step-out time 中文意思是什麼

step-out time 解釋
到達時差
  • step : vi ( pp )1 走;跨步。2 踩,踏上 (on)。3 跳舞,輕快地走,合著步調走。4 跨入,踏進。5 走上。vt ...
  • out : adv 1 〈位置及運動的方向〉向外,向外部;在外,在外部;出去,出外,離開;離岸,向海面;(船等)開...
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  1. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節流調速系統的回油路上串接調速閥時,隨階躍負載的增加,在相同流量閥開度、相同溢流閥調節壓力的情況下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是增加的,上升時間、峰值時間以及調整時間也是增加的;液壓缸無桿腔壓力p _ 1 ( t )的超調量是增加的。
  2. The soldiers stepped out in time to the song, swinging their arms and unconsciously falling into step

    士兵們合著歌曲的拍節,揮動著手臂,邁開大步,不知不覺地走了腳步。
  3. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程梯級提水灌溉工程的投資控制,在設計階段應逐步推行限額設計的作法;施工階段以優化施工方案,審簽施工圖紙,嚴格計量支付為重點,防止投資失控,同時要謹慎對待工程變更,正確處理索賠事宜。
  4. At the mean time, the old school office which is damage by the blaze ten years ago has show up again and the ghost of the dean of the school is stepping out from nowhere, closer and closer. step by step.

    阿狄阿絲阿cat離奇失蹤死亡,令高強和逸敏陷於崩潰邊緣,決定挑戰嚴禁談戀愛這條違反天理的校規。此時,因火災而消失了的校務處又再次出現,訓導主任的冤魂靜靜地步出,一步一步的逼近
  5. They had now entered a beautiful walk by the side of the water, and every step was bringing forward a nobler fall of ground, or a finer reach of the woods to which they were approaching ; but it was some time before elizabeth was sensible of any of it ; and, though she answered mechanically to the repeated appeals of her uncle and aunt, and seemed to direct her eyes to such objects as they pointed out, she distinguished no part of the scene

    他們現在已經走到河邊一條美麗的小徑上,地面逐漸低下去,眼前的風光便越發顯得壯麗,樹林的景色也越發顯得幽雅,他們慢慢地向前走,舅父母沿途一再招呼伊麗莎白欣賞如此這般的景色,伊麗莎白雖然也隨口答應,把眼睛朝著他們指定的方向張望一下,可是她好久都辨別不出一景一物,簡直無心去看。
  6. Then the paper uses the same typical four network operating conditions as the primary given conditions and when adding one set of the parallel capacitor bank, changing the 330 / 220kv transformer tap changer position step by step to change the transformer ration, through this study methods this paper found out all the optimized combination of the tap changer position and the amount of input reactive power, also obtained four sets of the 330kv, 220kv and hokv s / s bus voltage and the active and reactive power losses changing curves. through analyzing the optimized combination control curve and the network power flow, the paper generalizes the rules as following : the chief measure of coordinative control is inputting shunt reactor in chengxian s / s in winter time both in the planning year of 2010 & 2005 ; in summer time in planning year of 2010 the chief measure is to input proper shunt capacitor

    本研究通過分析所獲得的最優綜合控制組合曲線及電網潮流,總結出了如下規則:隴南電網在2005年及2010年冬大、以及2005年夏小運行方式下,綜合控制應以成縣變投入適量並聯補償電抗器作為主要措施;在2010年夏小運行方式下則投入適量並聯補償電容器作為主要措施,再輔助以選擇合適的主變有載調壓分接頭來調節,達到控制網內無功潮流分佈合理、各變電站母線電壓在理想的范圍內時電網有功損耗最小,從而也提高了電網安全運行水平及供電質量。
  7. Based on this, the traditional model of time series analysis and gray system theory that is developed recently are established to forecast. and an exploring is carried out applying the function of step that the 3d - flac software offered. this will provide material of dynamic and timely landslide forecast for engineering practice and scientific research

    在此基礎上,本文運用傳統的時間序列分析方法和近年來發展起來的灰色系統理論建立了預測模型;並利用3d - flac軟體提供的時步( step )功能在研究庫岸滑坡的動態預報上做了探索。
  8. Based on the first step, modeling and solving methods as the secondly step was use to com out the final result. second, in the problem of irs observing area target, the two intentions of maximal observing time and maximal observed area are conflicting

    在實際中,不同的情況下,對空間覆蓋率與時間覆蓋率的需求也各不相同:比如說封鎖搜索問題就要求優先滿足時間覆蓋率,而對未知區域的觀測問題則需要首先滿足空間覆蓋率。
  9. If , however , you move the whole body to a time zone which is four hours different , the two clocks will be out of step , like two alarm clocks which are normally set together , but which have been reset a few hours apart. whereas the two clocks would normally sound their alarms together , now they ring at different times. ( 10 ) similarly , the body can be set for evening while the sun is rising

