time-dependent load 中文意思是什麼

time-dependent load 解釋
隨時間變化的載荷
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • dependent : adj. 1. 依靠的,依賴的。2. 從屬的,隸屬的,【語法】從屬的。3. 由…決定的。4. 下垂的,懸吊的。n. 1. 受贍養者,靠人生活的人。2. 扈從,侍從。3. 依存[從屬]物。
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  1. At last distribution functions of load modes in life service are presented. based on the resisting force model and load model, the limit state equations of rc bridge are formulated. according to the resisting force is time - dependent and vehicle load is the non - gaussian distribution, jc method is applied to calculate the time - dependent reliability index of rc bridge

    在抗力衰減模型及橋梁荷載模型的基礎上,將可靠度理論引入橋梁結構的評定中,推導出了橋梁結構耐久性極限狀態方程,並根據耐久性極限狀態方程中抗力是時間的函數,以及車輛荷載為非正態分佈的特點,應用當量正態法( jc法)編制相應的程序計算橋梁構件的時變可靠度指標。
  2. In this paper, based on resisting force model and load model, the limit state equations of rc bridge are established, thus the time - dependent relationship of rc bridge reliability is analyzed

    本文在抗力衰減模型及橋梁荷載模型的基礎上,通過建立耐久性極限狀態方程,分析計算橋梁可靠度隨時間的變化情況。
  3. Test reporting phase for the call setup time problem involves coming up with the relationship of the call setup time with any dependent variable including ram and the load

    調用啟動時間測試的測試報告階段涉及到建立調用啟動時間和包括ram以及載荷在內的任何獨立變量之間的關系。
  4. A series of specimens with circular sections were tested, which included the short - term behavior of 24 frp - confmed concrete specimens under different load eccentricities and the long - term behavior of eight frp - confined concrete columns under different load ratios. an attempt to predict the time - dependent behavior of frp - confined concrete columns and beam columns with circular sections is proposed by the aci209 ( 1997 ) specifications model

    本文進行了frp約束混凝土柱的一系列試驗研究,包括24個frp約束混凝土構件在不同偏心率情況下的一次加載試驗研究和8個frp約束混凝土軸心受壓構件在不同軸壓比情況下在長期荷載作用下的力學性能試驗研究。
  5. Abstract : in this paper, the feature of time - bifurcation for plate - beam stability is studied by mechanics model of plate - beam structure of rock in compression. the instability time of plate - beam is dependent on the rock material feature. delay bulking occurs under some load. the formula of time - bifurcation is given. the mechanisms of roadway floor heave and delay rockburst are preliminarity discussed

    文摘:採用巖石板裂梁的縱向受壓的力學模型,考慮深部巖石的流變性,分析了板梁穩定性的時間分叉特性.板梁失穩與巖體的流變性質密切相關,在一定載荷下,經歷一段時間后會發生延遲失穩,給出了時間分叉點的計算式.並對深部礦井延遲性巖爆發生機制進行了初步分析
分享友人