surrounding rock stress 中文意思是什麼

surrounding rock stress 解釋
圍巖應力
  • surrounding : n 〈pl 〉周圍的事物[情形],環境;附近。 picturesque surroundings 畫一樣美麗的環境。 social surrou...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. Basing on this, the paper researches the mechanism of floor heave, and analyzes the effects of gravity stress, tectonic stress, the strength of surrounding rock, terrestrial heat and imbibition water on floor heave

    在此基礎上,研究深部開采條件下巷道底鼓發生的機理,並對自重應力、構造應力、圍巖強度、地溫、水對底鼓的影響進行了分析。
  3. The thesis analyzes the effect of the increase of mining depth on the floor heave, discusses the laws that gravity stress, tectonic stress, the strength of surrounding rock, terrestrial heat and imbibition water change with the increase of mining depth

    分析了采深對巷道底鼓的影響,以及自重應力、構造應力、圍巖強度、地溫、水隨開采深度變化的規律。
  4. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道拱部結構過于扁平,開挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  5. Stress tests of surrounding rock mass in substratum cavity

    地下洞室圍巖三維應力測試實例
  6. The results show that the internal friction angle of rock has importance affect on the displacement of surrounding rock for deep roadway when in - situ stress and support resistance all are certain

    分析結果表明,在地應力和支護阻力一定時,巖石的內摩擦角對深埋巷道圍巖位移的影響最為明顯。
  7. ( 2 ) taking the geology analysis as main way and combining the pre - test, predicating the tunnel ' s main geology condition ( rock quality, surrounding rock classification, long - wide joint, fault, ground water, crustal stress ), and predicating the main potential disaster ( collapse, breaking water, rockburst, large deformation ) ( 3 ) employing the stress test result and inverse analysis of the stress field, finding out the crustal stress " s distributing rule along the tunnel axes section : the highest crustal stress is 24mpa near the deepest spot, and predicting that the k2 + 260 ~ k3 + 000 likely to be the high crustal stress segment for this tunnel

    通過地質分析、類比分析、監控量測、數值模擬、神經網路等方法,對鷓鴣山隧道潛在的主要地質災害(塌方、涌水、巖爆和大變形)進行了預測預報( 3 )在現場地應力測試成果的基礎上,運用數值計算進行應力場反演,基本查明了沿隧道軸線剖面的地應力分佈規律:地應力量級在最大埋深附近達到最大值24mpa ,並預測k2 + 260 k3 + 000段將很可能成為鷓鴣山隧道的高地應力段。 ( 4 )塌方往往與斷層破碎帶及千枚巖相聯系。
  8. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室結構,就兩種襯砌結構型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌結構選型角度分析對比了兩種襯砌結構型式在圍巖及襯砌結構應力與變形、襯砌結構鋼筋混凝土開裂、圍巖與襯砌結構聯合承載、結構安全儲備、經濟等方面的優劣。
  9. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。
  10. Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides

    拱頂在核心土開挖后,在一定范圍內出現拉應力區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核心土必須邊開挖邊架設工字鋼拱架,使之與左右導洞拱頂工字鋼形成整體。
  11. With the increase of lateral pressure modulus, the magnitude of principal stress decreases and the direction of it is hardly changeable ; with the increase of the angle between the direction of the maximal horizontal principal stress on magnitude and the fault bearing, the magnitude of principal stress increase and its direction can hardly change ; with the increase of the elastic modulus of rocks, the magnitude of principal stress increases and the direction changes more ; with the increase of pr, the magnitude of principal stress decreases and the direction changes more ; with the increase of lateral pressure modulus, the principal stress at hance, the tress at topmost arch, bottom arch and principal stress at lateral arch decreases, with the increase of the depth of tunnel, the stress of surrounding rock also increases, and the poorer the quality of surrounding rock is, the little its principle stress is