    此句意思:另一個定時系統在我們的體內時鐘內(其中一個主要時鐘可能位於我們大腦的稱為超交叉核的那部分中)這些體內時鐘在不受干擾時,會使人體有一個25小時? ?是的, 25小時? ?的生理節奏。
  10. In part one, the general of reclamation of arable land for reforestation : basing on resulting lots of data, author referred to many measures taken by america and china in the reclamation of arable land for reforestation and took the comparison, which concluded the following : china does not take the ways that the developed countries firstly destroyed before protection ; carrying out the reclamation of arable land for reforestation step and step is the important step which improves the reasonlesss utilization of land ; because of the weak economic base in the reclamation of arable land for reforestation of china and the low rate of labor, we should enlarge the content of science and technology, improve per yield of the remaining cultivated land and solve the self - sufficiency of grain, meanwhile the government should strengthen the transfer of remaining labor, adjust the industrial construction and lead the construction of small cities and towns ; the implement of reclamation of arable land for reforestation does not leave the support of the government ; we should carry out the reclamation of arable land for reforestation according to law ; the reclamation of arable land for reforestation does not be seen the effort in the short time, we should insist in a long time. which can have the result

    本論文共分八個部分:第一部分退耕還林概況:筆者在查閱大量資料的基礎上,參閱美國與中國的退耕還林過程中所採取的各項措施並進行比較,得出了以下結論:中國不能重走發達國家先破壞后保護的道路;有計劃、有步驟地實施退耕還林是改善不合理土地利用現象的有力舉措;中國退耕還林經濟基礎較為薄弱,農業勞動生產率低,退耕還林后,必須加大科技含量,提高剩餘耕地的單產,解決糧食自給問題,同時,政府應加強剩餘勞動力轉移,產業結構調整及小城鎮建設的引導;退耕還林的實施仍離不開政府的扶持;依法退耕還林;退耕還林不是在短期內能見到效果的,長期堅持必有成效。該部分最後論述了目前國內退耕還林工程政策、管理方面的現狀及其存在哪些問題尚待改進或繼續深入研究,並需要進一步完善。第二部分退耕還林背景分析:針對我國目前生態環境建設中的退耕還林工程,就其產生的根源從社會經濟背景、生態環境背景及西部大開發三個角度進行了全面、系統的分析。
  11. Turn your body to the right. thrust your right fist up and forward in front of your chest, knuckles turned down, lower your left hand to the side of your left hip, with the palm turned downward and the fingers pointing forward. at the same time, draw back your right foot and, without stopping or allowing it touch floor, take a step to 10 oclock with the toes turned out

    十字手:重心后移,身體右轉,左腳內扣,右腳以腳跟為軸,腳尖外撇,重心向前,右手向前下方劃弧,上體稍向前傾,重心移到兩腿之間,兩手在胸前交叉,掌心向上,同時右腳尖稍內扣,重心移至左腿,右腳輕輕提起,收至與肩同寬,兩腿遂漸伸直,翻掌下落,兩掌分開,掌心向下翻轉,緩緩落於體側。
  12. Lyapunov exponent depict the discrete extent of chaotic dynamic system. there propose an estimation of one step prediction error based on lyapunov exponent, the estimation express the reliability of prediction numerically. at the same time, in order to improve the predictive precision it drew out an error complement methods creatively to correct one step prediction

    Lyapunov指數定量刻畫混沌離散動力系統的平均發散程度,基於lyapunov指數作出了一步預測的誤差估計,以此來定量反映預測的可靠性;根據奇異吸引子流形的性質,創造性的提出殘差補充法,對預測值作出修正以降低誤差,提高預測精確性。
  13. To accept the current signal from high negative voltage circuit, the analog ground is raised to a certain positive voltage, which makes it possible for the signal amplitude to be compressed at the same time of its polarity reversion. a pi control program special for laser gyro current control is brought forward according to the conventional pid control method, in which the control signal is figured out corresponding to the difference between the sample and the reference value by turn of proportion - short step integral - long step integral. and at the end of this paper, a comparison of system performance on different conditions is made and the key elements influencing system performance are educed

    利用集成a / d 、 d / a轉換器的新型晶元aduc824 ,實現了電流(電壓)采樣?數據處理?電流控制的閉環控制結構;地電位的抬升解決了a / d轉換器對負高壓迴路電流采樣時的輸入范圍匹配問題;控制信號反相的同時進行幅度壓縮,使得輸出調整電壓的解析度提高;根據常規的比例?積分?微分( pid )調節模型,針對陀螺系統的特性,給出了一種可以滿足系統要求、據采樣值偏差大小進行的比例?大步長積分?小步長積分、分層次比例?積分演算法;不同條件下系統穩流性能的對比、分析在論文最後給出,並據此找出了決定該系統穩流精度的關鍵因素,提出了系統的改進意見。
  14. The spatial member - story model is adopted as the dynamic analysis model for base - isolated structures by considering the isolation device as a special element, the dynamical equation is established, time - history analysis is conducted by step - by - step integration and iteration methods, and program of dynamic analysis on base - isolated structures ( dabis ) which can be used for analysis on multi - dimensional and lateral - torsional coupled seismic response of base - isolated structures is worked out

