壩圍水 的英文怎麼說

中文拼音 [wéishuǐ]
壩圍水 英文
impoundment
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用電工程地質勘察規范( gb50287 - 99 )的巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對區巖體按其基本指標作出定量化評分、分級。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花電站在1995年及1996年導流渡汛工程措施設計及工模型試驗,對混凝土面板堆石的導流渡汛標準、導流方式及其選擇、施工期渡汛及體填築分期、堰設計以及施工方案及總進度等與混凝土面板堆石特點有關的問題進行研究,為工程建設提供一定的參考。
  3. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮比值的整治原則.總結整治規劃實施過程中治江塗經驗,特別是「以」和丁頭保護等工程措施.分析錢塘江河口大規模治江塗后對錢塘江河口潮汐、洪位、河床以及杭州灣北岸深槽的影響
  4. The project is 156 m dam height, 877 m normal impounded level and 760 mw installed capacity. minjiang river benches almost conversely in shajinba reach and makes the right bank a thin and weak ridge, which is a syncline geological structure

    岷江在沙金河段形成一個近180的河曲,使右岸形成三面被河曲抱的條形山脊,構造上為一完整沙金向斜,工程區工建築物都布置在右岸山脊內。
  5. The dam is but the centrepiece of a colossal endeavour to transform the cities of the yangtze along a 400 - mile stretch from the wartime capital of chongqing, in the west, to the old british treaty port of yichang, in the east, towards shanghai and the sea

    三峽只是一項改變長江沿岸城市的宏大計劃的中心部分,整個計劃范涉及長江沿岸400多英里的城市,從西邊的重慶開始,到港口都市宜昌,最後到東邊的入海口上海。
  6. According to the contrast between different maps and the dynamical conditions, the area of bohe lagoon had reduced by 45. 3 % from 1932 to 2000 and human activities in the coastal zone, such as inning, sand dredging and aquiculture, have brought great effects on the coastal system, which has accelerated the barrier erosion and lagoon evolvement

    通過對比分析, 1932 ~ 2000年,博賀?湖面積減少45 . 3 % ,人類活動已成為影響該區海岸演變的主導因素;灘塗墾、海岸采沙與產養殖等人類活動加劇了沙海岸的侵蝕後退,且使得?湖面積迅速減少,不斷淤淺萎縮,大大加快了海岸體系的演化進程。
  7. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅庫面板堆石基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范以及腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透料置換,並根據本工程特點在下游腳加設了反濾層.為提高基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石的設計和研究提供參考與借鑒
  8. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了巖質量、初始地應力場、施工開挖順序對大型地下洞室群巖穩定性的影響。
  9. The characteristics of temperature distribution in vertical and horizontal directions and the conductance distribution in horizontal direction in an earth dam were analyzed, and the locations, distribution characteristics, ranges, and leakage rate of main leakage passages of the dam were calculated by use of the virtual heat - source method presented in this paper, the result of study provides a scientific basis for dam leakage control

    分析某貯灰場土垂向和平溫度分佈特徵、電導平分佈特徵,並利用滲漏探測虛擬熱源法模型,計算出該土的集中滲漏通道的空間位置、展布特點、范大小和滲漏強度,為堤滲漏治理提供科學依據。
  10. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡電站超大型地下洞室群巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子電站攔河閘及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家地下洞室群巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱基(肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程體的靜動力安全穩定性及溫控方案提供依據。
  11. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級電站區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  12. ( 2 ) moxi break - zone, detuo fault of daduhe break - zone and taoping hot - water vicinity of f2 fault have the advatanged condition for reservior - induced seimicity

    ( 3 )區外的磨西斷裂及大渡河斷裂帶中的得妥斷層, f2斷層的桃坪溫泉附近具有發生庫誘發地震的有利條件。
  13. In order to control the flood and to mitigate wangering of the section, since the beginning of building water control works on the yellow river, some 3700 dams, battlements and revetments have beed set up. these works have played an impotant role in flood control

    人民治黃以來,為了有效地控制洪,減少主流游蕩范,在該河段已修建了3700多道由、垛、護岸組成的河道整治工程,對保障防洪安全起到了重要作用。
  14. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫體前的淤積和「力沖填」築技術的探索和研究,創立了淤地體自然加高的理論,並提出了具體的導流方式、體防沖措施及堰消能蓄洪、留淤脫設計。
  15. Efficiency of permeable pile dike is closely related to water - sand ratio in upstream flow, direction of the coming flow and seepage rate. this paper investigates mechanism and effect of flow control and aggradation using hydraulic modeling and theoretical analysis. it is shown that suitable seepage rate can help aggradation and suitable coming flow direction can help to govern the flow trend

    研究結果顯示,來流和來沙一定的條件下,透率在適當的范內有利於后緩流落淤,入流角在一定范內對控導河勢有明顯作用,不同方案組合所對應的緩流落淤效果和控導河勢作用具有一定的差異性。
  16. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的穩定問題分析得出:建后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大建成后逐漸蓄階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及體總體上仍處于穩定狀態;位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮位驟降及本區最大地震力的共同作用,體將在滑坡體下滑推力的作用下產生破壞;建平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,體及滑坡體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參數的降低而有可能導致體失穩破壞。
  17. Base on studying the analyzed - approach of reservior - induced seimicity, writer bring forward the hydrogeological analyzed method for reservior - induced seimicity, and with that eatimated the reservior - induced seimicity of hydrogeological model model in dam - region. at the same time analyzed the reservior - induced seimicity danger of large - scale break in periphery of dam region

    在對比研究庫誘發地震分析方法的基礎上,作者提出庫誘發地震文地質分析方法並利用該方法對文地質模型庫誘發地震作出評價,同時對區外大型斷裂的庫誘發地震進行了一定程度的分析。
  18. After the hydraulic project of the three gorges of the yangtze river is completed, the water level in front of the dam of the three gorges reservoir area will be raised from the now several tens of meters to 175 meters. furthermore, because of the needs of preventing floods, the water level of reservoir area will be adjusted periodically between 175 meters and 145 meters every year. this will inevitably cause the revival of part ancient landslides and the formation of new landslides, which will definitely influence the urban construction, the traffic transportation, the people ' s life and property security, etc. in the three gorges reservoir area

    長江三峽利樞紐工程建成蓄后,庫區位將由現在的幾十米海拔高程提高到175m ,且由於防洪的需要,庫位每年還將在175m與145m之間進行周期性調節,這無疑將導致部分古滑體的復活和新滑體的產生,結果勢必會對未來三峽庫區范的城鎮建設、交通運輸、人民生命財產安全等造成一定的影響。
  19. As a new type of impervious wall material, the geomembrane is to be used in the central core earth and rockfill dams. in this thesis, the engineering characteristics of geomembrane are mainly investigated. the reliability of impermeability, the durability, the deformation adaptability and the proper application range of geomembrane are discussed

    本文重點研究了土工膜作為一種新型防滲材料應用於土石防滲心墻的工程特性,探討其在土石運行期間防滲的可靠性、耐久性、變形能力及其適用范
  20. The former director of the centre for disease control and prevention of the united states, dr jeffery koplan, once likened our public healthcare system to that of a dam wall protecting us from floods

    前美國疾病預防及控制中心主管高柏安醫生曾把我們的公共?生系統比喻作抵禦洪泛濫的堤墻。
分享友人