  1. In single pylon cable stayed bridges, and cable stayed bridges without backstays, when the bottom of the tower bears the moment from the dead load, it is concluded that non - symmetric configuration of pile cluster corresponding to the upper structure is more practical than symmetric configuration of pile cluster

    當獨塔斜拉橋、無背索斜拉橋等橋梁塔底永久作用有彎矩時,與完全對稱的基礎形式相比較,和上部結構相協調的不對稱基礎形式更加適用。
  2. Analysis of the response to earthquake of the pile - soil - single tower cable stayed bridge interaction

    獨塔斜拉橋相互作用地震響應分析
  3. In this paper, the construction techniques of linjiangmen cable - stayed bridge in jilin, such as large sinking well technique of pier, climbing form panel technique of main tower, stay rope formwork traveler technique of girder and construction control, are summarized in details

    本文全面總結了吉林臨江門斜拉橋施工技術,詳細敘述了主墩大型沉井施工技術,主塔爬模施工技術,主梁牽索式掛籃施工新技術。斜拉索施工及施工控制等。
  4. In this thesis, the construction and monitoring general method of cable replacement work for qianwei minjiang river cable - stayed bridge is introduced firstly, then, using large - scale commercial finite elements analysis software, algor, a space solid model is developed. in order to give attention to internal force and deformation, the thesis simulates the factual situation of the bridge by adding boundary elements. the analyzed items include : cable forces, deflections, stress of box - girder and maximum horizontal deformation of tower under different cable - replacement cases, which can be used to tutor design and construction for other similar works

    本文以犍為岷江大橋換索工程為背景,首先介紹了該橋換索施工與監控工作的大致情況,並應用大型商業有限元軟體algor建立了該橋空間計算模型,建模過程中為了真實地模擬結構換索前的內力狀態,實現內力與線形兼顧,本文使用了「添加邊界元還原結構內力」的方法。
  5. The main contents include inherent vibration feature, stability characters, effect of geometry non - linearity and the tower obliquity, impact of system different temperature and local different temperature etc. the result in the article will provide the design references for the project of no back - stays & inclined pylon cable - stayed bridge

    本文的主要工作有:介紹無背索斜塔斜拉橋的自振特性,全橋模型在荷載下的穩定性特徵,結構幾何非線性的影響,斜塔傾角對結構的影響,體系溫差和局部溫差對結構的影響等。
  6. Vibration control of steel tower of large span cable - stayed bridge under construction

    大跨度斜拉橋鋼塔施工階段振動控制
  7. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工方法、協作剛構的剛度選取、塔柱的直束加固等方面作了詳細地計算分析和比較。
  8. Binzhou yellow river bridge is a three - tower cable - stayed bridge with prestressed concrete girders

    摘要濱州黃河大橋主橋是三塔預應力混凝土斜拉橋,主梁為預應力混凝土箱梁。
  9. Therefore, it might be very essential to study the cable stayed bridge of the super breadth composite beam. additionally, the main problems of the study are as follows : 5 、 the distributing for stress of lengthways and transverse in transect ; 6 、 discussing the change of stress of lengthways and transverse, while the breadth of bridge is changing ; 7 、 in the cable stayed bridge of the super breadth composite beam, the lengthways reinforce rib and rigidity crossbeam exert influence on stress of bridge board ; 8 、 while tower and beam are concretion, main tower affects bridge board

    鑒于目前關於此類橋型研究成果不多,就此作了下列若干問題的研究: 1 、超寬疊合梁斜拉橋橫斷面上縱向應力分佈和橫向應力分佈特點的研究; 2 、對超寬疊合梁斜拉橋隨著橋寬變化時,上述兩種應力分佈變化規律進行探討; 3 、在超寬疊合梁斜拉橋中,縱向加勁肋對橋面板受力的影響;橫梁尤其是剛性橫梁在橋面板受力中所起的作用; 4 、塔梁固結時,主塔對橋面板的作用。
  10. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔錨固區節段最不利斷面在環向預應力與索力共同作用下塔壁的應力響應進行了研究。
  11. With the appearance of high strength concrete high tensile steel wire and cable, the cable - stayed bridge is more and more widely used and popular. it unites three diversely bearing structure style, compression tower tension cable and bending press beam, into one bridge style

    斜拉橋是隨著高強度混凝土材料、高強鋼絲和拉索的出現才得到廣泛推廣應用的橋型,它把主塔受壓、拉索受拉及主梁受壓彎的三種不同受力的構件有機地組合在一個統一體中。
  12. The golden horse bridge with t - shape rigid structure and single - tower cable - stayed bridge is taken as an example for the solution of vertical vibration differential equation through the presented boundary condition

    求解出的豎向振動方程的解析解,與有限元數值結果對比吻合良好,證明了方法的正確性。
  13. In order to construct the bridges successfully, an exact analysis must be carried out in every construction step. yongan bridge is a cable - stayed bridge of tri - tower with single cable plane. integral cast - in - place construction on form board method is used in construction

    因此,有必要對該橋的整個施工過程進行詳細的研究,合理安排橫梁預應力筋和斜拉索的張拉步驟及張拉量,以指導該橋施工。
  14. The differences of mechanical behaviors between multispan cable - stayed bridges and the custom two - tower type were given in the comparison

    比較了多塔斜拉橋與普通兩塔斜拉橋的力學行為差異。
  15. The cable - stayed bridge of the hong kong section has a main span of 210m with a single inclined tower 158m in height. viaducts carry the approach roads to the bridges with piers at a typical spacing of 75m

    香港側的斜拉橋主跨長度為210米,單柱式後仰索塔高158米,高架引橋跨距一般為75米。