station load 中文意思是什麼

station load 解釋
局內負荷
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. The international freight agent in china supplies service by internuncial station during the cargo and the vessel. they ca n ' t give high effective integrative service owing to absencing their own warehouse, load and unload equipment or conveyance

    長期以來,我國的國際貨運代理一直處于船、貨之間,以中間人的身份為顧客提供服務,大部分代理不具有自己的倉庫、裝卸設備和運輸工具等「硬體」設備,很難為顧客提供高效的一體化服務。
  2. In his presentation entitled pumped storage power generation technology and project investment analysis, he gave a birds view on the pumped storage resource in china, development of pumped storage power station, its function in load valiation and the necessity of its construction

    他分析了全國22個省市區的抽水蓄能電站資源,總結了國內抽水蓄能電站的開發現狀,並指出抽水蓄能電站是一種經濟的調峰手段,分析了加快東部廣東和中部抽水蓄能電站建設的必要性。
  3. They replaced broken device, repaired another and carted away a load of rubbish that had been left on the station, showing the shuttle can bring full loads back down from space

    他們對損壞的設備和部件進行了更換和維修,同時徹底清理了遺留在空間站上的垃圾,這一切顯示航天飛機可以滿載而歸了。
  4. Based on the pre - research of reservior - induced seimicity, the text analyzed water ' s load effect, interstitial water pressure and chemicophysical effect on rock in reservior - induced seimicity and discussed hydrogeological mechanism of reservior - induced seimicity. the analysis supplys reliance for the hydrogeological analysis of reservior - induced seimicity. dagangshan power station is located in the intersected segment of daduhe break - zone moxi break - zone and longmenshan break - zone. the construct - actibity seimic activity and hot - water activity is stong from cenozoic ear

    本文在總結水庫誘發地震前人研究成果的基礎上,系統分析了庫水在水庫誘發地震中的荷載效應,空隙水壓力效應和對巖體的物理化學作用,從理論上討論了水庫誘發地震的水文地質機理,為水庫誘發地震的水文地質分析提供依據。
  5. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於洪峰的35場洪水,對沙峰滯後於洪峰的特性進行了剖析,建立了小浪底、花園口、夾河灘、高村、孫口、艾山、利津各河段沙峰滯后時間與上站洪峰流量、沙峰含沙量、洪水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。
  6. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行隧道島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  7. On the point of system, this paper mainly studies the optimal distribution of load in the machines of irrigation and drainage pumping station, the mathematical model and it ' s solution are studied among the machines in pumping station with two types of axial pump : full regulation or semi - regulation. this paper also studies the problems of the optimal day - operation of pumping station and the economical operation of grading pumping station. at the end, jiangdu pumping station is taken as a practical example to show the theory on economical operation of irrigation and drainage pumping station

    本文從系統的觀點出發,以排灌站機組間負荷的優化分配研究為主,分別對全調節和半調節軸流泵兩種泵型的排灌站機組間負荷優化分配的數學模型及其求解方法進行了研究,同時對排灌站最優日運行方式及梯級泵站的經濟運行也進行了初步探索,最後以江都排灌站為例,建立了排灌站經濟運行的實用模型。
  8. With the proposed method, the internal operation of lijiaxia hydropower station is optimized and the optimized load distribution is derived based on three characteristic daily load curves

    運用上述方法,分別以3條特徵日負荷曲線為依據對李家峽水電站的廠內運行進行了優化,並得到其負荷分配方案。
  9. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪抽水蓄能電站基於實時信息系統sis平臺的負荷、水庫調度、電量系統模型的設計、建立、開發和調試工作進行了說明和介紹。
  10. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  11. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步電動機變頻調速技術的發展概況,在回顧電梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液壓電梯變頻節能控制系統研究」的基本原理,分析了動力系統在電梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動力泵站的結構設計和參數設計,重點研究了液壓動力泵站的結構設計、液壓泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失機理的研究及其補償裝置的設計、蓄能器-泵馬達壓力能量轉換裝置的設計、多功能集成控制閥組的設計等內容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件電氣接線、計算機控制及數據採集系統的硬體設計等內容。
  12. It includes : solving " excess attempt " and " defective attempt " of agc by load prediction in extraordinary shot time, that is preceding control technique ; ( 2 ) enhancing the regulating capacity and speed of agc of chongqing network by 5 measure ; analyzing the policymaking that chongqing network could achieve criterion now or after three gorges power station running, discussing the managing measure how to enhance regulating capability of agc of chongqing network

