tunnel driving 中文意思是什麼

tunnel driving 解釋
隧道掘進
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • driving : adj. 1. 推動的,起推動作用的。2. 【機械工程】傳動的;主動的。3. 猛沖的。4. 精力充沛的,有上進心的;(監工等對工人)苛刻的。5. 駕駛的,操縱的。
  1. Rapid driving of eastern railway transportation tunnel of xutuan coal mine

    許疃煤礦東翼軌道運輸巷道快速施工技術
  2. Measurement of anti - slide performance of tunnel road surface and its effect on driving safety

    隧道路面抗滑性能測定及其對行車安全影響分析
  3. Application of semi - metallic friction material on tunnel entry - driving machine

    半金屬摩擦材料在隧道掘進機中的應用
  4. Special emphasis is laid upon the construction operation process of flat tunnels with outsized span at even shallow depth, meanwhile, how to build large span flat tunnel is briefed in this article. measures taken to reduce vibrations caused by explosion in driving tunnel and surface subsidence and methods of monitoring and surveying in the course of construction are detailed in this article

    本文扼要介紹了大跨扁平隧道的施工方法,重點闡述了特大跨超淺埋扁平隧道的施工工藝過程,對爆破振動和地表沉降的控制方法,以及施工監控量測的過程和方法,並通過對量測結果的分析,說明監控量測對施工的指導作用,並對圍巖穩定性進行了一些簡要分析。
  5. Driving in cheung tsing tunnel

    在長青隧道駕駛
  6. Analysis of random factors affecting on deformation of ground surface during shield - tunnel driving

    盾構法隧道施工影響地表變形的隨機因素分析
  7. Charging technique of emulsified explosive by pumping and its application to tunnel blasting driving

    乳化炸藥泵送裝填技術及其在隧道爆破中的應用
  8. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
  9. However, since the cwb within the criii is a tunnel, it is important to avoid a sharp curve and to maintain a minimum sight distance for driving safety

    的中環灣仔繞道是一條隧道,因此為了安全駕駛起見,除了要避免急彎外,也要維持最短的視距。
  10. Analysis of surrounding rock deformation mechanism induced by excavation of super - large cross - section tunnel with different driving method

    不同工法開挖超大斷面隧道引起圍巖變形機理分析
  11. Since the cwb within criii will be built in the form of a tunnel, it is important to avoid sharp curves and maintain the minimum sight distance for driving safety considerations

    由於該工程范圍內的中環灣仔繞道將以隧道方式興建,為了行車安全,避免該繞道出現急彎和保持最低視距是非常重要的。
  12. Avoid driving through the cross harbour tunnel as far as practicable

    避免使用紅?海底隧道;
  13. Driving in excess of speed limit indicated by a speed limit sign of the type shown in figure no. 6 or 7 in the schedule to the discovery bay tunnel link bylaw cap 520 sub. leg. by more than 15 kilometres an hour, other than where item 56 or 57 applies

    以比《愉景灣隧道及連接道路附例》 (第520章,附屬法例)附表第6或7號圖型所示類型的速度限制標志顯示的速度限制高出逾每小時15公里的速度駕駛,但第56或57項適用的情況除外
  14. Driving in excess of speed limit indicated by a speed limit sign of the type shown in figure no. 6 or 7 in the schedule to the discovery bay tunnel link bylaw ( cap 520 sub. leg. ) by more than 15 kilometres an hour, other than where item 56 or 57 applies

    以比《愉景灣隧道及連接道路附例》 (第520章,附屬法例)附表第6或7號圖型所示類型的速度限制標志顯示的速度限制高出逾每小時15公里的速度駕駛,但第56或57項適用的情況除外
  15. Driving in excess of speed limit indicated by a speed limit sign of the type shown in figure no. 6, 7, 8 or 9 in the schedule to the tai lam tunnel and yuen long approach road bylaw cap 474 sub. leg. by more than 15 kilometres an hour, other than where item 51 or 52 applies

    以比《大欖隧道及元朗引道附例》 (第474章,附屬法例)附表第6 、 7 、 8或9號圖型所示類型的速度限制標志顯示的速度限制高出逾每小時15公里的速度駕駛,但第51或52項適用的情況除外
  16. Computer assistance decision system for driving and supporting of tunnel

    巷道掘進支護計算機輔助決策系統研究
分享友人