墩基 的英文怎麼說

中文拼音 [dūn]
墩基 英文
pier foundation
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  1. We look for the optimum alternative on the basis of analyzing the internal connection of the diffluent piers body style parameters and the wave

    在分析分流體型參數與波浪間的內在聯系的礎上,尋找較優的分流方案,並在理論分析的礎上提出一些經驗公式。
  2. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈柱、漢白玉華表、拓荒牛、漢白玉佛像、柱頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍柱、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠石、門、玉器加工、浮雕、華表、龍柱、刻字、硅砂、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓柱、花瓶柱、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  3. And results are : ( 1 ) analyze the force and distortion on pipeline under collapse and gulch in theory. on the base of beam deformation, analyze the bending moment and deformation of pipeline with frusta and without frusta. calculate a true problem, contrast the differences between pipeline with frusta and one without frusta, draw some conclusions

    得到的主要結果為: ( 1 )於彈性地理論和彈性梁的撓曲線理論,給出了管道在固定(相當跨越河溝情況)和無固定(相當坍塌和沖溝情況)的變形微分方程,並分析了當量軸力為拉力或壓力時管道的變形和受力情況。
  4. Papaya each containing 100 grams of up to 529 mg of amino acids, aspartic acid 149 mg, 34 mg glutamic acid, arginine 31 mg, 28 mg valine, isoleucine 34 mg, 34 mg lysine, oleanolic acid 70 mg, 24. 9 mg calcium, vc96. 8 mg apple ' s 48 times, pectin 9. 5 %, 16. 8 % of total sugar, high nutrient content of papaya and other non - comparable papaya

    每100克木瓜含氨酸高達529毫克,其中門冬氨酸149毫克,谷氨酸34毫克,精氨酸31毫克,纈氨酸28毫克,異亮氨酸34毫克,賴氨酸34毫克,齊果酸70毫克,鈣24 . 9毫克, vc96 . 8毫克是蘋果的48倍,果膠9 . 5 % ,總糖16 . 8 % ,營養含量之高非番木瓜和其他木瓜可比。
  5. Two numerating methods are used in traditional structural design of gate chamber. first, considering the gate frusta to be fastened on the weir body, it is calculated as plane stress problem independently. then applying the results ( moment and vertical force ) on the bottom of gate frusta as concentrating load on the weir body, and the weir body is viewed as a elastic foundation beam or plate and unilateral stress analysis was performed

    傳統閘室結構計算有兩種計算方法,其一是將閘視為固端于堰體上,單獨進行閘平面受力計算,再將閘下部的計算結果(彎矩和垂直力)作為集中荷載作用於堰體上,堰體作為彈性地梁或板進行片面應力計算。
  6. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋,採用浮式平臺。
  7. The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier

    摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊箱圍堰採用工廠整體製造,下河浮運至位,利用錨施加預拉力精確定位的施工新工藝。
  8. The underwater near - site explosion safety control management is expounded in combination with rock blasting for pier footing of the newly built nos. 15 & 16 berths of dalian new port area

    摘要結合大連新港地區新建15 (上標# ) , 16 (上標# )泊位工程橋墩基槽炸礁的實際情況,介紹水下近場爆破安全控制管理問題。
  9. Works are accomplished as follows in this paper : firstly, according to the real condition of the fourth pier, through analysis of several generally - used anti - slipping schemes, new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping

    為此本文主要做了以下工作:首先根據4 #墩基礎的具體條件,通過對現有常用的幾種抗滑方案的綜合比較分析,提出了以工程本身的鉆孔樁礎代替錨固柱樁防止鋼圍堰滑移的方案。
  10. Blasting removal for anchorage block foundation behind penstock of tgp power source station

    三峽電源電站引水鋼管壩后鎮墩基礎拆除爆破
  11. Pile group effect of main pylon foundation of sutong bridge

    蘇通大橋主塔墩基礎群樁效應研究
  12. A finite element numerical model for arch dam - gravity pier - foundation system was established to evaluate the effect of high gravity piers on the stress, deformation and anti - sliding stability of sizhai arch dam, taking the following factors into account, such as the possible elastoplastic deformation of foundation rocks and the nonlinear interaction between the interfaces of gravity pier - dam foundation, the joint surfaces beneath the right bank, and the interfaces of arch dam - gravity pier

    摘要為評價高重力對四寨拱壩的應力變形和抗滑安全的影響,建立了拱壩重力系統的有限元數值模型,其中考慮重力墩基礎、右岸夾層和拱壩重力等交界面的非線性相互作用,以及巖材料的彈塑性變形行為。
  13. Belled pier foundation

    鉆孔墩基
  14. Analysis of anti - washing construction of fourth main tower pier of great sutong bridge

    蘇通大橋4號主塔墩基礎防沖刷施工難點分析
  15. Discussion on design and structure of pier foundation

    墩基礎設計及構造探討
  16. According to features of diffcult anti - washing construction of pier foundation under compley hydroraphic, gological, and water potential conditions, combining construction condition methods, author analyze and conclude key points and difficulties of anti - washing construction of the fourth main pier of great sutong bridge, and difficulties in construction and relevant countermeasures

    摘要針對在復雜的水文、地質、河勢條件下進行橋墩基礎沖刷防護施工難度大的特點,結合施工工藝和方法,對蘇通大橋主橋4號主塔沖刷防護施工中的重點難點、施工中出現的不利隋況及應對措施進行了分析研究。
  17. With reference to the hydrologic data and geologic conditions of the changjiang river over the years, this paper analyzes the features of and key technical problems to be resolved in the construction of in - water pier foundations in the north river branch of tianxingzhou changjiang river bridge. accounts for the construction organization principle preparation and construction implementation of the foundations, comparison and selection of working platform and steel cofferdam to be used at each pier site, and also summarizes the construction methods for the deep water steel cofferdams of the bridge

    摘要根據長江歷年水文資料、地質情況,分析了天興洲長江大橋北汊水中墩基礎施工的工程特點和要解決的關鍵技術,介紹了施工組織的原則制定和實施過程、各位平臺及圍堰的方案比選,總結了該橋深水鋼圍堰的施工方法。
  18. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力混凝土連續梁, 4 #是其一個主礎採用雙壁鋼圍堰與鉆孔樁相結合的復合礎。
  19. Construction of the footing at the east abutment and the centre pier for bridge no. str19 have been completed

    鄰近於長沙橋編號str18的南橋墩基腳與及中間柱的腳工程已完成
  20. Based on the model simulation test of the pile foundation of xiabaishi bridge in fujian province, the effect on the rock limit bearing capacity is analyzed through elastic modulus variation of the bridge pile

    摘要依據福建省寧德地區高速公路下白石大橋主橋墩基礎模型模擬試驗,分析了橋彈性模量變化對巖極限承載力的影響。
分享友人