掘土的 的英文怎麼說

中文拼音 [juéde]
掘土的 英文
fossorial
  • : 動詞(刨; 挖) dig
  • : 4次方是 The fourth power of 2 is direction
  1. The gravediggers put on their caps and carried their earthy spades towards the barrow

    墓工們戴上便帽,提著沾滿泥鐵鍬,朝手推車走去。
  2. They loved children and animals and music, and rough plays and digging in the earth.

    他們熱愛兒童,熱愛動物和音樂,熱愛熱鬧游戲以及挖地。
  3. Six of the houses so far unearthed measured about 250 square feet ( 23 square meters ) each and had wooden walls and clay floors

    已發6座房屋中每座佔地約23平方公里,有木製墻壁和粘地板。
  4. It would have taken a dozen men with picks and shovels three months to do what we ' ve done today, with this earth - moving machine

    今天我們用這輛機乾活,相當於12個用鎬和鏟幹活人勞動3個月。
  5. In other bills he had a lot of other names and done other wonderful things, like finding water and gold with a " divining - rod, " dissipating witch spells, " and so on

    在其它一些小傳單上,他又有了別一些名字,能有種種非凡能耐,象用「萬靈寶杖」 ,可以劃地出泉,生金還有「驅趕邪魔外道」 ,如此等等,不一而足。
  6. With increase of soil hardn ess, digging duration in incisors significantly increased, but dried soil mass d ug out by the zokors in each bout reduced

    隨著壤硬度增加,高原鼢鼠挖時間及每次挖時持續時間明顯增加,而每次量顯著減少。
  7. Nevertheless, if preservation is impracticable to carry out, the office permits a rescue excavation and publishes record as a compromise alternative

    不過,要保留所有遺址當然困難重重,辦事處只得在地發展勢在必行遺址進行搶救發,把出文物和田野紀錄發表存案。
  8. And so, as we have said, the iron gate leading into the kitchen - garden had been closed up and left to the rust, which bade fair before long to eat off its hinges, while to prevent the ignoble glances of the diggers and delvers of the ground from presuming to sully the aristocratic enclosure belonging to the mansion, the gate had been boarded up to a height of six feet

    因此,正如剛才已經說過,這扇通果園鐵門已封閉了起來,任其生銹腐蝕,而確要不了多久鐵銹就會把門鉸鏈爛斷,同時,為了防止果園里工人擅自窺視燈廈,玷污貴族庭園,鐵門上又釘了六尺高木板。
  9. Digging in the garden is hard work

    在花園里是辛苦工作。
  10. And digging holes to plant saplings releases greenhouse gases from the soil

    植苗則釋放出壤中溫室氣體。
  11. I used to dig the garden every week, but i lost heart when all the plants died

    過去我每星期都要在花園里栽種,但是自從所有花木都死了后,我也就心灰意冷了。
  12. It comprises surplus materials from site clearance, excavation, construction, refurbishment, renovation, demolition and road works

    這包括由工地平整、、樓宇建築、裝修、翻新、拆卸及道路等工程所產生剩餘物料。
  13. They may instead have used their long teeth to dig and chop, in the same way that beavers do, says paul barrett, a dinosaur expert at the natural history museum, london

    它們可能像海貍那樣通過用長牙和削劈來獲取食物,倫敦自然歷史博物館恐龍專家鮑爾?巴勒特說。
  14. As when one plows and breaks up the earth, our bones are scattered at the mouth of sheol

    7我們骨頭散在陰間門口,好像人耕田刨地塊。
  15. Several local finds are from this period : the sung wong toiinscription, now relocated near the entrance to the hong kong international airport ; the song inscription in the grounds of the tin hau temple at joss house bay ; caches of song coins from shek pik, mai poand kellet island ; and celadons of song type from various sites, especially nim shue wan and shek pik on lantau island

    現已搬到近香港國際機場入口宋王臺石刻、大廟灣天後廟宋代碑刻、分別在石壁、米埔和奇力島出宋代窖藏錢幣,以及在多處,尤其是大嶼山稔樹灣和石壁發宋代青瓷,都是這個時期文物。
  16. Later, large numbers of fossils were found there, of many different species. they included both marine and land organisms, and revealed much about the organisms " evolution and the changing geographical environment. tsailiao creek became a world - famous fossil site

    爾后陸續發化石不但種類繁多,數量豐富,更包含海相與陸相生物種屬,對海陸生物演化與古地理環境變遷具有研究價值,也使得菜寮溪成為世界聞名化石重鎮。
  17. In 1986, the institute of archaeology of zhejiang province unearthed large amount of jade wares from the graveyard of liangzhu culture at fanshan and yaoshan of hangzhou city thus further proving that the study of archaeologists is of utmost importance

    1986年,浙江省文物考古研究所在杭州反山、瑤山良渚文化墓地發大批玉器,進一步表明考古家們研究是極為重要
  18. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨水管道中遇到技術難題,進行手式工具管砂層頂管法施工技術試驗研究,在研究中考慮砂層存在后靠體移位、變形,工具管難以進入出洞體,挖面易坍塌、管道中心易偏差及難糾偏等問題,通過對后靠體和挖穩定計算及偏差產生原因理論分析,提出並採用后靠體換填加固,出洞體換填加固,以及在工具管頭部設置管帽、格柵、糾偏系統等技術措施
  19. A mathematical model and the related parameters for epb shield tunneling

    壓平衡盾構數學物理模型及各參數間關系研究
  20. Tops. earth - moving machinery - tip - over protection structure for compact excavators - laboratory tests and performance requirements

    方機械.壓實挖傾倒防護結構
分享友人