抽氣道 的英文怎麼說

中文拼音 [chōudào]
抽氣道 英文
bleed-off passage
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 氣道 : air flue; air passage
  1. The paper mainly consider the followings : the performance parameter determination of cryopump, heat load determination and heat transfer of large cryopanel, reasonable distribution of heat load, the condition for construct steady flow in small vertical circle pipeline, balance condition for gas and liquid two - phase flow in the connection pipe between cryopanel and dewar, the safety of cryopump

    文中探討了低溫泵性能參數的確定;大速低溫面的熱負載的確定及合理分配;冷凝面上豎直圓管內受熱建立穩定流動的條件;冷凝面與杜瓦間的連接管液「雙相流動」的平衡條件;低溫泵系統運行的安全問題。
  2. If they are unable to protect their airway due to encephalopathy or massive stroke, they may be intubated ( have an endotracheal tube placed through their mouth or nose into the trachea ) to minimize the possibility of aspiration

    如果病人因腦病或大面積中風無法保護,這時就需要插管(即經口或鼻施行管內插管) ,最大限度地減少吸可能性。
  3. As stated in paragraph 2 of appendix to annex 4. 8 of volume two of ifp, vitiated air from the tunnel is discharged vertically from exhaust shaft of the ventilation building

    建議邀請書第二冊附件4 . 8的附錄的第2段註明,隧的濁會由通風大樓的塔垂直排出。
  4. Chemical fume hoods shall be of air foil design with 45 degree sloped sections on the sides and top of the hood opening to insure maximum containment and minimum eddying of air currents

    化學通風櫃應採用風設計,側面成45度坡度,罩頂開口,以確保量最大、空渦流最小。
  5. For the remaining eight at - gradeoverhead stations ( tseun wan, kwai hing, kwai fong, ngau tau kok, kowloon bay, kwun tong, heng fa chuen and chai wan ), retrofitting of platform screen doors involves major alterations to the stations and tunnel ventilation, air - conditioning and smoke extract systems. since such at - gradeoverhead stations are not designed with air - conditioning and ventilation systems, retrofitting works are subject to technical constraints

    至於其餘8個現時沒有月臺幕門的地面及高架車站(即荃灣、葵興、葵芳、牛頭角、九龍灣、觀塘、杏花?及柴灣) ,加裝月臺幕門系統須涉及重大工程,包括車站及隧通風系統、冷系統及風系統等的大型修改工程。
  6. Police received a report at 3. 20 pm from a staff of the tate s carin highway that a plastic bag was found placed inside the bush next to the ventilation bump room and odd smell were emitting from the bag. upon arrival, police found that a human head bone and a two feet long skeleton was placed inside the plastic bag

    警方于下午約三時二十分接獲一名大老山隧職員報告,指于泵房旁草叢發現一個傳出惡臭的膠袋。警方到場后,于該袋內發現一個頭骨及一件約六十厘米長駭骨。
  7. Parts of damp air are exhausted out off the oven through centrifuge fan and the other is circled and heated still, in this way the purpose can be realized

    濕空從烘盤底下的傾斜風出后,經離心風機使一部分濕空排出烘箱外。另一部分空繼續循環加熱。
  8. Experiment of boundary layer suction in serpentine inlet under ground running

    蛇形進地面工作狀態附面層吸試驗研究
  9. And we consider sufficiently all kinds of factors, such as conductance of tube, leak and deflate of system, pump speed, ionization and re - ionization of high - energy ion taking place in the process of transmission. furthermore, we take two ways to discuss pressure distribution of cell

    在系統軸線上壓力分佈分析過程中,綜合考慮了管的流導、系統的漏和放、泵的速、高能離子在管內漂移過程中發生的電離和再電離等因素的影響。
  10. Test methods for sampling and determination of particulate matter in stack gases

    中微型顆粒的樣和定義的試驗方法
  11. Combined with the actual condition of the plant simulator, this paper analyzes the native and abroad development of the simulation device. the main content is followed : introducing the characteristics and managing specialties of the simulator project in detail ; introducing the simulation object, describing the hardware, software structure and functions of the simulation object ; describing the exploitation process and mathematic model of the main steam, reheater, by - pass system, regenerative heater extraction, deareator, pipes, network system and pumps

    本文分析了國內外模擬培訓裝置的發展狀態,並結合本廠模擬機開發的實際情況,其主要工作如下:詳細介紹了模擬機開發項目的特占和管理特殊性;介紹了模擬對象和所開發模擬機的硬體結構、軟體結構,以及它的功能;詳細介紹了作者參加開發的汽機系統的主蒸汽、再熱蒸汽和旁路系統,回熱和除氧系統,以及管、管網和泵等模型的開發過程和數學模型。
  12. In the energy level, there are 4 shapes, and the more abstract concepts, aura, chakras, etc. are included here

