surface accident 中文意思是什麼

surface accident 解釋
地表事故
  • surface : n 1 表面;地面;水面;廣場,空地。2 外觀,外表,皮毛。3 【幾】面;切口;【航空】翼面。adj 表面的...
  • accident : n 1 故障,事故,偶發事件;偶然。2 災難,災害,不幸,不測,意外,橫禍。3 附帶事件,附屬品。4 【哲...
  1. The final group of 45 workers brought out through an auxiliary shaft normally used to remove debris arrived at the surface shortly before 9 p. m., walking out caked in dust but otherwise healthy a day and a half after the accident

    晚上九點前不久,用來處理碎片的備用救生梯將最後45名礦工帶到地面,事故發生一天半后,他們身上沾滿泥塊走出來,但健康狀況良好。
  2. August 25, 1999 the preliminary on - site investigation including surveying of the wreckage plot and taking of surface and aerial photographs of the air crash accident has been completed today ( wednesday )

    民航處今日(星期三)已完成在客機意外肇事現場進行的初步調查工作,包括為客機殘骸分布圖進行測量及拍攝地面及空中圖片。
  3. The paper makes the analysis of an engineering accident of the cracking of adjacent existing buildings caused by surface subsidence from groundwater lowering during the construction of large diameter dig - hole piles, finds out the cause, presents the treatment scheme and effectively guarantees the smooth conducting of the project

    該文對由於大口徑人工挖孔樁施工降水引發地面沉降,造成鄰近建築物開裂的工程環境事故進行了分析,查明了原因,並提出了治理的方案,有效地保證了工程的順利進行。
  4. At last, the law of deformation of pit bottom and surrounding surface in different stress state and in different excavating step is obtained, and the same to the saturatin g process of surrounding soil. to some extent, in predicting the deformation of surrounding soil and retaining structure in construction, in preventing the foundation pit accident from happening, in insuring the security of environment and regular use of pipes underground, and in giving advice to deep loess foundation pit engineering in practice, the conclusion is of theoretical and practical value

    得出了不同應力狀態下和不同開挖步驟時以及基坑周圍土浸濕過程中黃土深基坑坑底及基坑周圍地表的變形規律,所獲得的結論對于黃土深基坑施工過程中周圍土層及圍護結構的變形預測,防止黃土深基坑事故的發生及周圍環境的安全與地下管道的正常使用,指導黃土深基坑工程的實踐具有一定的理論和實踐參考價值。
  5. A huge actual constructions and tests has proved that the bonding power of the bonding surface is often too small to satisfy the actual stress, and that in the construction of the new to old concrete, the construction process is blind because there are no unified standards of the construction technology, which leads to the quality of the construction is inferior. and in the design process, the designers who can ’ t identify the strength of the bonding surface can not make an accurate, economic and proper design, which will lead to waste or engineering accident

    大量的實際工程和試驗證明,結合面的粘結力通常比較小,往往難以滿足實際結構受力的需要,而且在新舊混凝土粘結的施工過程中,施工工藝沒有統一的標準,造成施工過程的盲目性,最終導致工程質量的低劣;在設計過程中設計人員不能判斷出粘結面的強度,這就使設計人員不能準確、經濟合理的做出設計,造成浪費或埋下工程事故的隱患。
  6. Riding in hot weather in clothing such as shorts or short - sleeved shirts is not advisable as your skin will have no protection in an accident if you fall and slide on the road surface

    在炎熱的天氣下駕駛電單車,不宜穿著短褲或短袖恤衫,因為當你因意外跌倒或滑倒時,皮膚得不到保護。
  7. Codes for road traffic accident scene - part 4 : code of road surface type

    道路交通事故現場信息代碼.第4部分:道路路面類型代碼
  8. Codes for road traffic accident scene - part 5 : code of road surface type

    道路交通事故現場信息代碼.第5部分:道路路面情況代碼
  9. During long term operation, if there occurs leakage of oil in protective tube, compression fittings closely attach to the surface of sheathed thermocouple and completely prevents leakage of oil to reduces manual operation and avoid accident happening

    在長期使用中,若套管漏油,固定裝置連接處的密封卡套螺絲已緊密緊摳在鎧裝熱電偶表面,徹底隔斷下部漏油,減少了人工操作,避免了事故的發生。
分享友人