tunnel surveying 中文意思是什麼

tunnel surveying 解釋
隧道測量
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  • surveying : n. 測量(學、術),勘測。 a surveying reporter 測量員。 a surveying ship 測量艦。
  1. Probe into some problems in tunnel demarcation surveying

    隧道限界測量若干問題探討
  2. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明隧道混凝土二次襯砌中的底界厚度、空洞、漏水、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及工程檢測實驗的研究,進行隧道二次襯砌中雷達波形特徵參數及檢測結果評價,總結了隧道襯砌質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  3. It makes decision on stability state of countryrock according to in - situ surveying datum, and grey prediction model is formed using the deformation curve of country rock. this model can predict latter displacement of country rock. deeper analysis is also been counducted on countermeasure and mechanism of softrock tunnel, and gradation analysis method is applied to select the optimum bracing plan

    再結合現場實測資料對地下洞室圍巖的穩定狀態進行判別,利用圍巖變形曲線建立灰色預測模型,採用該模型對圍巖位移的後期變形進行預測。對軟巖隧道的支護對策、支護作用機理進行了較深入的分析研究,並利用層次分析法選擇最優的支護方案。
  4. First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor

    作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。
  5. Based on the practical characteristics of large span and duplex arch of xipuling tunnel, this paper expounds the workings of regression analysis and the analytical method of monitoring and surveying data in the construction of tunnels

    摘要基於西圃嶺隧道大跨度、雙連拱的實際特點,闡述了隧道施工過程中監控量測數據的回歸分析原理及分析方法。
  6. Special emphasis is laid upon the construction operation process of flat tunnels with outsized span at even shallow depth, meanwhile, how to build large span flat tunnel is briefed in this article. measures taken to reduce vibrations caused by explosion in driving tunnel and surface subsidence and methods of monitoring and surveying in the course of construction are detailed in this article

    本文扼要介紹了大跨扁平隧道的施工方法,重點闡述了特大跨超淺埋扁平隧道的施工工藝過程,對爆破振動和地表沉降的控制方法,以及施工監控量測的過程和方法,並通過對量測結果的分析,說明監控量測對施工的指導作用,並對圍巖穩定性進行了一些簡要分析。
  7. By analyzing the limits of the breakthrough error in tunnel boring survey, the requirement data of the measurement error in different construction stages are obtained, and the precision, methods and schemes of the surveying are determined to ensure the tunnel breakthrough successfully

    摘要通過貫通誤差的限值分析得到不同施工階段的測量限差要求,確定測量精度、方法,制定測量方案,確保盾構隧道貫通。
  8. There are disparities between the standard drawing used in home and abroad after surveying and studying the actuality of the tunnel design

    通過調研國內外隧道設計現狀發現,我國隧道設計中採用的標準圖與國外相比存在差距。
  9. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對場地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測試,對采空區的可能出露部位進行了較為準確的判斷;最後通過鉆探加以驗證,表明面波儀的測試結果是較為合理可信的。
  10. The direction guidance system plays an important part in the shield excavation, such as the prevention of snake motion, the reduction of ground settlement of tunnel construction and the insurance of tunnel quality etc. based on the principle of guidance system, a precise direction guidance system with high accuracy, high efficiency and more reliability is developed, it has the advantages of less times of surveying, real time positioning and shield behaviors monitoring

    盾構導向系統是盾構掘進時的指揮系統,對指導盾構掘進、隧洞貫通、減少地表沉降以及保證隧洞的質量等具有重要的作用。本文在研究盾構導向工作原理的基礎上開發研製了一套盾構導向系統,精度高、工作可靠,可極大地縮短導向測量的時間和減輕勞動強度,實現了盾構掘進的實時定位和姿態監測。
  11. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平隧道必須按「管超前,嚴注漿,多分部、短開挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
分享友人