state constraint 中文意思是什麼

state constraint 解釋
狀態受限
  • state : n 1 〈常作 S 〉國,國家;〈通例作 S 〉(美國、澳洲的)州;〈the States〉 美國。2 國務,政權,政府...
  • constraint : n. 1. 強迫,拘束。2. 約束,壓抑,拘泥。3. 強制力。4. 緊張感[狀態]。
  1. Under the fractal application, the transitional state rendering method based on t - fbm constraint model is proposed. in this model, the transitional deformation energy is defined as the bi - association between the initial state and the transitional fractal detail, and the fbm constraint is realized by the threshold statistical estimation. furthermore, the regional buffering control and regional harmonic control can offer more abundant and flexible control ways for the rendering of fractal transitional state

    針對過渡狀態可視化的分形應用,提出了基於t一fbm約束的繪制方法,將過渡變形能作為與初始形狀和過渡分形細節之間的雙向關聯,以閉值估計一作為fbm約束因子的具體實現,以區域緩沖與區域調和作為不同約束下的控制手段,很好地在繪制結果中反映出分形性過渡特性的分佈情況。
  2. It not only constraint the development of state economy, but also increase polarize very probably, result in labile factor and serious potential problem for social security

    解決的不好,它不但會制約社會經濟的發展,而且很有可能加大兩極分化,造成不穩定因素,為社會安全帶來巨大隱患。
  3. A full mathematical model of optimal flow pattern design withengineering constraints was put forward, based on modern optimal control theory. an optimal flow pattern design was presented for optimizing meridional channel of axial flow turbine. according to integral optimization of turbine stages, a full physical model and mathematical expression were put forward for proposition of optimal flow pattern, including all performance parameters in turbine stages. this problem was further recast into a typical form control to maximize specific performance index such as work or efficiency of stage with given initial state, fixed terminal condition and constraints for part of state terminal variables. the program was also worked out according penalty function method and conjugate gradient method. the optimal distribution of c1ur1 ( r1 ) was obtained according to constraint conditions and maximized objective function

    把近代最優控制論方法引入軸流透平葉片的設計,在優化的軸流透平子午通道內,建立包括透平級內所有性能參量的最優流型命題的完整的物理模型及其數學表達式,並歸化為一個在給定初始狀態、自變量終端固定、部分狀態變量終端受有約束的條件下,使級的某一性能指標(如級的功率)達到最優的最優控制問題,應用「代價函數法」及「共軛梯度法」編制計算程序,計算得到符合給定約束條件、並使目標函數取極值的最優環量分佈,結果是令人滿意的。
  4. The financing behavior of state - owned enterprises under the soft budgetary constraint and corresponding policy analysis , usa - china business review, vol. 2 no. 6, 2002

    《個體私營經濟的搖籃?漢正街市場形成與發展的經濟學分析》 ,載于《中國私營企業發展報告》 ,社會科學文獻出版社1999年12月版,等等。
  5. For the methods based on constraint residual, they can be used to only tell which node is imbalance but cannot identify where the gross error is. in order to avoid these problems, this thesis proposed a new test method. the new method combines an f - statistic with constraint residual statistic to detect gross errors in steady state processes

    這種方法即避免了基於測量殘差的檢測方法會將顯著誤差分散到各個測量值中去的缺陷;又避免了基於約束殘差的檢測方法只能對節點的平衡性進行判斷,而無法確定顯著誤差的具體發生位置的缺陷。
  6. The innovative ideas in this paper are that robust h control theory based on conventional ip controller is applied to the high - precision feed of a single axis, and the controlled plant is composed of ip velocity loop and two - order model of linear motor. a constraint condition on y in the problem of h2 / h is deduced from the frequency criterion of riccati equation, which makes the repeated computation on r simple. considering the two - loops control problem, the h state feedback controller based on ip controller as the inner controller is applied to satisfy the velocity performance of the system, and a pi controller, the external controller, is used to satisfy the position performance

