wind set up 中文意思是什麼

wind set up 解釋
風力增水
  • wind : n 1 風;大風,暴風;氣流;【機械工程】壓縮空氣。2 【航海】上風;風向;〈古語〉〈pl 〉方向。3 氣息...
  • set : SET =safe electronic transaction 安全電子交易〈指用信用卡通過因特網支付款項的商業交易〉。n 【埃...
  • up : adv (superl uppermost )1 向[在]上,向[在]上面;向[在]被認為處于上方的地方或方面〈如河流的源頭,...
  1. Come up on the wind, barret. set a course sou ' west by west

    迎風而上,巴瑞特,航向西南偏西
  2. They were, says mr stephen, and the end was that the men of the island, seeing no help was toward as the ungrate women were all of one mind, made a wherry raft, loaded themselves and their bundles of chattels on shipboard, set all masts erect, manned the yards, sprang their luff, heaved to, spread three sheets in the wind, put her head between wind and water, weighed anchor, ported her helm, ran up the jolly roger, gave three times three, let the bullgine run, pushed off in their bumboat and put to sea to recover the main of america

    「此語不差」 ,斯蒂芬先生曰, 「其結果,本島男子發現負情女子異口同聲,無可救藥。遂建造舟筏,攜家財登船,桅桿盡皆豎起,舉行登舷禮,轉船首向風,頂風停泊,揚起三面帆,在風與水之間挺起船首,起錨,轉舵向左,海盜旗迎風飄揚,三呼萬歲,每次三遍,開動艙底污水泵,離開兜售雜物之小舟,駛至海面上,航往美洲大陸。 」
  3. The pavement was drying outside, and a cool wind blew along the gallery, swept the close hot air up beneath the glass that imprisoned it and shook the colored lanterns and the lines of gas jets and the giant fan which was flaring away like a set piece in an illumination

    外邊的路面已經幹了,沿著走廊吹來的一股涼風,驅散了玻璃天棚下的熱氣,把五顏六色的燈籠,一排排煤氣燈和像煙火一樣光輝奪目的巨型扇子吹得搖搖晃晃。
  4. Although the strange, hot wind that blew incessantly day and night was rapidly drying up the land, he set in a store of food that could feed them for a long time, if they ate sparingly

    盡管一股怪異的熱風日夜不停地烘烤著大地,但是他所儲藏的食物足夠他們過上很長一段節儉的日子。
  5. The work principle of dual stator - winding induction generator system, and the researches on practical application of dual stator - winding generator system are analyzed in detail. aimed at the work condition of wide rotor speed and optimization of static reactive power generator ’ s volume, the performance of dynamic state and static state and optimal control of high - voltage dc generator system based on dual stator - winding induction generator, are studied in this paper. these researches not only achieve the work characteristic of dual stator - winding induction generator system, but also set up the foundation of optimal design of dual stator - winding induction generator and engineering realization of dual stator - winding induction generator system used in wind generating

    本文闡述了定子雙繞組發電機的基本工作原理,基於matlab軟體建立了定子雙繞組感應電機發電系統的模型,並在此基礎上詳細分析了定子雙繞組感應電機發電系統的工作機理、影響兩套定子繞組容量比的因素等,從而摸清了該系統的特性,尤其是定子雙繞組感應電機高壓直流發電系統在變轉速、變負載下工作的特性,從而為該系統的工程實現奠定了重要的理論基礎。
  6. On the basis of prantel boundary layer idea, wind sand fluid of irreducible rare phase as research object, by the foundation of general equation of wind sand fluid, in the condition of basic hypothesis, the boundary layer equation of car roof surface is set up and the boundary condition the fluid slippage character in solid wall surface is given

    摘要基於普朗特的邊界層思想,以不可簡化成稀相的風沙流體為研究對象,以風沙流的一般方程為基礎,在基本假設的條件下,建立了高速轎車車身頂部過流表面的邊界層微分方程並給出沙流在近壁表面以滑移為特徵的邊界條件。
  7. Ningbo zhenhai typewriter accessory factory was set up in 1985, specializes in making hardware, spring, rubber skin roller and accessory for wind - moved tool, weave machine, typewriter, fax, paper - broken machine, fast printing machine and making pen

    寧波市鎮海打字機零件廠是一家股份合作企業,創建於1985年,專業從事五金機械、橡膠皮輥生產。
  8. Flying apsaras appearance kindly, coronet vertebra hair worn in a bun or coil, the shoulder wraps streamers, stretch and hold up streamers after the right hand, wind the back, is caught by the left hand, the streamer flutters in the breeze, wear the long skirt and wave, the sole uncovers, three auspicious clouds set off, flutter high up in the airly

    飛天面目慈祥,頭飾椎髻,肩披飄帶,右手后伸擎著飄帶,繞過背後,由左手接住,飄帶迎風招展,身著長裙飄揚,腳掌裸露,有三朵祥雲襯托,凌空飛舞。陰刻飾線細致,使形態生動和逼真。
  9. In the early 1600s, the manchurians took over the sovereignty of china and established the ching dynasty. with many pro - nationalist revolts occurring, the newly set - up government immediately imposed a ban on the study and practice of the martial art ; forbidding them altogether in an attempt to gain effective control and order. fire - wind sun honglei, a military official from the previous dynasty, sees this as an opportunity to make a fortune for himself by helping to implement the new law

