transformer capacity 中文意思是什麼

transformer capacity 解釋
變壓器容量
  • transformer : n. 使變化的人[東西];【電學】變壓器;變換器;互感器。 polarity of transformer 變壓器繞線方向。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. This paper explains the effective encouraging mechanism of electrovalence at present, analyses the close relationship between the primary transformer capacity for electric power using in the enterprise and the basic electricity expenses and the electricity in peak time, the relationship between the power factor and the electricity expenses per degree. the ways and measures of reducing electric cost and decreasing electricity expenses expenditurze are proposed

    通過闡述現行電價政策的有效激勵機制,分析了企業用電主變壓器容量與基本電費和峰谷分時用電及企業功率因數與電度電費的密切聯系,提出了企業降低用電成本、減少電費支出的途徑和措施。
  2. The power ’ s quality is decided in the system performance, the amplifier has 4 groups ’ power sources, input 220v through the filter, the transformer transformation, the full - wave rectification, finally through manostat leveling off voltage, after the electric capacity filter outputs

    電源質量的好壞是決定系統性能的一個重要因素,放大器共4路電源,輸入220v通過型濾波,變壓器變壓,全波整流,最後通過三端穩壓器穩壓,電容濾波后輸出。
  3. It decreased the power consuming and the capacity of transformer, and then the benefit of the mining bereau was raised

    該項措施既降低了能耗也減少了變壓器的容量,提高了礦務局的效益。
  4. Under the condition of meeting the power supply requirement, the relationship is analyzed between the traction transformer capacity and voltage loss of variant parts as well as the short - circuit capacity of the power system

    在滿足供電要求的情況下,計算分析了牽引變壓器容量與各部分電壓損失、電力系統短路容量的關系。
  5. For the circuit - breakers of rated voltage 252kv up, the synthetic test methods are introduced according now condition because of the limitation of the transformer short - circuit capacity. the correlative prescribes on switching line - charging current in gb / t1984 - 200x " alternating - current high - voltage circuit - breaker " are discussed according to the test results and theoretic analysis

    由於開合空載架空線路試驗對電源側的阻抗有明確的規定,這就要求試驗電源必須具有足夠大的短路容量,實驗室很難滿足要求,因此,一般對較高電壓等級的斷路器採用合成試驗方法,本文介紹了利用現有條件,對252kv以上電壓等級的斷路器採用合成試驗時的試驗線路。
  6. Firstly, the thesis briefly reviews the history of voltage and reactive power control technology, focusing on the defects of the equipment in use. then, with the theoretical analysis and the discussion on voltage and the characteristic of power system as well as the basic principle of voltage and reactive power control, the thesis makes a research on the character of voltage and reactive power control and interprets the controlling regularity of substation. in addition, with the consideration of the changes of transformer tips and the combined influence of capacity groups and reactive power and voltage, the thesis makes adjustment suggestion to the different operating - zones of voltage and reactive power

    本文從降低網損和提高變電站自動化水平著眼,對變電站電壓無功控制應用方面的問題進行了研究,本文首先簡要回顧電壓無功控制的發展概況,著重指出了現有電壓無功控制裝置的缺陷;通過理論分析,在討論電力系統電壓、無功調節特點以及電壓無功總體控制原則的基礎上討論了變電站電壓、無功控制特性以及控制原理,給出了變電站電壓無功的控制規律;考慮了變壓器分接頭的變化及電容器組的投切對無功和電壓的綜合影響,針對電壓、無功的各種運行控制區域給出了相應調節策略。
  7. Dinghu are mainly relied on the power supply of the power grid of guangdong province, there are four 110, 000 v transmit and transformer substations, one thermal power plant with a total installed capacity of 3000 kw in the first duration, and a total capacity of power supply of 75000000 kw and a daily load of 15000 kwh in the district, the power grids are perfect and cover the whole district

    鼎湖區主要依靠廣東省大電網供電,全區擁有4個11萬伏輸變電站和一家首期容量3000千瓦的火力發電廠,總供電能力超過7500萬千瓦,日負荷達1 . 5萬千瓦時。區內代電網路齊全,供民線路覆蓋城鄉。
  8. Generator capacity 500kw, 1 unit, transformer capacity 2500kva,

    電氣工程發電機容量500kw 1臺、
  9. The emulational calculating theories of traction power supply system ' s operating charts combine with actual things of engineering design at present in chapter three, to set up traction web current distributing mathematical model, integral distributing mathematical model, locomotive distribution and obtaining current model at every moment, and on which making use of mathematical planning methods to set up mathematical models is based at every moment in every instance interval of the railroads. for instance, instantaneous current, instantaneous voltage descent and effective current, main changing capacity and so on, in addition, there are the minimum power shortage model, the optimal transformer substation location, the least engineering expenditure, the optimal mathematical model of traction power supply system. optimize design ' s algorithm of traction power supply system is introduced in detail in chapter four, where programming idea and realizing method of the computer software are given an explanation

