控制質量 的英文怎麼說

中文拼音 [kòngzhìzhíliáng]
控制質量 英文
control mass
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  • 質量 : 1 [物理學] mass 2 (產品或工作的優劣程度) quality 3 economy (離子源的); 質量標準 quality level...
  1. Abstract : large time delay exists in complicated practical processes. for example, in fccu ( fluidized catalytic cracker unit ) reactor - regenerator, the feed is preheated through heat exchanging from fractional column slurry, thus results in large time delay. a predictive control system is designed for such processes, where the kernal algorithm is dynamic matrix control. application results show that the control behavior is improved than original pid control

    文摘:實際的復雜工業過程,往往具有大的時滯,例如:煉油廠催化裂化裝置的反應再生系統,其原料油預熱通過油漿換熱實現,因此時滯特別大.本文針對這一類大的時滯過程,設計了以動態矩陣為核心演算法的預測系統,運行實踐表明:這一方案比原pid控制質量上有較大提高
  2. ( 2 ) construct the system framework of the agent - based qis , design the five agents that separately accomplish five function , including quality plan setting , quality measuring, quality evaluating & control, quality cost manage and quality integration information manage , buildup the running mechanism and the information exchanging policy for agent - based qis in cims. ( 3 ) present a novel method of agent - based online quality control ( aoqc ) in assembling production line ( apl ), establish a intelligent structure of computer aided quality control system ( caqcs ) based on multi - agent, impliment all kinds of agent in this system , and lay out all their function

    ( 2 )建立了基於智能代理的信息系統的體系結構,對分別完成其計劃定、檢測與管理、評價與成本管理及綜合信息管理五大功能的五個agent的內部結構進行了設計,闡述了它們的運行機和優越性,說明了系統與cims其它功能子系統的信息集成。
  3. All the items for export must be under the tight seal which ensures that we always put the total quality control into execution

    所有出口品種都必須真空密封,以保證全面控制質量這一措施的實行。
  4. Using feedback with prediction to control chaos, we also catch hold of the result of high - period, which has never been reached. the double feedback method is introduced to control the chaos and hyperchaos in a 2 - dimensions discrete system and the spatio - temporal open - flow models based on the method of the delayed feedback and the predict method. the condition under which chaos can be stabi lized could be educed by theoretical analysis

    提出預測反饋與延時反饋組合的雙反饋方案,並將這一方案應用到對離散系統的混沌和超混沌的以及時空系統中混沌的;從理論上分析了具體系統採用此方案,系統能住的解析條件;理論和數值計算的結果都表明,使用組合的方案極大地拓寬了系統可的參數范圍,提高了控制質量,有利於實際應用。
  5. The outcome indicates that improving the breed, prompting the rate of emergence, improving the quality, quality control through the innovation of organization and technique at the base of stabling livestock number will be the emphasis of the development of pork industry in our country

    結果表明:在穩定存欄的基礎上通過組織創新和技術創新改良品種、提高出欄率、改善品控制質量將是我國豬肉產業發展的重點。
  6. And secondly target and methods about quality control to construction project, have the affect factor " 4m1e " to quality variation under analysis and control, that quality to be influenced, seven kinds of means and tools of mathematical statistics to control quality and basic work need to do

    接著對施工項目的依據、目標和方法,影響變異的「 4m1e 」因素的分析和、數理統計控制質量的七種工具和方法、需做的基礎工作等作了全面的論述。
  7. The paper studied the management method reformation of construction enterprises in the choosing of organization form and the three major target management ( quality, progress and cost ) innovation and technical improvement. this paper also brought up the principle for choosing the form of organization mechanism ; analyzes the factors which affects the construction quality, progress and cost. based on this, it proposed a new method for full quality management and whole course dynamic progress managing as well as cost managing

    論文重點研究了工程項目管理在組織機構選擇和三大目標、進度和成本)方面的管理方法改革和技術措施改進;給出了施工企業選擇項目管理組織機構的原則;對影響施工、進度及成本的因素進行了分析,在此基礎上,針對施工企業管理中存在的問題,提出了全面管理、全過程動態進度管理和成本管理的新方法。
  8. This paper presents a study and analysis of project management organization ' s set up, progress control, quality control, safety control, capital control, bidding management and construction spot management, risk management etc. and on the basis of the study and analysis, a set of strategic plan about project management appropriate for beijing huamao center is worked out

    本文從投資方工程項目管理的角度對北京華貿中心工程項目建設管理模式、組織機構的設立、工程工期、安全、投資、工程招投標管理、合同管理、信息管理、施工現場管理、竣工驗收及項目后評價管理、風險管理等方面作了較深入的研究、分析,定出一整套適合本工程項目特點及市場定位的工程項目的建設管理策劃方案。
  9. Based on the methods of document comprehensive analysis, contrast analytic method, questionnaire, statistical method and case survey, i analyze the influential factors of proofreading and control methods. based on the characteristics of medical journal and proofreading, the application of comprehensive quality control to the proofreading quality control is elucidated in four parts : stuff supervision, resource equipment, manuscript processing, quality control. this paper is consisted of four parts

