拱軸 的英文怎麼說

中文拼音 [gǒngzhóu]
拱軸 英文
arch axis拱軸二輪車 janker
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 軸Ⅰ名詞1. (圓柱形的零件) axle; shaft 2. (對稱部分的直線) axis 3. (圓柱形的纏繞器物) roller; spool Ⅱ量詞(用於纏在軸上的線以及裝裱帶軸子的字畫)
  1. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  2. The cyclo - hoop effect which steel tubular has exert to the concrete shows the character of heterogeneous in the arch rib section, the same to the axial direction. the paper verifies the change of the material poisson ration and the concrete grade will make the cyclo - hoop effect obvious alteration, the change of the cyclo - hoop effect and the stress redistribution of the section produced by the shrinking and creeping of the concrete and the expensive concrete on the section

    在鋼管混凝土肋斷面上,鋼管對內填混凝土的環箍效應具有非均勻性,在拱軸方向上環箍效應也呈現非均勻性。驗證了材料的橫向變形系數、混凝土標號等參數的變化將引起環箍效應的明顯改變;混凝土的收縮、徐變和膨脹混凝土的應用導致鋼管混凝土的環箍效應發生變化並使截面的應力發生重分佈;並總結了其變化的基本規律。
  3. In order to solve the technological problem of the dredge of raw material flow on the production line, we ? e carried out as overall theoretical and experimental research on the movement characteristic of the raw material on the surface of sifter in the vibratory machine, the dynamics property of the vibration stimulated by inertial double - axes, the flow property of raw material in these store hoppers, the agglomeration and obstruction mechanism

    針對生產實踐急需,提出了本項研究題目。本文為了解決生產線物料流疏通的技術難題,對物料在振動篩分機篩面上的運動特性、雙慣性激勵式振動篩分機的動力學特性、儲料倉內物料的流動特性、物料結及堵塞機理等進行了全面的理論分析和試驗研究。
  4. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及腰;大部分地段的液化區出現在隧道頂板上方。
  5. In the former, two computing modes of fem are built, aimed at the coupling of variable - profile pylon, curved - axis arch and flexible cable. the software algor feas is used to get the results of dynamic numerical analysis, such as natural vibration frequency, vibration mode, dynamic displacement, dynamic stress, which are compared with the results of shaking table test research to draw to important conclusions. these conclusions provide not only potent basis for the design and construction of nanjing century tower, but also reference for other pylon - cable - arch structures similar to the project

    在動態數值分析中,針對世紀塔變截面的塔身,曲線線的以及柔性拉索相互耦合時清況,建立兩種有限元計算模式,利用有限元軟體algorfeas得到動力數值分析的結果,如:自振頻率、振型、動位移、動應力等等,再和振動臺試驗研究成果作比較,得到一些重要的結論,從而為南京世紀塔工程的設計和施工提供強有力的依據,而且為類以於世紀塔工程的其它塔-索-結構的設計也提供一定的參考。
  6. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼應力、錨桿力、噴射混凝土內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼應力急劇增大而可能引起支護體系失穩的原因。
  7. Influences of transverse bias of arch axis on the arch ring behavior under static loads

    拱軸線橫向偏離對圈靜力行為影響
  8. Center bearing anchor bar

    中搖枕板三轉向架
  9. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異鋼架結構設計可採用的軟體、結構模型的建立、支座構造形式、變異梁的設計,以及保證梁平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異鋼架弧形梁吊裝、角度的調整、鉸支座穿銷等的施工方法,最後對施工完成後的位移進行了實際量測。
  10. Especially indicate how to calculate the modulus of partially cfst arch bridge axis with different section and not even constant loads mass degree

    特別指出了部分灌注鋼管混凝土橋截面不統一且恆載集度有變化的前提下,如何考慮其拱軸系數的計算。
  11. Abstract : this paper introduces the global stiffness, strength and stability of bracing structure with long span, pointing out that the control of bracing structure ' s deflection and elastic module can make the arch ring fit the line of pressure and arch axis and can guarantee the stability of bridge structure

