two-cycle method 中文意思是什麼

two-cycle method 解釋
二次彎矩分配法
  • two : n. (pl. twos)1. 兩人;兩個東西,一對。2. 二的記號。3. 兩點鐘。4. 兩歲。n. -ness
  • cycle : n 1 循環,周期,一轉。2 周時,周年,年紀。3 (詩、故事等的)始末。4 自行車,三輪車,摩托車。5 【...
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Determination of the tendency of lubricants to promote preignition in two - stroke - cycle gasoline engines, test method for

    潤滑劑促使兩沖程汽油發動機預點火可能性的測定方法
  2. Standard test method for determination of the tendency of lubricants to promote preignition in two - stroke - cycle gasoline engines

    測定潤滑油對改進二沖程循環汽油發動機預燃傾向的標準試驗方法
  3. In chapter two, we introduced the theoretic foundation of leading indicator method, modern theory of business cycle and business cycle analysis

    第二部分介紹了先行指標方法的理論依據?現代經濟周期理論和景氣循環方法,為下文的實證分析做了理論準備。
  4. Commercial planning of real estate development project is generally divided into two stages. the first planning stage ’ s key point is the determination of land usage and development cycle. conduct an overall market research and analysis through information collection and on - site survey, initially make out marketing strategy and product plan, and determine land using method and development cycle through financial analysis

    第一部分分析房地產開發項目商業規劃的概念、內容和意義;第二部分從市場調查、確定項目開發方式、商業項目規劃、項目效益分析等六個方面探討項目商業規劃的過程和方法;第三部分闡述了項目規劃實施的幾個主要問題。
  5. Therefore, a positive research method was adopted to put forward two hypotheses during the oil and gas drilling works, i. e, a certain relation existed between operation ' s cost and drilling footage and cycle respectively

    為此,採用實證研究方法,針對油氣鉆井作業的過程提出兩個假設:鉆井作業成本與鉆井進尺呈一定的比例關系;鉆井作業成本與鉆井周期呈一定的比例關系。
  6. The two - stage modeling method takes into account the characteristics of software project risk management and software metrics data, integrates qualitative knowledge and quantitative data. to study the software project iterative process risk ’ s bayesian network model, the definition of cyclic bayesian network is presented, probability convergence property of directed cycle in cyclic bayesian network is proved and probability inference method is put forward

    論文在軟體項目迭代過程風險的貝葉斯網路模型研究中,定義了有環貝葉斯網路,證明了有環貝葉斯網路中有向環的概率收斂性質,給出了有環貝葉斯網路的概率推理方法。
  7. Based on the feature technology and object - oriented mechanism, we found the manufacture - oriented three levels ( namely part, feature and geometry ) model of mechanical part and the resource model ; secondly, we realize the concurrent design of mechanical part and process through decomposing cycle, and then we constitute the evaluation guidelines on the basis of evaluation strategy of levels, which carry out from two levels ( part and feature ) and four phases ( part rough evaluation, feature rough evaluation, feature detail evaluation and part general evaluation ) ; thirdly, we put forward some evaluation methods according the evaluation guidelines, which include the rule - based process evaluation method, rule - based and fuzzy evaluation - based method associated with resources, case - bas ed and feature - based cost estimation method ; at last, we give a manufacturing - oriented evaluation system of rotating mechanical part, which validate the evaluation guidelines and method of the dissertation useful and practical

