whole filling 中文意思是什麼

whole filling 解釋
全部充填
  • whole : adj 1 全部的,整個的;所有的,一切的,全…。2 完全的,完整的;沒有缺漏的;無疵的,沒有破損的,原樣...
  • filling : n. 1. 裝滿,填裝;填補。2. 填料;填土。3. (糕點內的)餡。4. (織品的)緯紗,漿料。
  1. It can finish the whole processes of bag forming, filling with fixed quantity, date marking, cutting off and metering with bag - for ming mode of back - sealing or wide sealing

    能自動完成制袋成型、定量充填、日期列印、封口切斷、生產計量等全過程,制袋形式為背封式、寬封口式。
  2. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  3. The operation measures for controlling over - filling ( over - emptying ) are feasible ; the hoisting loads of valve and miter gate are less than their design values respectively ; but, there exists cavitation phenomenon needed to pay attention to the first crossover culvert when the value is near and after whole opening

    控制超灌(泄)操作方式可行;閥門、人字門啟閉力均小於設計值;閥門接近全開至全開后,輸水廊道第一分流口有空化現象。
  4. On the basis of investigation and analysis, the author, directed against such diseases in cement concrete pavement as rupture, hollow, crack and mud - pumping, presents the measures of replacing the whole slab and filling slurry

    在調查分析的基礎上,針對舊水泥混凝土路面板的斷裂、脫空、裂縫和唧泥等病害,提出了整板更換或壓漿灌入等方法。
  5. The manufactory has a whole range of advanced vaporizing and filling facilities and has expanded its earlier 150 terminals to 1000

    企業從原有的150空分設備逐步擴大到1000空分設備,到現在有一整套先進的汽化裝置和液體貯槽充裝設備。
  6. 2 where filling takes place over extended periods, i. e. longer than 24 hours, the process simulation test should extend over the whole of the standard filling period

    2如果灌裝延續一段時間,如:超過24小時,則模擬試驗應該延長至整個標準灌裝時間的長度。
  7. First, according to the demand of vimp for resin system, the reaction kinetics and rheological of up resin are investigated and the optimal content of low additive profile ( lpa ) is determined. then vimp based on a high - permeable medium and grooves are studied by visual experiments, through which the appropriate high - permeable mediums are selected and the parameters of width, depth and spacing for flow grooves and spacing for supply grooves are optimized. furthermore, various factors affecting the mold filling process are discussed and the whole vacuum infusion procedures are described taking examples of the manufacture of a model boat and a sandwich panel in one infusion

    文中首先根據vimp對樹脂體系的要求,對vimp用不飽和聚酯樹脂體系的動力學和流變學性能進行了研究,確定了最佳低收縮添加劑的含量;對高滲透介質型和溝槽型vimp開展了實驗研究,通過可視化實驗優選出較好的高滲透介質,確定了引流槽的寬度、深度和槽間距及主槽的槽間距等工藝參數並進行了優化;對影響充模過程的各種因素進行了詳細的討論,並以模型船和夾芯面板的製作為實例描述了兩種vimp的成型過程;在實驗的基礎上,建立了二維滲漏模型,採用控制體有限元法對高滲透介質型vimp進行了成型過程的計算機模擬計算,通過充模時間和流動前峰的計算值與實驗結果的比較,驗證本文所採用的數學模型和數值方法的正確性,其結果對實際生產具有一定的理論指導意義。
  8. And this was a big fish and so we put him in the bucket and his friend all of a sudden he brings one in. well we spent the whole day there, catching fish, filling up the boat. and after wed caught about 30 of these things, i said okay who wants to catch another one, remembering that we have to clean all these fish

    忽然間,我眼前出現的是20磅重的青花魚,那確是一條大魚,我們把它放在水桶里,他的朋友又拿進來另一條,我們在那兒花了一整天,不停的抓魚,把船堆得滿滿的,我們大約捕了30條那樣的魚,我說:好了,誰還要再抓一條,記得我們還得清理它們哦。
  9. I finally began to recite master s name, and within seconds could see beams of brilliant light dispelling the dark fog, and filling the whole train compartment with a bright and loving energy

    最後,我開始念師父法號,不到幾秒鐘就看見非常明亮的光芒將黑霧驅散,整個車廂內立即充滿光亮與愛力。
  10. Four sides supporting structure. after draw molded, spot welded, high quality armor plate is filled with froth cement filling in the lumen, sticked hpl melamine anti - static paster or pvc anti - static paster on the surface and enchased conductive embeder. the whole body is galvanized. the raised pedestal can lock itself and be adjusted

    採用優質鋼板經拉深成型點焊噴塑,內腔填充發泡水泥填料中,表面粘貼hpl三聚氰胺防靜電貼面或pvc防靜電貼面,四周鑲嵌導電嵌條,支座橫梁整體鍍鋅,支座高度可調並能自鎖。
  11. In the whole course of flood regulation of tgp during flood season as well as filling and discharging of its shiplock, unsteady flow at different levels will occur in the upper and the lower access channels, which will exert an adverse impact on the navigation

    摘要三峽水利樞紐在汛期調洪和船閘充、泄水運行全過程,在上、下游引航道內將產生不同程度的非恆定流,對航運構成相應的不利影響。
  12. Then came gaga, filling up a whole seat and half smothering la faloise beside her so that little but his small anxious face was visible. next followed caroline hequet with labordette, lucy stewart with mignon and his boys and at the close of all nana in a victoria with steiner and on a bracket seat in front of her that poor, darling zizi, with his knees jammed against her own

    接下來的兩輛車里是卡羅利娜埃凱和拉博德特,呂西斯圖華和米尼翁以及他的兩個兒子,最後一輛是四輪敞篷馬車,裏面坐著娜娜和斯泰內,娜娜前面有一張折疊座位,上面坐著可憐的小寶貝治治,他的膝蓋被夾在娜娜的膝蓋當中。
  13. The whole procedure of construction, including foundation - pit excavation, the body construction and foundation - pit filling, was simulated and analyzed by using elastic - plastic fem procedure programmed by myself. and the laws of stress field and displacement field were obtained

    本文通過研編彈塑性有限元程序,模擬並分析了涵洞施工全過程(包括:基坑開挖、涵洞主體施工、基坑及上覆土體回填)中計算域土體變形和應力的變化規律。
  14. They are joyful whenever their wives are, thus filling the whole city of shanghai with happiness

    當妻子快樂時,他也快樂。因而整個城市充滿快樂的氣氛。
  15. The whole learning process includes identifying search form, filling in and submitting search form, fetching result pages from return pages

    整個學習過程包括識別搜索表單,填充並提交表單,從返回頁面中獲取所需的結果頁面。
  16. Adaptability of dam filling with season and coordination among construction diversion, flood discharge and the whole construction schedule should be taken into consideration. the choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper

    如在混凝土面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。
分享友人