    本文的創新之處在於將傳統的ip速度控制器和直線電動機的二階模型作為一個廣義的被控對象,利用魯棒h _控制理論設計了一個h _狀態反饋控制器,以此解決高精度進給的控制問題,並在此基礎上研究了h _ 2 h _混合控制問題,結合h _代數riccati方程正定鎮定解存在的頻率判據,推出了一個控制器存在的約束條件,使以往須反復試探的,有了更進一步的約束范圍,簡化了計算。
  7. For this reason, the thesis presents an approach based on constraint satisfaction, symbolic execution and extended finite state machines. it can analyze programs written in a subset of the c programming language

    針對上述情況,本文中提出了一種方法,它基於約束滿足問題求解方法和擴展有限狀態機上的符號執行演算法,能夠對c語言子集描述的程序進行分析。
  8. I regard qsim as a kind of constraint satisfaction problem ( csp ), and improve the qualitative simulation algorithm by constraint logic programming ( clp ). fuzzy qualitative simulation develops conventional qsim on several facets, such as representation of qualitative value, state transition rule and filtering algorithms. it bridges the gap between pure qualitative and quantitative, and improve the efficien

    前者是將定性模擬演算法看作一類約束滿足問題,用約束邏輯程序加以改進,不僅為解決定性模擬問題提供了邏輯框架,而且也是一種規范化的程序描述語言;模糊定性模擬演算法則是對純定性模擬演算法在知識描述、狀態轉移規則、過濾演算法等方面的改進,是一類半定量描述方法,有利於在定性模擬領域綜合定量信息,同時提高演算法的效率。
  9. The soft budge constraint and bad loan mechanism among state - owned commercial banks

    預算軟約束與國有商業銀行不良貸款形成的機制
  10. The state as soe ' s principal makes an influence on the problem of incentive and constraint, which include not only the principal problem, but also the agent problem. the main effect is that : on the one hand, probably take the multiple goals into the firm ; on the other hand, do no good to prevent their collusion when the state entrusts the supervisor to supervise the manager

    國家作為企業的委託人,使得對經營者激勵和約束問題中既包括代理人方面的問題,又包括代理人方面的問題,其所造成的主要影響是:一方面可能把國家的多重目標帶入企業;另一方面在委託監督人對經營者進行監督時不利於防止他們之間合謀行為。
  11. Then the system can use automatic constraint violation stabilization method for differential / algebraic equations to get state, displacement, velocity, acceleration of multibody system in different time points under external force

    該系統採用絕對坐標方法自動建立多體系統動力學方程,其形式為微分代數混合方程,即euler - lagrange方程。利用約束違約自動穩定方法求得多體系統在外力的作用下姿態、位移、速度、加速度。
  12. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜拉橋結構設計理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索力調整為核心內容的斜拉橋施工控制理論,簡稱為最佳成橋狀態法;以斜拉橋主梁標高誤差最小為目標函數,以主梁內力(彎矩)為約束條件,以索力為優化變量,建立了最佳施工階段的索力調整計算模型;推導了考慮徐變收縮效應的索力調整計算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程計算研究,得到的成橋狀態與設計目標相當接近,優于該橋以「雙控」為控制目標的實測結果,有力地證明了本文方法的正確性及其工程實際價值
  13. Steady state response of the coupled lateral - torsional vibrations of geared rotor system under a holonomic constraint

    完整約束下齒輪嚙合轉子系統的彎扭耦合振動穩態響應
  14. It is an extreme challenge research subject for such network due to the dynamical topology change, bandwidth limitation and power constraint. the state - of - the - art of the manet technology in 5 layer : physical layer, mac layer protocols, routing protocols, transport protocol and application and middle ware issuses are summarized in this thesis. five typical routing protocols dsdv, dsr, tora, aodv and zrp are studied