    八卦可以解釋物質世界和實體世界,而四象是能量的層次,比較象,它包含靈等。
  13. In order to solve the problems effectively, under the auspices of 863 plan in china, the synthesis diagnosis has been carried by means of measuring and numerical imitating the combustion chamber of refining column, and some conclusions is such as : ( 1 ) through measuring the temperature and combustion in the burning chamber of the refining column, the result shows the temperature difference on the same level is more than that in height direction, and there is a few of co in bottom of burning chamber. ( 2 ) in order to ensure normal work of flue system in lead column in the course of zinc refining, theoretic calculation and measure about the flow resistance of exhaust gas are carried through. the results of study reveal that drawing out force of chimney is inadequate, which is mainly caused by illogicality of flue construction

    在研究過程中,採取了現場實測和數值模擬手段對韶關冶煉廠鋅精餾鉛塔燃燒室及排煙系統進行了綜合診斷,具體結果包括如下: ( 1 )完成鋅精餾鉛塔燃燒室內溫度測試以及燃燒狀況的測試,結果發現:鉛塔燃燒室內水平方向的煙溫度並非均勻,而且其溫差比上下方向的溫差更大,以及鉛塔燃燒室尾部存在co未燃燼問題; ( 2 )為了保證鉛塔煙系統的正常工作,對煙系統的阻力進行了理論計算及測試分析,結果發現:鋅精餾鉛塔煙系統中煙囪力不夠,這主要是煙結構不合理所造成的。
  14. Replacement of high voltage switchboards, transformers and low voltage system of the tunnel power supply system in lion rock tunnel, replacement of field equipment of toll collection system in cross - harbour tunnel and replacement of ventilation control panels, exhaust fans, motors and flexible connectors in aberdeen tunnel

    更換獅子山隧供電系統的高壓配電板變壓器和低電壓系統更換海底隧車輛繳費系統的路面設備及更換香港仔隧的通風控制屏扇電動機和軟接頭
  15. A constricted throat in the air passage of a carburetor, causing a reduction in pressure that results in fuel vapor being drawn out of the carburetor bowl

    文丘里管汽化器空中的一段喉管,導致壓力減小從而把燃料的蒸出汽化器的碗狀部分
  16. These equipments are vacuum system which is made up of diffusion pump, pipes, water - cooling baffle and rotary vane pump ; the whole chamber, wall and water - cooling wall are made of stainless steel ; the lower part is equipped with cool water sleeve which can fast take out air to gain 10 - 4 or higher vacuum, therefore they are widely used in high - tech fields, such as the platting, electronic, metallurgy, chemical engineering, atomic energy, materials and medicine etc

    Kt系列擴散泵機組是由凸腔擴散泵管水冷擋板機械泵等組成的高真空系統,整個泵腔泵壁及水冷壁全部由不銹鋼作成,下部配有降溫用急冷水套,速度快,極限真空高,它可使被容器獲得10 - 4或更高的高真空,因此廣泛適用於鍍膜裝飾電子冶金化工原子能材料醫藥等等各種高新技術領域。
  17. Before steam admission, valve on vacuum hogging extraction line ( the valve is befor hogging pipe of the two stage steam jet ejector ) should be closed ( see also two stages steam jet ejector installation and operation instruction )

    在蒸汽進入之前,真空啟動管上的閥門(啟動汽器前的閥門)應該關閉(請參見相應的兩級射汽器安裝使用說明書) 。
  18. Mtrcl has advised us that such retrofitting works cannot be advanced as they involve major alterations to the stations, and the tunnel ventilation, air - conditioning and smoke extraction systems. added to the complexity of the works is the need to carry out the works during the non - operating hours between 2 am and 5 am

    地鐵公司表示由於工程涉及車站及隧通風系統、冷系統及風系統的重大修改,因此未能提早完成。此外,所有工程只能在非行車時間內即凌晨二時至五時期間進行。
  19. It is considered that the results are important base to further study and predicate the air exhausted time for vacuum drying of long - distance pipeline

    研究結果對進一步進行長輸管真空乾燥時間的預測研究提供了重要的依據。
  20. Experimental results of the air pumping of a serpentine inlet under ground running show that the total pressure recovery at the exit is low and the distortion at the exit is large

    摘要對一種蛇形進開展了地面工作狀態下的吸試驗研究,結果表明,在該狀態下進出口截面的總壓恢復系數較低、流場畸變較大。
分享友人