    其中包括:利用超短期負荷預報解決agc 「過調」和「欠調」問題的超前控制技術;以5種實現方式提高重慶電網agc可調量和調節速度;探討了當前和在三峽電站投運后重慶電網達到考核標準的對策,討論了從管理上提高重慶電網agc調節性能的辦法和措施。
  13. One side, groovy cast steel flap valves increase the head loss, waste electricity, the other side, when flap valves close, it always delay time because of it ' s low proportion. the bump load seriously threaten the safety of pumping station. through the research and development of flap valve used in the renovation practices in the design of air - filled floating flap valve in no. 1 chuhe pumping station of anhui province, the working characteristics and design methods of air - filled floating flap valve are studied in this paper

    但在拍門運行使用的同時,又時常暴露出一些缺陷,主要有:一是常規的鑄鐵或鑄鋼拍門加大了流道的水頭損失,特別是對于裝機容量較大的排澇泵站,其電能損耗相當可觀;二是拍門在自重下下落關閉時,往往由於過多考慮水頭損失導致浮重過小而延誤閉門時間,致使水體倒灌,再因緩沖裝置失靈導致閉門時門體對門框撞擊力很大,嚴重危及站身安全。
  14. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏抽水蓄能電站的水泵運行時,不同負荷工況下停機、導葉和轉輪間壓力的變化,闡述了華東桐柏抽水蓄能電站1號機組發電機斷路器開斷的最佳負荷值選定。
  15. In consideration of the special features of the power system of lhasa area, the station uses the surplus electricity to draw water and store energy when its load is at the lowest and discharges water to generate electricity at the peak load

    為維護生態環境,按拉薩電力系統的特點、電站利用負荷低谷時的多餘電量抽水蓄能負荷高峰時放水發電,總體上不改變羊卓雍湖的水量,以力保羊湖水位不下降。
  16. For the sake of the research about hydroelectric interfere among machines, the article utilized the simulink in matlab as simulating tool, meanwhile established the simulating model about two high head diversion water turbines regulation system in violent fluctuating pressure sharing one head race tunnel and surge tank and one penstock. then calculated the load rejection transition process by means of the real parameters of a hydro power station, analysed the interfere of hydro power station safety and stable nenring brought by hydroelectric interfere and put forward a series of measures that lightening the hydroelectric interfere

    為了研究機組間的水力干擾,本文採用matlab下的simulink作為模擬工具,建立共用有壓引水管道、調壓井、壓力主管的兩臺高水頭引水式水輪機調節系統大波動時的模擬模型,引入實際電站的參數,對甩負荷過渡過程進行了模擬計算,分析水力干擾對電站安全、穩定運行所造成的影響,並提出了一系列減輕水力干擾的措施。
  17. Vacuum circuit breaker, drop - out fuse, current limiting fuse, hv fuse, lightning arrester, load switch, power cable distribution box, ring - type net switch station, intelligent power distribution automation system, box transformer substation, hv switchgear cabinet set, lv switchgear cabinet set, isolating switch, hv synthetic rubber insulator, etc. high technology is the source of sunrise development " continuous improvement, keep learning to succeed " is our concept. the group has established a long - tem cooperation with uk birmingham university. electric power research institute of china

    主要生產126kv以下輸變電設備,主要有真空斷路器跌落式熔斷器限流熔斷器高壓熔絲避雷器負荷開關電纜分接箱環網開關站智能配電自動化系統箱式變電站高壓成套開關櫃低壓成套開關櫃隔離開關高壓合成膠絕緣子等14大系列800多種規格。
  18. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽水蓄能電站地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界節點的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  19. There are many plants that have the character of time - varying, large delay, large inertia in the process of production of modern power station such as the superheated steam temperature, the reheated steam temperature, the water treatment of boiler and the load regulation. some of them have the strong character of nonlinear and some of them are multivariable coupling systems it is very difficult to obtain good effect of control by conventional pid control. it is necessary to set up the mathematics models of controlled plants if applying control means of modern control theory such as self - adaptive control, optimal control , decoupling control and predictive control. and these control systems have large calculation and bad character of real time in general. these disadvantages make them be not able to meet the need of real production process and limit the application of them in modern power station. now the generator units are developing towards large capacity and high parameters. many new kinds of generating electricity means are coming into being. the characers of production units of power station become more and more complex but the demand to quality of control becomes more and more strict. the new control means are in bad need to control them effectively

    現代電站的生產過程中存在過熱汽溫、再熱汽溫、鍋爐水處理、負荷調節等許多大遲延、大滯后、特性時變的對象,它們中有些還是具有強非線性特性的對象或多變量耦合系統,採用常規的pid控制手段很難取得良好的控制效果。若應用現代控制理論中的自適應控制、最優控制、解耦控制、預測控制等控制手段,則需要建立被控對象的數學模型,而且往往控制系統的計算量大、實時性差。這些缺點使其很難滿足實際生產過程的需要從而極大地限制了其在現代電站中的應用。
  20. ( gather at longyang subway station load bikes …

    龍陽路地鐵站外集合以集裝自行車等。 。
分享友人