underground alignment 中文意思是什麼

underground alignment 解釋
地下定線測量
  • underground : adj 1 地(面)下的。2 隱蔽的,秘密的。3 (電影,報刊等)標新立異的,試刊的,試驗性而非正式的。4 ...
  • alignment : n. 1. 列隊,成直線。2. 校直;調整,調準。3. 【工業】準線。4. 【政治學】結盟。
  1. Request the services of a competent person approved by the director of electrical and mechanical services ( dems ) to locate the alignment of all underground electricity cables in the area, irrespective of the excavation depth

    不論挖掘深度為何,必須要求機電工程署署長認可的合資格人士測定工地范圍內所有地下電纜的準線。
  2. Ensure that the alignment ( irrespective of excavation depth ) and the depth profile ( excavation of 450 mm or more ) of any underground electricity cable as identified by the competent person in the area are clearly marked on the ground

    合資格人士測定出的工地范圍內地下電纜的準線(不論挖掘深度)及深度(挖掘深度為450毫米或以上)資料,需確保均清楚地標示在地面。
  3. Mr. lee said the eia report showed that by shifting the track alignment of the new underground station towards salisbury road, the railway scheme can avoid signal hill

    李鏡權說:報告顯示把設于尖沙咀東的新地底車站稍為移向梳士巴利道,可以避免影響信號山。
  4. Remember that the plans are used for reference only and a cable locator must always be used to identify the existence and alignment of the underground electricity cables in the works site or its vicinity

    請緊記:圖則僅供參考,必須經常以電纜探測器測定工地或附近地方是否有地下電纜存在,以及地下電纜的準線。
  5. Do not use hand - held power tools directly over the marked alignment of an underground electricity cable identified by the competent person. only use such tools if the work cannot feasibly be carried out by hand tools

    不得在合資格人士測定並標示出的地下電纜準線位置上,直接使用手提動力操作工具。只有當工程不能以手動工具進行,才可使用手提動力操作工具。
  6. Ensure that a written report of the works is obtained from the competent person and kept. the written report should contain information on the alignment and depth of the underground electricity cable as identified

    確保取得由合資格人士提供的有關地下電纜準線位置及深度測定結果的書面報告,並且將該報告妥為保存。
分享友人