    分析得出,隨著側壓力系數的增大,主應力量值減小,主應力方位難改變;隨著與斷層走向的夾角增大,主應力量值增大,應力方向難改變:隨著巖石的彈性模量的增大,主應力量值增大,方向變化越大;隨著泊松比的增大,主應力量值減小,方位變化越大。隨著側壓力系數的增大,頂、底拱處的各應力值增大,拱腰處的主應力減小,剪應力增大,側拱處的各主應力減小,同一側壓力系數的條件下圍巖質量越差,各應力值也越小;隨著洞室埋深的增加,圍巖壓力也增大,圍巖質量越差,其應力值也減小。
  12. Erosion damage decreases rock load area, after defining damage variable, the damage stress in rock can be calculated by the method bring forward by lemaitre conveniently. for surrounding rock of a deep buried tunnel under the condition of drained, its seepage character is not only controlled by the high stress in rock, but also influenced by the development of erosion damage. in the whole course of rock " s deformation and failure, its seepage character decreases with the increment of stress in elastic stage, while " increases with the development of failure

    巖樣中全應力?應變三軸滲透試驗過程中的典型表現為隨著應力的增加,巖體內的空隙和裂紋受載閉合,滲透性降低,應力達到一定閾西南交通大學鷹士研究生學位論文第11頁值后,巖體內部裂紋發生擴展和歸並,滲透性增強;同樣,地下水的動、靜壓力作用對裂紋的擴展和歸並也起著促進作用。
  13. And that, the variable regulations of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized for the right and the left bank of underground chambers

    全面總結了溪洛渡水電站左、右岸地下廠房洞室群圍巖應力,變形和破壞區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工設計提供了基礎資料和理論依據。
  14. And the variation characteristics of stress field, strain field and plastic failure zones in the surrounding rock mass of the underground cavities are summarized, which provides basic information and reference for the evaluation of underground cavities stability and project construction

    總結了地下洞室群圍巖應力、變形和破壞區的分佈特徵和變化規律,為洞室群穩定性評價和工程施工設計提供了基礎資料和參考依據。
  15. The classification of the surrounding rock divides the rock in the respect of quantitative classification and gets the qualitative gradation of the engineering rocks by correction of underground water, correction of weak structural plane and correction of original stress field

    圍巖分級主要從定量分級的角度對圍巖等級進行劃分,並通過地下水修正,軟弱結構面修正和初始應力場修正,得到修正後的工程巖體質量等級。
  16. According to the result of monitoringmeasurement and the test data of surrounding rock pressure, primary supportstress and structure internal force, analyzed the law of soft rock deformationin the extremely high ground - stress portion of baozhen tunnel, and adjusted therelevant construction parameter, that insured construction safety

    根據現場監控量測結果和對圍巖壓力、初支應力、結構內力的測試數據,分析了堡鎮隧道極高地應力段軟巖大變形的規律,及時調整相應施工參數,確保了施工安全。
  17. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  18. Results show that clamping angle dominated displacement of anchorage and failure mechanism : surrounding rock and soil compaction is induced by small clamping angle, instead, shear failure occurs in neighborhood soil of leading end of anchorage while clamping angle is big ; anchorage length influenced surrounding rock stress as nonlinear self - organization critical characteristic on interface ; anchorage size contribution to systemic primary monitor parameter is relatively uniform

    研究發現:夾持角控制著錨碇變位和破壞機理,夾持角過小時錨碇壓密圍巖土體,較大時錨碇前端附近土體則產生剪切破壞;錨碇長度影響接觸面圍巖應力量值,表現為非線性的自組織臨界特徵;錨碇體粗細對系統主要監控參數的貢獻相對均勻。
  19. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧洞圍巖結構非線性有限元模擬計算模型,然後考慮隧洞的開挖過程、水荷載的作用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開挖過程與圍巖及支護結構的應力、位移和塑性區的關系。
  20. Aiming at the characteristic of the distortion of the extremely hard maintained roadway, the numerical analysises were made on surrounding rock stress and displacement in roadway with flac program

    摘要針對極難維護放頂煤回採巷道的變形特點,依據flac程序對不同支架形式的巷道圍巖應力場和位移場進行了數值模擬。
分享友人