soil preparation 中文意思是什麼

soil preparation 解釋
播前耕作
  • soil : n 1 泥土,土壤;土質。2 土地,國土。3 滋生地,溫床。4 農業生活,務農。n 1 臟東西,污物,污穢,污...
  • preparation : n 1 準備,預備;〈常 pl 〉準備工作[措施];預修,預習 (for) 預習時間;(對…的)準備。2 (藥、菜...
  1. In abandon farmland afforestation, can use soil preparation of channel of hold up fosse, level, dig the measure such as segregation belt

    在棄耕地造林,可採用撩壕、水平溝整地、挖隔離帶等措施。
  2. Through the analyses of characteristics of gully thalweg and soil erosion in upland and gully land, sediment sources in small watershed, sediment yield relationship between upland and gully and ecological functions of vegetation corridor, it is considered that vegetation corridor combined with land preparation measures may block runoff and sediment from upland and reduce the amount of soil erosion in a watershed by 54. 5 % ~ 77. 0 %

    摘要在分析黃土高原地區的溝沿線、溝沿線上下溝間地和溝谷地土壤侵蝕特徵、小流域泥沙來源、坡溝侵蝕產沙關系的基礎上,結合廊道的生態功能和以往的研究結果,認為在溝沿線的上部建立草灌與整地工程措施相結合的植物廊道,來攔蓄阻截溝間地的來水來沙,可使流域的土壤侵蝕量減少54 . 5 % ~ 77 . 0 % 。
  3. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調查資料,探討了造林爆破整地工程的坡地穩定性與降水、地形等因子的相互關系,應用數量化理論,對在有充分降水條件下的低山丘陵區的爆破整地工程損失程度與地形因子之間的關系進行了系統分析,並建立了相應的數學模型,研究指出,充分的前期降水和日最大降雨量是引起爆破整地工程損失的激發因素;影響爆破整地工程穩定性的主要地形因子是地面坡度,其次為坡位、坡向,實施爆破整地工程的地面坡度以不超過25為宜。
  4. Soil preparation and field management

    整地及田間管理系統
  5. During wheat and barley bred in winter in sanya, some technological characteristics concerned must be wielded according to the ecological conditions there. 1 ) carefully select materials and avoid planting the materials that can not head in sanya. 2 ) cultivated measure : spread lime before ploughing ; and make furrows during soil preparation. spread funandan in sowing furrows. after every irrigation and heavy rains, surplus water must be drained off immediately and soil must be intertilled in time. it is also a key measure in breeding in winter to prevent and eliminate the plant disease, pest and mice during plant growing period. 3 ) the flowering period of parent for hybridization must be adjusted. 4 ) the criterion for each trait selection to breeding materials should be soften to different degrees

    在三亞冬繁麥類時,應根據當地生態條件掌握好有關技術特點:慎重挑選冬繁材料,盡量避免攜帶可能在三亞不抽穗的材料;栽培措施應注意耕翻前撒施石灰,整地需開廂起壠,播種溝先撒呋喃丹,灌水及大雨後要排除余水,及時鬆土,生育期間注意防治病蟲鼠害;雜交親本應注意調節花期;對育種材料各性狀的選擇標準都要不同程度地放寬。
  6. Standard practice for preparation of soil samples by hotplate digestion for subsequent lead analysis

    用熱板溶解法連續分析鉛含量用土壤樣品制備的標準實施規程
  7. Afforestation and scientific soil preparation technology in grain to green program

    植樹造林與退耕還林效益型科學整地技術
  8. Field sampling and preparation of forest soil samples

    森林土壤樣品的採集與制備
  9. Main problems of soil in the low yield orchards and the water conservation amp; fertilizer preparation measures

    我省低產果園土壤主要問題及保水培肥措施
  10. Meanwhile it summarized the main points of kidney bean high - yield cultivation techniques, including selecting and preparation soil, selecting seeds and sowing, fertilizing, field management and disease and insect pest controlling