    七劍的故事敘述於1660年間,滿清雖已入關,但中原武林仍隱藏不少反抗力量,滿清親王哆格多施行禁武令,派前朝降清高手風火連城率領十二門將,剿殺各地違令武林人士而風火連城在西北邊強的最後一個目標,就是武莊。
  10. Set a limit, or you ' ll wind up on a tight budget

    金牛座:定個限度以防經濟緊張。
  11. Further more, power spectrum density ( psd ) of each test section was analyzed, and its experiential formula was given. combined with experiential the formula of coherence function, the mathematic model for calculating the caarc standard tall building ' s wind - induced response was set up

    進一步擬合了順風向和橫風向各測點層層風力譜的經驗公式,並給出了以此為基礎的計算caarc標模風振響應的流程,從而建立起完整的標模風振響應以及等效荷載計算的數學模型。
  12. The two power companies have agreed to set up production - scale wind turbines

    本港兩間電力公司已經同意建設具生產規模的風力發電機組。
  13. In this paper i was in virtue of the fluent software, set up the geometrical model of jin ’ ao mansion and adjacent buildings, used non - equilibrium wall functions to deal with the problem which come from the near wall, used realizable k - turbulent model to simulate the steady flow around 3d high - rise buildings, we can get the distribution of mean wind pressure coefficient of the surface of jin ’ ao mansion and five aerodynamics components. they were compared with the data from the wind tunnel test, we found out the distance between the result of the wind tunnel test and numerical simulation in the acceptable range

    本文以fluent軟體為平臺,建立金奧大廈及其周邊建築的計算幾何模型,近壁區採用非平衡壁面函數法處理,運用基於雷諾時均的realizablek -湍流模型進行高層建築三維定常風場數值模擬,獲得金奧大廈表面時均風壓系數分佈及基底五分量氣動力,並和風洞測壓試驗的結果及風壓系數積分計算的基底五分量氣動力相比較,發現兩者之間的差異在可接受的范圍之內。
  14. In addition, we will commence a wind measurement programme to set up five wind monitoring stations to collect site - specific data. three of the stations will be located at miu tsai tun, tung lung chau and town island to facilitate the collection of wind data in the area east of clear water bay in sai kung, which should constitute the preparatory work for a wind farm site search

    另一項實地風力測量計劃將興建五個測風站,其中三個站分別位於廟仔墩、東龍洲及伙頭墳洲,有助搜集西貢清水灣以東水域的風力數據,為風電場選址作前期準備。
  15. Confirm the way to supply and storage the solar and wind energy, and confirm the scheme of the system ; three kinds of operation ways in the system have been analysed, then corresponding mathematics model has been set up ; finally figure out the solar energy radiate threshold value

    根據確定太陽能和風能的供能、儲能方式,確定系統總體方案;對系統的三種運行方式進行了分析,並建立相應的數學模型;計算出系統控制的太陽能輻射閾值。
  16. This dissertation has on the research and design of a micro turbine engine as background and it is for the purpose of comprehending viscous flow behaviors in micro scaled conditions and that in the mini - turbine cascades. a mini wind tunnel is designed and set up which also can be used in other micro flow experiments. on the basis of this mini wind tunnel, three mini flow experiments, including micro jet experiment, micro boundary layer experiment and mini - turbine cascades experiment, have been carried out

    本文以某型微型渦輪噴氣發動機研製為背景,以認識微尺度下粘性流體流動狀態及其機理和微渦輪葉柵通道內部流動特性為目的,設計並搭建了除本實驗外還可供其他流體力學實驗使用的微型風洞,並在該微型風洞基礎上進行了微尺度射流實驗、微尺度壁面邊界層實驗和微尺度渦輪葉柵實驗。
  17. He also set up the world s first light detection and ranging lidar wind shear alerting system in 2005

    他亦在二五年建立世界第一個激光雷達風切變預警系統。
  18. In this regard, we have successfully persuaded each of the two power companies to study and then set up a production - scale wind turbine so that the public can gain a first - hand understanding of the benefits and limitations of wind power generation and judge the practicality and scope of developing wind farms in hong kong

    為此,我們成功說服了兩間電力公司研究興建兩座具商業規模的風力渦輪,讓市民可以親身了解風力發電的優點和限制,從而決定在香港發展風電場的可行性及規模。
  19. Set up analysis models of solar and wind energy equipment in economy according to the local solar energy resource, then confirms the input of solar energy equipment and wind energy equipment through optimization calculation

    根據當地的資源狀況模擬一條太陽能輻照度曲線,並以此建立太陽能風能經濟性分析模型,通過最優化計算確定太陽能設備與風能設備的投入。
  20. The numerical simulation models for the three - dimensional wind field and concentration field are set up through solving the equations of atmospheric dynamic - thermodynamics and diffusion equation for a complicated terrain, which are verified by combining the practice of yunnan kaiyuan electric power plant

    通過術解復雜地形上的大氣熱力- -動力學方程組及擴散方程,建立了三維的風場、濃度場的數值模擬模式,並以雲南開遠電廠為例對模式進行了驗證。
分享友人