    本文介紹了移動自組網的起源、特徵和當前的發展狀況,並歸納了其主要的應用領域;分別從物理層、 mac層、路由層、傳輸層、中間件和應用層等5個層次分析和介紹了當前manet採用的技術和協議,尤其對路由協議( dsdv 、 dsr 、 tora 、 aodv和zrp )進行了詳細的研究。
  15. These privateering commissions or “ letters of marquee ” were issued without constraint in wartime, and even in peacetime they were occasionally given to citizens who had suffered losses due to the actions of subjects from an offending state

    簽發這種私掠委任狀或稱許狀在戰時不受限制,在和平時期也會偶爾向那些由於敵國臣民的行為而遭受損失的本國公民開綠燈。
  16. Problems faced by the stated - owned military institute during enterprisational reform, such as system reform, operation mechanism reform, human resource boltleneck, etc., are analysed in emphases. systemreform of the state - owned military institute ia especially anatomized and opinion on system reform by managentment level purchase is also given. converting operation mechanism together with system reform, strengthening constraint and excitation of human resource capital, etc. are analyzed and corresponding solutions are presented as well in thia paper. the first part of this essay in detail and a conclusion lead out, i. e., enterprise - oriented reform for stated - owned military institute are now imperative. main problems might be confronted with by stated - owned military institute during enterprise - oriented reform are analyzed in priority, among which organization system reform of stated - owned military institute are construed emphatically. the author ' s ideas on administrator purchase are also put forward. the whole article is aimed at exploring a practicable reform path for stated - owned military institute under current situation

    本文的重點是對國有軍工科研院所進行企業化改革過程中面臨的主要問題如體制問題、運營機制問題以及人力資源問題進行了分析,其中對國有軍工科研院所進行體制改革進行了重點分析,並對利用管理層收購這種思路來進行體制改革提出了自己的觀點,本文還對國有軍工科研院所在進行通過體制改革的同時轉換經營機制、加大人力資本的約束和激勵機制等方面進行了分析,並提出解決措施,旨在探索一條適應目前形勢和發展需要的國有軍工科研院所企業化改革之路。
  17. The obstacles ifl deriving system of constraints aie how to analyze and reduce the state - ment components and data types of variables on w, and derive system of con8traints as concise as possibie. and the primary obstacle in solving system of constraints is how to process the nonlinear constraint ( s ) among them

    建立約束系統的困難是分析、化簡路徑w上的各種語句成分和各種數據類型,建立盡可能簡潔的約束系統;求解約束系統的主要困難是處理可能存在的非線性約束。
  18. By object - oriented technic, the main matter, constructing, expression, class frame of field common data model ( fcdm ) and constructing technics liking entity definition, attributes, constraint rules. the object state transform rule and object based on conceptual cluster - role mechanism ( ccrm ) are importantly proposed

    作者用面向對象技術給出了領域公共數據模型fcdm ( fieldscommondatamodel )的主要內容、建立與表達、類結構組織和實體定義、屬性、約束規則等構築技術,並重點介紹了對象狀態轉換規則和對象聚類機制及其特點。
  19. At last, based on the above analysis and for the purpose of achieving the optimal or the best state of incentive and constraint mix, the author of this dissertation puts forward the principles in designing the incentive mix and the concrete procedures to follow, helping the listed companies to explore specific models in compensation design

    最後在上述各單項分析的基礎上,為了達到激勵約束組合的最優或最佳狀況,筆者提出了激勵組合設計的原則與具體操作程序,以期為上市公司設計具體的激勵與約束機制提供有益的幫助。
  20. What ' s more, whether a test case is executable is another important problem of software testing. this paper proposes state constraint mechanism to tackle the state explosion problem and combine data flow method and control flow method to tackle the test case executable problem.

    使用狀態圖為系統建模可以在分析設計階段避免狀態空間爆炸問題,但是在集成測試階段卻仍然存在狀態空間爆炸問題,此外,測試用例是否可執行也一直是測試階段面臨的困難之一。
分享友人