掙值成本控制 的英文怎麼說

中文拼音 [zhēngzhíchéngběnkòngzhì]
掙值成本控制 英文
earned value cost control
  • : 掙動詞[書面語] (刺) stab; prick
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. In this thesis, the traditional windage analytical method that comparing the actual cost with the planning cost can not control the implementary course of project, an effective project management and control technique which is very popular in nowadays is used for reference - - earned value method basing on performance analyzing, the main aim is to use the earned value exponential to analyze the fluctuant complexion of the time limit and cost for a project, and all the influences made by the fluctuant complexion, and the developing trend of the time limit and cost for a project

    文提出了傳統的用實際發生與計劃進行比較,來衡量項目進展情況的偏差分析法不能全面地監項目實施過程,借鑒了在目前項目管理實踐當中被普遍採用的一種有效的項目管理和技術:基於績效分析的法,其根目的是要使用該指數分析項目工期和項目各自出現的變動情況、這些變動所造的相互影響、項目工期與項目的未來發展趨勢。
  2. Integrated cost / schedule control using the earned value technique

    綜合/進度技術。
  3. The earned value method of modern project management body of knowledge is originated from the “ cost / schedule control system criteria ”, which was put forward by the department of defense ( dod ) of usa in 1967

    現代項目管理知識體系中的項目分析方法的雛形來自於1967年美國國防部推出的「進度系統規范( c / scsc ) 」 。
  4. Through the systematical analyses measure, which combine classical model of project management and latest modern theory, the thesis integrative analyses the every factor which belong to scope management s time management 、 cost management 、 quality management 、 risk management 、 human resource management 、 procurement managements communication management and integration management of hunan international convention and exhibition center. especially research the effective and practical measure, which include time management of wbs s systematic model measure of risk management s earned value of investment control etc. it has continuous improved and developed the practice of project management, has realized the transform procedure from theory study to practical application. at the same time, the thesis discuss the development thinking of convention and exhibition economy, discuss the future study direction of project management science in our country, summarizes and evaluates the achievement which result from exce llent project management

    論文採用項目管理經典模式與最新前沿理論相結合的系統分析方法,對湖南國際會展中心項目的范圍管理、時間管理、管理、質量管理、風險管理、采購管理、人力資源管理、溝通管理和集管理中諸要素進行了優化分析,重點研究了基於wbs進度管理、系統模型法風險管理、法投資等行之有效的、符合項目實際的項目管理技術方法,並在項目管理實踐中不斷完善和發展,實現了從理論研究到實踐應用的轉化過程。
  5. At last, in order to explain the application of earned value method in actual project, this thesis brings forward an example of software exploitation, in this example, project s curve, cost and schedule windage table, performance exponential and so on are used to analyze the headway complexion of project, and some control methods are put forward

    最後,為了說明法在實際項目中的應用,文列舉了一個軟體開發實例,實例運用項目s曲線、與進度偏差表、績效指數等工具對項目進展情況進行了具體分析,並提出具體的措施。