    文摘:本文介紹了大跨度支撐結構的整體剛度、強度和穩定性,控制支撐的撓度和彈性變量可使圈符合設計壓力線與拱軸線,保證橋梁結構的穩定性。
  12. Finally, the thesis primarily sets up the internal force model of the supporting structure system in the bi - arch tunnel, namely, the distribution model of the surrounding rock ' s pressure, the internal force model of the steel framework and the axial force model of the anchor bolt, and these results can have the guiding significance to the design and construction of the similar tunnel engineering

    最後,結合有限元的理論計算及現場實測數據的分析,初步建立了雙連隧道支護結構體系的內力模型,即:圍巖土壓力模型、初期支護鋼架內力(主要為力和彎矩)模型以及錨桿力模型。充分理解和闡述了構件的工作狀態,對今後類似隧道工程的設計和施工具有一定的指導意義。
  13. ( 2 ) the common used arch axes are circular arcru parabola arch, catenary arch

    ( 2 )空腹式剛架橋的拱軸線一般可取圓弧線、拋物線或懸鏈線。
  14. According to the character that the soil can endure the press than the tensile strength, the arching shape of the soil arch between piles has been regarded as the reasonable arch axes. by analyzing the mechanical balance condition of the arch, the transfer mechanism of the thrust has been gained. at the same time, the formula for computing the thrust acting on the pile has been gotten, and the present computing formula is just the special example of it

    根據巖土體抗壓性好、抗拉性差的特點,將樁間土形視為合理拱軸線方程,通過分析土的力學平衡條件,得出樁間滑坡推力的傳遞模型,並由此得到抗滑樁上的滑坡推力計算公式,現有抗滑樁上滑坡推力的計算公式只是本文公式的特例。
  15. Through the finite element method, this paper compares some variable parameters such as the arch axis, the rise - span ratio and the ratio of spans, which influence the mechanical performances of open spandrel rigid - framed arch bridge. then it summarizes the mechanical properties of this bridge type and the optimal range of these parameters. the plexiglass model test validates the correctness of the finite element method used in this paper. the study will provide reference for the design of this new bridge type

    本文採用有限元方法對影響空腹式剛架橋受力性能的主要參數:拱軸線型、矢跨比及跨徑比進行了比較分析,總結了這種橋型的結構受力特點以及拱軸線型等參數的合理范圍,為這種新橋型的工程設計提供參考,並通過有機玻璃模型試驗驗證了有限元分析的正確性。
  16. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    對鋼管混凝土橋的拱軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫系統、合龍設計及其細節、管內混凝土的泵送、吊桿、系桿、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。
  17. In connection with its self properties, we make an inquiry into the major parameters, such as ratio of height and span, equation of arch axis, geometry size of section and so on

    針對該橋自身的特點,對肋矢跨比,線方程,截面的幾何尺寸等主要技術參數做了探討。
  18. 3 wheel rail rolling noise, which under 1000hz is caused by the rail s arched flange and above 1000 hz by wheel axle resonance, comprises the major part of the measured spectrum

    ( 3 )輪軌振滾噪音為噪音頻譜之最大值,其中1000hz以下為軌道下凸緣之形共振所引起, 1000hz以上為輪面之向共振所引起。
  19. At the same time, the thesis analyses the time - state curve of the axial force and bending moment of the steel framework and the axial force of the anchor bolt. the analysis results are compared with the results of the fem calculation

    同時,論文對現場監控量測獲得的鋼力彎矩時態曲線以及錨桿力時態曲線進行了分析,並與理論計算進行了比較,驗證。
  20. Through the fem calculation and the analyzing data of the field, the result is that the central wall mainly endures the vertical pressure from the structure transferring and its bending moment is relatively less and its position of the maximum value of the bending moment locates in the joint between the central wall and the steel framework

    通過有限元計算和對現場監控量測數據的分析,論文得出:中隔墻主要承受結構傳遞的豎向壓力,彎矩值較小;鋼架的力以受壓為主,彎矩值在中隔墻上方位置處最大。
分享友人