    以特徵技術為基礎,面向對象的編程機制為手段,建立了面向製造的三層次(即零件層、特徵層、幾何層)零件模型;同時進行了面向製造的資源建模。第二,通過細化循環,採用分層遞階的評價策略,分兩層(零件層和特徵層)四個階段(零件初評價、特徵初評價、特徵詳細評價和零件總體評價)建立可製造性評價指標;第三,以評價指標為基礎,分別提出了基於規則的結構工藝性評價方法、基於規則和模糊綜合評判定性和定量相結合的加工可行性評價方法、以及基於實例和特徵的加工成本估算方法;最後,以solidworks為開發平臺, vb6為編程工具,初步構建了面向製造的回轉類零件可製造性評價系統,它們驗證了本文評價指標和評價方法的實用性和可行性。
  8. The fitness of four negative electrode materials such as al, fe, zn, cd, and of six membranes materials : microfiber glass mat separator, polyethylene, polypropylene, polyvinyl chloride, vinylon, soapnated cellulose acetate, and of four current collects : carbon fiber ; nickel foam ; nickel foam sthongthened by iron wire net, punched silver grid in the super - iron alkaline batteries was comparatively studied. the influence of two storaged method ( with and without electrolyte ) and two impurities ( zno, fe ( oh ) 3 ) to the experiment cell ' s self - discharge nature was also comparatively studied. at last, the nature of discharge. structure and electrochemistry of experimental cell with k2feo4 as cathode active material prepared by three different methods : high temperature reaction, hypochlorite oxidizing and electrolysis, was comparative ly studied. we can conclude : i ) the open - circuit potential and the flat of work potential and the percent of capacity of k2feo4 till 1. 0v during the discharge at constant load of experimental cells decreased by the order of al / k2feo4, zn / k2feo4, cd / k2feo4, fe / k2feo4. as for the nature of charge - discharge cycle, cd / k2feo4 fe / k2feo4 zn / k2feo4. in water solute electrolyte, although al / k2feo4 can n ' t be used as storage battery, it have great potential as primary cell or storage cell from the aspect of its discharge capacity. discharge power

    採用組裝實驗電池、 x -射線衍射( xrd )和循環伏安( cv )的方法,從實驗電池的放電特性、充放電循環特性、自放電特性,不同高鐵酸鹽的結構特性和電化學特性幾個方面,對4種金屬負極材料( al 、 fe 、 zn 、 cd ) 、 6種隔膜材料(復合玻璃纖維、幅射接枝聚乙烯、改性聚丙烯、聚氯乙烯、維尼綸無紡布、皂化再生纖維素) 、 4種集流體材料(泡沫鎳、以鐵網為加強層的泡沫鎳、切拉銀網、炭纖維編織網)在堿性高鐵電池中的適用性進行了比較研究;對2種雜質組分( zno 、 fe ( oh ) _ 3 )和2類不同貯存方式(干、濕)對實驗電池自放電特性的影響進行了比較研究;對3種方法(高溫固相反應、次氯酸鹽氧化、直流電解)所制k _ 2feo _ 4的實驗電池的放電特性、結構特性和電化學性能進行了比較研究。
  9. In recent years, weng cycle life model, logistic mode, grey model, two - way control model, random method etc. are often used to study oil and gas reserves and output

    近年來國內外對油氣儲量、產量及需求量常用的預測方法主要有翁氏生命旋迴模型、邏輯斯諦logistic模型、灰色系統方法、 「儲?產量」雙向控制方法、隨機方法等。
  10. Test method for miscibility with gasoline and fluidity of two - stroke - cycle gasoline engine lubricants

    二沖程汽油機油流動性及其與汽油混溶性測定法
  11. Drilling footage and cycle were regarded as two independent variables, while the drilling data accomplished by the changqing drilling engineering company were taken as samples, and then those two hypotheses were testified by the method of statistical analysis to set up a drilling cost forecast model with a strong explanation

    構建了鉆井進尺和鉆井周期兩個自變量,並以2003年長慶鉆井工程總公司完成的鉆井數據為樣本,運用統計分析方法來驗證這兩個很設,並構建成本預測模型,該模型的解釋力度較強。
  12. On along using two assumptions in portfolio theory : market efficient and investors are risk - aversion, this thesis constructs a multi - cycle portfolio model and works out the investor ' s investment strategy, with the analysis of investor ' s risk preference and the function of investor ' s risk - aversion and making use of dynamic programming optimization method

    在沿用了標準資產組合理論市場有效率和投資者風險厭惡型條件與假設的基礎上,構造了一個多周期的資產組合模型,通過對投資者的風險偏好的分析,結合投資者的風險厭惡函數,利用動態規劃的優化方法得出了投資者的最優選擇策略。
  13. It brings ollt a fem model to calculate lateral earth pressures behide the integral - abutment with considering the inieraction of eallh and abdrient. aiming at the two inherent behavioral deficiencies inherent in all iabs " summer lateral earth. pressure increases after each temperature cycle ; and the settlement adjacent to each abutment develops after each temperatllre cyc1e, this article brings out two method to solve or relieve the above two problems

