upstream design 中文意思是什麼

upstream design 解釋
上游設計
  • upstream : adv. 向上游,溯流。adj. 1. 溯流而上的。2. (石油工業等)上游的,和石油的勘探、開采及輸送到起運港口有關的〈石油工業此後的提煉等過程則稱為下游(downstream)產業〉。
  • design : vt 1 計劃,企圖,立意要…。2 指定,預定;留給,留著。3 設計,草擬,擬定,籌劃;起草,畫草圖,打(...
  1. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和施工中採取相應的溫控措施提供了參考依據。
  2. Finally, taking the panjiakou reservoir in the haihe river basin in china as an example, the paper analysis the reasonable adjustment scheme of the limited level of the reservoir during the flood season according to the design flood, the flood forecasting, the flood control operation under forecasting, the flood control standard of upstream and downstream of the reservoir, the immigrants range, and the benefits and the risk of the reservoir in a long period of the operation simulation

    最後以海河流域潘家口水庫為分析實例,從設計洪水、預報預泄、洪水預報調度方式、上下游防洪設計標準、上游移民淹沒及土地退賠線、水庫長期運行的風險和效益等多個方面分析論證了水庫汛限水位的合理調整方案。
  3. The junxiang wetland design in the upstream of yongding river, beijing

    北京永定河上游軍響濕地設計
  4. The paper selected changtan reservoir in guangdong province as case study site, investigated the impacts of 4 upstream reservoirs on changtan reservoir ' s design inflow floods and explored changtan reservoir ' s flood - protection standards, regulating rules and potential for integrated water resources utilization after newly - constructed upstream reservoirs being taken into account

    論文以廣東省長潭水庫為研究對象,闡述了受人類活動影響的水庫設計洪水調度研究方法,研究了水庫在其上游修建了若干個中小水庫以後,其設計洪水調度所受的影響程度,分析比較了研究結果,探討了水庫在考慮上游多個水庫影響下的防洪標準、調度原則及水資源綜合利用特點。
  5. In order to change this kind of condition, we must establish certain analysis appraisal tool for upstream stage technological design to guarantees the stage design reliability

    為了改變這種狀況,就要為上游階段的工藝設計建立起一定的分析評價工具,以保證后階段設計的可靠性。
  6. According to the design code for filling and emptying system of shiplocks and the layout characteristics of the second line of qililong sea route on fuchun river and the upstream navigation tunnel, the type of the filling and emptying system of shiplocks is determined, the area of the culvert transect at the valve is calculated, and the layout type and key size of the filling and emptying system are recommended

    摘要根據富春江七里瀧航道第二通道工程船閘及其上游通航隧道總體布置的特點,按照《船閘輸水系統設計規范》的要求,確定了船閘的輸水系統型式,並計算了輸水閥門處廊道斷面的面積;推薦了通航船閘輸水系統的布置及關鍵尺寸。
  7. This paper design a motorcycle emission reduction system which include a upstream catalyst, a downstream catalyst and air system after the thorough study of catalytic converters and air system

    本文在深入研究催化轉化器和二次空氣噴射系統的基礎上,設計了二級催化加二次空氣噴射的摩托車尾氣凈化系統。
  8. A complete solution provided by schneider electric schneider electric was involved in this project at the upstream phase, schneider electric participated in adapting the lafarge standard to chinese market and work with local design institute ( di ) and lafarge technical center ( cti ) in france. schneider electric provided the mv, lv panel, mcc, automation system and monitoring system including the project management, coordination and global responsibility

    在項目的初級設計階段,施耐德電氣公司配合當地設計院及拉法基在法國的設計中心cti ,將拉法基的設計標準轉化為中國本地標準,與此同時施耐德電氣公司提供了成套設備,其中包括中壓產品,低壓產品, mcc櫃,自動控制系統,並負責整個項目的管理及協調。
  9. Water delivery has been run over 30 years. the main canal has the problem that the actual conveying capacity is very low now and the conveying capacity of the east - one main canal i only half of the design value, this lead to guaranteed real - time efficiency of the irrigation of the farmland recede greatly. the downstream has no water and crops were drought to death have been seen more times in the irrigation period, this lead to the contradictory between the upstream and downstream on water usage, moreover, the lower discharge capacity of the dry canal in irrigation period is the main cause of the actual irrigated area is only half of the design value

    經過三十年的輸水運行,目前乾渠工程存在嚴重的輸水能力低問題,其中東一乾渠輸水能力只能達到原設計的1 2 ,使農田的適時灌溉保證率大大降低,多次發生灌溉期下游見不到水而旱死莊稼的情況,造成上下游用水矛盾突出,而且灌溉期乾渠過流能力偏小,是導致實際灌溉面積僅為設計值的1 3的重要原因。
  10. This fire safe design provides a zero leakage barrier on both upstream and downstream. detail description is found on page 6

    這種防火安全結構對于上游和下游具有零泄漏屏障性能。細節描述請參閱第6頁。
  11. The most common method of determining maximum differential pressure across the valve seats is to assign the maximum design or operating pressure the upstream value p1 and assume a downstream pressure p2 of 0 psig

    測定閥門閥座的最大壓差的最常用方法是將最大設計或工作壓力作為上游的壓力值p1 ,然後假定下游壓力值p2為0psig
  12. The concept of the qos appears in the docsis v1. 1. both ieee802. 14 and docsis, focus in mac protocol design on the upstream channels, i. e. sharing the upstream channels, dealing the services and resolving the contention

    無論是ieee802 . 14還是docsis兩者mac層協議的設計重點都放在上行通道上,即上行通道的分配,服務調度以及沖突解決等。
  13. The construction of middle and small - size reservoirs is impact - profound human activities. this paper aims to conduct flood - routing of designed inflow floods of downstream reservoirs under consider ation of existence of upstream middle and small - size reservoirs, quantitatively analyze the degree of impact of the upstream reservoirs " dam - break floods or flood - regulating functions on design inflow floods of the downstream reservoirs

    上游修建多個中小水庫就是一種較大規模的人類活動,本文研究旨在考慮上游多個中小水庫影響的條件下,對現有的下游水庫設計入庫洪水過程進行調洪演算,定量分析上游中小水庫的蓄泄對下游水庫設計入庫洪水過程調度的影響程度。
  14. The product quality mainly decides by the upstream design, if the upstream design in particular technological design had the disadvantageous influence to the quality, the downriver mold design is very difficult or absolutely cannot eliminate this kind of disadvantageous factor

    產品的質量主要由上游的工藝設計來決定,如果工藝設計對質量產生了不利的影響,下游的模具設計很難或根本不能消除這種不利因素。
分享友人