 1 〈運動〉向那邊,隔開。 be off 走,去,逃。 I must be off 我得走了。 Where are you off to 你...
  1. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑坡的綜合治理方案是由削方、錨索抗滑樁、護坡擋墻、地表排水、整坡填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑坡的安全儲備系數為1 . 10 。
  2. The slope eases off to - wards the edge of the lake

    斜坡朝著湖岸的方向平緩地向下伸展。
  3. From up to down, food firstly arrives at material output bar, then lays off from taper concave slope, finally, food gets into round basin on baseplate after mutual effect through arcual fillister

    食品從上而下先到達彈性導料條,再到錐形凹坡下料,最後通過弧形凹槽的相互作用,食品到達底盤上圓形食盆。
  4. Kongxi buried hill shows following features in the seismic profiles : the structures are asymmetric. there is flexural syncline on the east side and a monocline on the west side. asymmetric repetition of stratigraphic units is present in the drill wells and the dips of beds and faults are gentle. the permo - carboniferous system of both sides almost lie in the same slope and the events of cambrian or upper proterozoic are continuous from east to west. the phenomenas suggest that kongxi buried hill could be a thrust belt been traced which consists of reverse faults. the imbricate faults mainly effect pre - jurassic strata. there are obvious angular unconformity between jurassic - cretaceous system and paleozoic involved deformation of thrust. the thrust front in some place has cut off the beds of jurassic - cretaceous system. the structural style of the thrust structure changes along the strike of the kongxi buried hill

    地震和鉆井資料揭露的孔西構造帶前第三系潛山的地質特徵可以歸納為:構造帶總體上不對稱構造帶內部有地層重復現象石炭二疊系地層的位置明顯高於兩側的同一地層的高度。用由34條向東傾斜的逆沖斷層組成的疊瓦扇構造模式能夠比較合理地解釋上述地質特徵。該帶向東傾斜的逆沖疊瓦狀斷層組主要影響前侏羅系地層,侏羅白堊系與捲入逆沖構造變形的古生界地層之間有明顯的角度不整合。
  5. The car skidded off the road and rolled over and over down the slope.

    汽車滑出路面,打著滾翻下坡去。
  6. The car skidded off the road and rolled over and over down the slope

    汽車滑出路面,打著滾翻下坡去
  7. The quantification indexes that token weathered degree are primary velocity, borehole rqd ( rock quality designation ), joint space, joint number and so on, and the unloading ones are primary velocity, joint opening, borehole penetrability and so on. the compartmentalization of different weathered and load - off zones according to quantification indexes tallies with the slope geo - stress computed by finite element method

    其中研究風化分帶的定量指標有縱波速vp 、鉆孔rqd 、結構面間距與條數等,研究卸荷分帶的定量指標有縱波速度、節理開度與鉆孔巖體透水性,據此劃分的不同程度風化、卸荷巖體與有限元計算的壩區河谷應力場具有良好對應性。
  8. The main work this paper do are these like below : ( 1 ) this paper reviewed and summarized the development and actuality of bank in china, induced the variety of bank ' s disease and the measure of judge etc. ( 2 ) introduced and studied fast lagrangian analysis of continua. flac3d is a three - dimensional explicit finite - difference program. uing this program, obtained the three - dimensional settlements of huxi bank and analyzed the tention area and the cut - off area. the result shows that there are a lot of andscape orientation cracks and portrait cracks in the bank. these cracks bring some disadvantage influence to slope stabilization and seepage of bank

    主要內容如下: ( 1 )回顧總結我國堤防發展的基本狀況及運行現狀,對堤防病害的種類及評判方法進行歸納。 ( 2 )對三維快速拉格郎日有限差分法進行了深入研究,並運用此理論對地下采動的結構和過程進行了數值模擬,對湖西大堤姚橋礦段由於地下採煤而引起的不均勻沉降進行了計算,得出堤體及其周圍地基的三維位移場,分析了由於不均勻沉降而產生的拉應力區和剪切破壞區域。
  9. In this paper the composition of the maintain management for the large - scale hoisting system has been studied. as far as the slope cable car of ximing coal mine for hoisting people is concerned we have decided its function, capability standard and fault mode. furthermore we have analyzed the criticality of all kinds of fault modes and have realized the off - line monitor

    本文研究了提升設備計算機維修管理系統的組成,以山西省西山煤電集團西銘礦斜井纜車為工程背景,確定了設備功能及其相關的性能標準,確定各功能故障及故障模式,並對各故障模式進行了危害度分析。
  10. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊坡為覆蓋層邊坡,坡體下部有較為完整堅硬的巖石,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊坡穩定性,或將滑坡體上部不利於穩定的荷載挖除,對于陡坡的坡面可以將坡削緩,則效果會更好。
  11. The outcomes show that cultivation measures have the reduction functions of run - off energy and slope sediment production, of which, the action of contour cropping is the maximum and the action is reduced along with the increase of rainfall intensity and surface gradient ; cultivation measures also have a certain correlation on the reduction functions of run - off energy and erosion, in the meanwhile of slope sediment production, it is effected by the factors of soil erosion resistance and scouring resistance

    結果表明:耕作措施對徑流能量及坡面產沙均具有削減作用,其中等高耕作的作用最大,隨雨強和地面坡度的增大其作用減弱;耕作措施對徑流能量的削減作用與減蝕作用之間具有一定的相關關系,但坡面產沙同時受土壤抗蝕、抗沖性等因素的影響。
分享友人