    本文針對整體式橋臺橋梁的臺后填土存在著土壓力逐年增大以及臺后填土的沉降問題,建立了整體式橋臺橋梁的臺與土共同作用的有限元計算模型;並以臺后填土為研究對象,提出兩種主要處理方法:臺后設置eps壓縮層方案,選用臺後土加筋或置換輕填土方案;通過有限元分析計算了季節性溫度荷載變化下產生的位移在上述處理方法中對于臺後土壓力的影響。
  14. In chapter 3, firstly, we do some demonstration on the long memory character and the statistical cycle of the return series using the r / s analysis method and the dfa method, and we do some research on the stability of the r / s analysis method, the difference and the contact between the two methods too. secondly we account the characteristic index and the tail index of the fractal distribution, we do some demonstr - ation study on the tail index of our country ’ s return series. lastly we summarize the results of our demonstration

    第三章中,首先運用r / s分析法和dfa法對中國股市收益率的長記憶性和統計循環周期進行了實證研究,並且研究了r / s分析法的穩定性以及r / s分析法與dfa法的區別與聯系,其次我們論述了分形分佈中的特徵指數以及尾部指數,對中國股市收益序列的尾部指數進行了實證研究,最後總結了實證研究的結果。
  15. Hence, analytical expressions are developed to allow for characterization of the vehicle ’ s dynamics early in the design cycle. the method involves a two - dimensional hypersonic aerodynamic analysis utilizing newtonian theory, coupled with a one - dimensional aero / thermo analysis of the flow in the engine of the vehicle

    方法中包括一個應用牛頓力學理論的二維的高超聲速空氣動力學分析以及一個一維的氣動/熱分析,後者用於模型發動機中的流體分析。
  16. The key point of the implementation of caiv method is the project performance design and the develop process, for the expense control of these two stages will determine the major part of the weapon model life cycle cost, therefore this paper mainly study the implement of caiv in the development project to the management and the optimized method of weapon equipment

    Caiv方法的實施重點是項目的性能、費用設計及研製過程,因為這兩個階段的費用控制將決定絕大部分的武器型號壽命周期費用,因此本文將主要研究武器裝備的研製項目中如何實施caiv的管理方法和權衡優化方法。
  17. A new maintenance method called pertinence maintenance is also introduced in chapter fourth. chapter fifth is mainly about the cost control of shipping maintenance, integrated with the practice of our shipping company, combined with my work experience, chapter fifth provides two useful models - shipping repair factory chosen model and repair cycle model

    第五章主要介紹船舶維修保養的費用管理控制方法,結合本人機務管理實踐經驗,提出船舶廠修選廠和維修周期決策模型,這些模型對于提高船舶維修保養管理水平具有積極意義。
  18. Standard test method for determination of lubricity of two - stroke - cycle gasoline engine lubricants

    測定二沖程循環汽油發動機潤滑劑潤滑性的標準試驗方法
  19. First, study the concept and the key technology for dfc and analyze every factor influencing the products " cost within the products " life cycle ; second, set up the estimating model of products " cost based on the function to meet the modem products " design idea of the " top - down ", unifying the products " cost and structure on this functional concept ; third, based on the functionally estimating model of the products " cost, propose two grades of products " cost estimating method based on the function. the method can be used in the cost " estimation in the whole course of product design ; finally, regarding solidworks as the developing platform, delphi as the programming tool, structure a based on function - based products " cost estimating system to tentatively prove the practicability and feasibility of this text ' s estimating method

    第一,研究面向成本設計的概念和關鍵技術,面向產品全生命周期分析影響產品成本的各項因素;第二,建立基於功能的產品成本估算模型,以適應「自頂向下」的現代產品的設計理念,將產品成本與產品結構在功能這一概念上得到統一;第三,在基於功能的產品成本估算模型的基礎上,提出了基於功能的產品成本兩級估算方法,此方法可用於產品設計全過程中產品成本的估算;最後,以浙江工業大學碩士學位論文摘要solidworks為開發平臺, delphi為編程工具,初步構建了基於功能的產品成本估算系統,驗證了本文估算方法的實用性和可行性。
分享友人