    本研究主要進行了以下工作:結合牽引供電系統運行圖的模擬原理和現行工程設計的實際情況,建立了牽引網電流分佈、積分分佈、任一時刻機車分佈和取流的數學模型;應用數學規劃方法建立了任一距離區間、任一時刻的瞬時電流、瞬時電壓降數學模型和有效電流、主變容量和主變壓降、最小功率損失、最佳變電所容量、最佳變電所位置、最少工程費用、最少運營維護費用和牽引供電系統方案最優等方面的數學模型;闡明了牽引供電系統優化設計的演算法和計算機軟體編程思想及實現方法;進行了工程實例計算;最後,對牽引供電系統優化設計技術應用進行了總結。
  10. Three phase dry type power transformer, which make it with those features : safety, reliability, and energy saving, fireproof, flameproof, simple maintenance etc., the design is advanced ; the structure of products is reasonable and the outline is fine, the main performances of the products are much better than the national standards, for example, partial discharge level no - load loss, on - load loss, noise level, it is adaptable for application on heavy humidity and severely pollute places which are near to lake, sea and rive, as well as, high demand - fireproof, heavy load capacity place, such as : high building, airport, station, port, underground, hospital, electrical power station, metallurgy, shopping center, residential area and petroleum chemical industry, nuclear power station, nuclear - powered submarine

    非包封線圈三相干式變壓器,具有安全可靠節能防火防爆維護簡單等優點。其設計先進結構合理外形美觀。主要性能指標均優于國內標準,如局放水平空載損耗負載損耗噪聲以及能適應高溫度環境使用等,可安裝在靠近湖海河邊污穢潮濕的環境及防火要求高負荷較大的地區,適用於高層建築機場車站碼頭地鐵醫院電廠冶金行業購物中心居民密集區以及石油化工核電站核潛艇等場所。
  11. Transformer feeders shall have a capacity not less than the rating of the transformer

    變壓器饋電線的載流量不應低於變壓器的額定電流。
  12. This production line is specialized in making transposition wire windings of large capacity, high voltage and power saving transformer

    本設備是用於製造大容量高電壓等級節能變壓器換位導線繞組的專用設備。
  13. It can be operated without power off, production stopping, new oil exchange, filtration paper utilization and transformer with electricity with capacity of vacuum air bleeding and vacuum oil adding function

    能在不停電不停產不換新油不用濾紙變壓器帶電運行的情況下,對不合格變壓器油進行處理。
  14. The basic principle of earthing transformer is analysed. a proper capacity calculation method for earthing transformer is introduced. the calculation example is given too

    分析了接地變壓器的基本原理,介紹了一種比較合理的接地變壓器容量計算方法,並給出了計算實例。
  15. For the power demand of users, the power system scale is rising, so does single transformer capacity

    為了滿足電力需求,電力系統的規模日益擴大、變壓器的單機容量也隨著增大。
  16. Industrial users with transformer capacity above 315kva should apply double charge system : basic charge + power charge + interest rate adjustment charge

    變壓器容量在315kva以上的工業生產用戶應執行兩步制電價:基本電費+電量電費+利率調整電費。
  17. Construction content : electric power construction - 3 sets of transformer capacity

    工程內容:電力工程變壓器容量1500kva 3臺
  18. Note : 1 、 users with transformer capacity above 100kva should apply interest rate adjustment charge system : power charge + interest rate adjustment charge

    說明: 1 、變壓器容量在100kva以上的用戶應執行利率調整電費:電量電費+利率調整電費。
  19. Electricity and pneumatic construction - with 15000kw generator capacity, 4 units, with transformer capacity 18525kva, total 14 units, water discharge - supply construction, weak electricity construction, monitor construction, and air system construction - total 1060rt

    電氣工程發電機容量1500kw 4臺變壓器容量19525kva共14臺給排水工程弱電工程監控工程空調工程共1060 rt
  20. 2500 kva transformer capacity, 5 units, electric power equipment capacity 4, 900kva, monitor construction, total 2, 000 spots, clean room construction - clean room class 1, 000, air system construction - total 2, 396 rt, ice - storage construction - total 12, 000 ton hr, water discharge - supply construction, fire system construction, weak electricity construction, steam construction, and nurse call

    無塵室工程無塵室等級class 1 , 000空調工程共2 , 396rt儲冰工程共12 , 000ton hr給排水工程消防工程弱電工程蒸氣工程nurse call
分享友人