  1. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  2. Ncaps is a novel satellite navigation system presented by scientists of cas recently, which is based on the prin ciple that the land control station transmits the navigation signals via communication satellites, other than special navigation satellites, to the ncaps receivers, in which the received signals are processed to obtain its detailed positioning information

    空基導航系統代表有美國的gps和俄國的glonass衛星導航系統。 ncaps系統是我國科學家最近提出的一種新的衛星導航系統。其主要原理是:地面控制站利用通信衛星(而不是專用的導航衛星)轉發導航電文給接收機,接收機利用導航電文解算出本地位置。
  3. In this paper, referring to qingju water power station, temperature control analysis and study has been done : study on the match ratio of the concrete and question of modifying of the special fine sand concrete to improve resisting ability of splitting of concrete ; study on the technology of the highly mixed fly ash to reduce the adiabatic temperature rise of concrete ; in case of the condition of resisting splitting to allow, study on the temperature control measure to strengthen and water the size of building, simplify the operational procedure, accelerate the construction speed, economize the expenses of the project

    溫控問題成為青居水電站設計和施工的關鍵技術問題。 、本文對水工大體積混凝土溫控問題進行了分析和總結,結合青居水電站閘壩工程,開展溫度應力及溫度控制研究:研究混凝土的配合比及特細砂混凝土『改性問題,提高混凝土的抗裂能力;研究高摻粉煤灰技術,降低混凝土的絕熱溫升:在抗裂條件允許的情況下,研究施工過程中溫控措施的簡化,以加大澆築尺寸,簡化施工程序,加快施工進度,節約工程費用。
  4. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水電站特殊的自然條件和工程布置特點,其施工導流經過對多個方案進行比較,從施工布置、後期度汛、施工期通航、發電工期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流方案。
  5. Based on the experience and lesson of the hydropower project management under the planned economy system, the managers of ertan hydropower station tried to find out a new hydropower project management mode, which includes several main points as follows : ( 1 ) : undertake the project management based on the enterprise legal person, and unify the project construction with the goal of sustainable business running. ( 2 ) : carry out the tender system to choose the contractors and manufacturers by fair competition to guarantee the quality and schedule of the project and reduce the cost. ( 3 ) : introduce fidic contract conditions, implement project supervision, set up dispute review board, and invite special advisory group, etc. ( 4 ) : strengthen contract management in order to control the quality, schedule and cost of the project

    二灘水電項目是在國家實施改革、開放政策中進行建設的,總結計劃經濟下水電項目管理的經驗和教訓,二灘水電項目管理者在探索新的水電項目管理模式,主要是實施以企業法人為主體的水電項目管理,把項目建設和企業持續經營的目標統一起來;實行招投標制,在市場競爭中選擇工程承包商和設備製造商,保障工程質量、工期和降低工程造價;引進菲迪克合同條件、實施工程監理、設立爭議評審團、聘請特別咨詢團等,強化合同管理,實行對工程質量、工期和工程造價三大控制;做好資金管理工作,保障項目建設對資金的需要,降低資金成本等。
  6. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪水電站水文氣象條件、施工特點,以及上下游圍堰和右沖壩段碾壓混凝土溫度控制標準,介紹景洪水電站縱向圍堰高溫季節碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。