    通過採用選地整地,選種與播種,施肥與田間管理,病蟲害防治等技術措施,概括了蕓豆高產栽培技術要點,為發展蕓豆生產提供參考依據。
  11. The actual reproduction and artificial restoration density were the biggest with the treatment of irrigation ? soil preparation + natural regeneration, and the average numerical value was 13. 04 clumpes / m ^ 2 ranging from 3 clumpes / m ^ 2 to 28 clumpes / m ^ 2. the others were as follows : 1. 66 clumpes / m ^ 2 occurred in the treatment of unirrigation + soil preparation + artificial regeneration, ranging from 1 clumpe / m ^ 2 to 20 clumpes / m ^ 2 1. 11 clumpes / m ^ 2 occurred in the treatment of unirrigation + soil preparation + natural regeneration, ranging from 0. 5 clumpe / m ^ 2 to 17 clumpes / m ^ 2 0. 25 5 clumpe / m ^ 2 occurred in the treatment of unirrigation + break ground + natural regeneration, ranging from 0. 1 clumpe / m ^ 2 to 3. 0 clumpes / m ^ 2, and 0. 012 clumpe / m ^ 2 occurred in the treatment without disturbance

    以更新密度作為參數,其數值依次為:灌溉+整地十自然更新最大,平均為13 . 04叢/平方公尺,變化在3 28叢平方公尺之間;無灌溉+整地十人工種植恢復平均為1 . 66叢平方公尺,變化在1 20叢平方公尺之間;無灌溉十整地+自然更新恢復平均為1 . 11叢平方公尺,變化在0 . 5 17叢平方公尺之間;無灌溉+破土+自然更新平均為0 . 255叢平方公尺,變化在0 . 1 3 . 0叢平方公尺之間;無干擾自然更新平均為0 . 012叢平方公尺。
  12. According to climate condition, soil condition and afforesting tree species and water requirement rule of forest and grass, the paper analysed and calculated the slope length for collecting stream of three site preparation methods which were reverse - slope terrace, level trench and scale - hole, and the slope length for collecting stream of deferent gradients and planting bandwidths were acquired

    摘要根據寧南山區的氣候、土壤、造林樹種等,按照林草植被建設的水分需求規律,對不同水上流失區的反坡梯田、水平溝、魚鱗坑3種整地方式的集流坡面長度進行分析與推算,計算出了不同坡度、植樹帶寬度下的集流坡長。
  13. Serious soil preparation wants before afforestation, keep clear of and reduce rat kind concealment place and food source

    造林前要認真整地,清除和減少鼠類隱蔽場所及食物來源。
  14. This paper introduces a new construction method of lowering ground water level suitable for sandy soil area regarding preparation of construction equipment and materials, construction procedure, attentive matters for construction and so on

    文章從施工設備及材料的準備、施工步驟、施工注意事項等方面介紹了一種適用於砂土地區降水的新方法。
  15. Sludge. organic soil conditioners. growth media. preparation of partially dry test samples. expression of results

    污泥.有機土壤改良劑.生長培養基.試驗用部分干試驗樣品的制備.試驗結果的表述
  16. A farm implement consisting of a heavy blade at the end of a beam, usually hitched to a draft team or motor vehicle and used for breaking up soil and cutting furrows in preparation for sowing

    犁一種農具,由在一根橫梁端部的厚重的刃構成,通常系在一組牽引它的牲畜或機動車上,用來破碎土塊並耕出槽溝從而為播種做好準備
  17. Delving into preparation of water and soil conservation scheme for high grade roads

    高等級公路水土保持方案編制探討
  18. Preparation for construction : the surface of the under layer should be even and firm, and in accordance with the design requirement, without loose material and flaccid site, and need to reroll 2 3 times within full - width range of the subgrade with vibrating roller before the construction, as well as test the compaction and defecting, to check whether there is unqualified point in the soil base

    施工準備:施工前下承層表面要平整、堅實,符合設計要求,無鬆散材料和軟弱地點,施工前要用振動壓路機在路基全寬范圍內復壓2 3遍,同時進行壓實度及彎沉檢驗,檢查土基中是否有不合格點。
  19. Standard practice for laboratory preparation of soil - lime mixtures using a mechanical mixer

    用機械攪拌器在實驗室中制備土壤-石灰石混合物的標準實施規程
  20. Application of the soil preparation technology of converging the runoff flow into afforestation

    淺談匯集徑流整地技術在造林中的運用
分享友人