    通過運用文獻綜合分析法、對比分析法、問卷調查法、統計法、個案實踐法,對影響校對因素及方法進行了綜合分析,同時結合高校醫學學報的特點和校對特點,從「人員管理」 、 「資源配置」 、 「校對工作環節」 、 「管理」入手,構建了具體的醫學學報全面管理方案。
  10. A laser marking machine is able to meet the need of on - line marking on a production line with its high speed, and can give separate and distinct identification numbers to workpieces produced in large quantities, hence is a great help in production control, quality control and guarding against counterfeit

    激光打標機速度可以滿足生產線在線打標的要求,可對大批生產的工件實行產品單個識別編號,有效地幫助實行生產工序以及防止假冒產品。
  11. Introduced and discussed the concept of quality, quality management, quality control, quality planning, and so on in the second chapter. and, expounded quality management principle and quality management system, analyzed the discrepancy of iso9000 family standards between version 1994 and version 2000

    第二章介紹和討論了管理、策劃的概念,論述了管理的原則和管理體系,分析了1994版和2000版iso9000族標準的差異。
  12. The artide, the process contrd in construction project, analyzed the inner aned outer environment of the construction enterprise, considered the advanced managing experience of some construction enterprises in and out of china, researched the managing theories and summarized the practice experience from project cost contrd, progress contrd, quality contrd and capital contrd, and tried to find an efficacious way to superintend the process of the construction, the article indude five parts : 1. the necessity and strategic significance of carrying out the contructinn project process contrd. 2. the current situations and main problems of the project process contrd in china. 3. the experience of the project process contrd in and out of china, and the revelation for us. 4. the methods and contents of enhancing the project contrd in enterprise, include the methods and contents of the project cost contrd, highlighting quality contrd and improving quality standard, highlighting quality contrd and improving quality standard, the contrd of project planning progress and resource management, strengthening financial management and increasing the profits. 5. speeding up the reform of the project control institution, improving the scientific and efficacious managing institution, improving the scientific and efficacious managing institution, and some key respects in the project management process

    所有者缺位,企業沒有真正地建立起現代企業度,決策缺乏科學性,人本管理、企業文化建設、度建設沒有真正地的落到實處,企業的經營權力過分集中,經營者負盈不負虧,拼資源的現象普遍存在,管理水平不高,盈利能力較弱,競爭能力不強,人員素較差,是大部分國有企業內部的通病。 《施工項目過程式》這篇文章,通過對施工企業所處內外環境的客觀分析,結合國際國內的一些施工企業的先進管理經驗,從項目成本,進度,資金等方面進行理論探索及實踐總結,力爭找出一條有效監施工企業施工過程的成熟的管理之路,全文共分五個部分:一、實施施工項目過程式的必要性及其戰略意義。二、當前我國項目的現狀及其存在的主要問題。
  13. After apply the project, the rubber sulfuration time is precisely controlled, quality can be greatly guaranteed, make the xing tai rubber limited corporation ' s economy benefit increase awfully, the production yield, annual sale, annual profit increase by the rate of 10 %

    在應用此系統后,輪胎的硫化時間得以精確的有了很大的保證,使邢臺橡膠有限公司的經濟效益有了很大的增長,生產產、年銷售額、年利潤以10的速度增長。
  14. " why does china, the largest coal producing country in the world, still need to import coal ? ", a paradoxical question is raised at the beginning of this paper. then based on a brief introduction of the situation of china ' s coal industry, this paper analysis the features of coal products combined with theoretical knowledge of enterprise competitive strategies, and attempts to introduce some competitive strategies to chinese coal enterprises, generally involving overall cost leadership ( overall cost control and quality guarantee system ), differentiation and focus

    本篇論文通過「中國作為第一產煤大國為什麼還要進口煤炭」作為引子,在對我國煤炭工業基本情況及煤炭在我國能源中的地位介紹的基礎上,試圖通過分析煤炭行業的產品特點,結合所學過的有關企業競爭戰略的理論知識,針對開放了的競爭市場的挑戰,提出了煤炭企業的競爭戰略,即總成本領先戰略(總成本保證體系) 、產品差異化戰略和目標聚焦戰略,使企業目標明確。
  15. Ps : well the role included the familiarresponsibilities for a western oem quality director, including part and productstandard definition, measurement and validation, manufacturing product control, engineering change control, quality systems management and audit, qualityimprovement activities - from pre - production samples through to warrantyimprovement, metrology, product audit and part approval

    這個角色包括西方整車廠總監的職責,包括零件和產品的標準的定義、測和認可、產品製造過程式、工藝更改體系管理和產品審核、改進活動(從零部件樣件的試生產到售後服務的改進) 、計、產品審核和零部件認可。
  16. P > 42 what kind of quality control do you have

    你們用什麼辦法來控制質量呢?
  17. 170 fhat kind of quality control qo you have

    你們用什幺辦法來控制質量呢?
  18. 170 what kind of quality control do you have

    你們用什幺辦法來控制質量呢?
  19. 42 what kind of quality control do you have

    你們用什麼辦法來控制質量呢?
  20. 170 what kind of quality control do you hae

    你們用什幺辦法來控制質量呢?
分享友人