    將隔震裝置作為特殊單元,採用空間桿系?層模型作為基礎隔震結構動力分析模型,建立其運動方程,採用逐步積分法和迭代法進行時程反應分析,編制了可進行基礎隔震結構多維及平?扭耦聯地震反應分析的基礎隔震結構動力分析程序dabis 。
  15. The boundaries had sufficient capacity to offer and hold the vehicles that moved in or out. the density of vehicles would tend to a certain stable value with the acceleration of time step, which could reflect that the urban traffic had appropriate capacity

    周邊有充分能力提供和接納出、入車輛,車輛密度將會隨著時間步的增多趨向某穩定值,以反映城市的交通存在某適宜的容量。
  16. The research paper is based on the the latest softwares of the managing inventory, its research subject is about simulating the most appropriate inventory quantity and ordering quantity by statisticing the probability of the random require quantity. its purpose is to provide the relied basement for determining the most appropriate inventory quantity and ordering quantity, the deterring policy quality will be raised, so the damage caused by unfit inventory quantity and the benefit of the entrerpreneur will be raised. the research method is by building the inventory management information system, the system includes automated management of parts entering and going out the datasbase. requesting the records of parts entering and going out the datasbase and displaying the sygonal when the inventory quantity is short out. computer calculating the fix period remaining, requesting remaining at any time and displaying if goods need ordering, all the partsof certain a product going out of basement and at the same time checking if the storaging quantity is enough. then simulating the most appropriate inventory quantity and ordering quantity simulating method is as follows : statisticing the random required quantity. calculating the probability, standing for the values with data range producing random data by function accordingly calculating the random required quantity. thenext step is simulating all the projects after pressing in the simulating conditions. finally selecting the best

    本文通過分析國內外關于庫存管理軟體的發展情況,提出在線統計貨物出庫情況的基礎上利用模擬方法確定最優存儲方案,其目的是為制定合理的貨物安全庫存量和訂貨量提供可靠的依據,提高企業管理人員的決策質量,從而減小資金的佔用和缺貨損失,提高企業的經濟效益。通過研製庫存管理信息系統使庫存信息管理自動化,也就是實現貨物入出庫管理計算機管理、自動查詢貨物入出庫情況並在缺貨時給予提示、使用計算機貨物余額定期結算、貨物余額實時查詢並顯示是否需要訂貨、裝配出庫管理使得只要輸入需要裝配產品代號和數量,組成它的所有零件就會自動檢庫和出庫。然後對安全庫存量和訂貨量進行模擬,模擬方法是首先自動統計貨物在過去某一段時間內的需求量,計算出概率,用隨機數的范圍表示其概率數值的大小,利用隨機函數產生隨機數、從而間接的產生隨機需求量,給定模擬天數和其他模擬條件模擬各種方案,從眾多的存儲方案中找出最優存儲方案。
  17. For a long time, because the cpeb has primarily faced to the internal market, not being familiar with international traditions, being lack of experiences of the international project operation, under these conditions how to carry oversea projects to work well, create the frame of international business organizations and function mechanism to adapt to the needs of the international markets, and make the good economic benefits for the existing oversea projects, which become the urgent problem need to be settled. this text analyzes the development and management of cpeb and its oversea projects, analyzes the existing problems according to substantial studies on the spot directly and indirectly. next the text lays out a system management mode of oversea projects for cpeb, establishes the strategic targets for the first step

    本文分析了長慶石油勘探局及其海外項目的發展和運營情況,根據間接、直接實地取證研究,分析目前長慶局海外項目運營所存在的問題,系統規劃了長慶局海外項目管理模式,初步確立了長慶局海外項目的戰略目標,在對長慶局海外項目現行組織結構分析的基礎上,提出完善長慶局國際業務的具體設想,對海外項目的組織結構提出了建設性的意見,最後,提出了長慶局海外項目的管理策略:以項目招投標決策管理為起點;以合同管理為基礎;以計劃管理為主線;建立管理信息系統,實施有效跟蹤;強化工程項目的預算計劃控制,全面提高項目管理的水平。
  18. It elaborates on the 3 - step start technique. i adopt the method which permits the bldc motor to automatically search the best time to change its operation stage from a separately controlled synchronous one to a self controlled one using the back emf as the commutation signal. this method prevents the stepping out and stopping problems in the changing procedure of the motor

    闡述了電機的三段式起動方法,在直流無刷電機由起動階段外同步運行切換到反電勢換向自同步運行的過程中採用了自尋最優點切換的方法,保證了電機在切換過程中不會發生失步和停轉現象。
  19. It s time to step out on faith, i ve gotta show my faith

    深愛著你你說過愛在這一生里
  20. The list betterments aimed at the properties of system : through the testing of dc voltage, pulse width and inverting voltage and frequency can be regulated online to fit for different steady load ; reducing speed ripples by compensating with nonzero voltage working proportional time ; adopting the technology of harmonics suppression. as a result, the high precision and wide speed control is realized and the step out is overcome

    針對系統的性能指標,做了如下改進:對直流側電壓的檢測,在線調整逆變器導通脈寬、輸出電壓和頻率,可以適應不同大小的恆負載;並用非零電壓矢量作用時間進行補償的方法,減小電機的低速脈動;加入了諧波抑制技術等。
分享友人