斷拉架 的英文怎麼說

中文拼音 [duànjià]
斷拉架 英文
missing lycra
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : 拉構詞成分。
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. Then the jews, because it was the day of preparation, so that the bodies would not remain on the cross on the sabbath ( for that sabbath was a high day ), asked pilate that their legs might be broken, and that they might be taken away

    約19 : 31猶太人因這日是豫備日、又因那安息日是個大日、就求彼多叫人打他們的腿、把他們拿去、免得屍首當安息日留在十字上。
  2. The jews therefore, because it was the preparation, that the bodies should not remain upon the cross on the sabbath day, ( for that sabbath day was an high day, ) besought pilate that their legs might be broken, and that they might be taken away

    猶太人因這日是預備日、又因那安息日是個大日、就求彼多叫人打他們的腿、把他們拿去、免得屍首當安息日留在十字上。
  3. The jews therefore , because it was the preparation , that the bodies should not remain upon the cross on the sabbath day , ( for that sabbath day was an high day , ) besought pilate that their legs might be broken , and that they might be taken away

    31猶太人因這日是豫備日,又因那安息日是個大日,就求彼多叫人打他們的腿,把他們拿去,免得屍首當安息日留在十字上。
  4. In campania, stronghold of the camorra syndicate, a firefighting helicopter was shot at on august 6th

    在克莫式秘密壟組織的據點坎帕尼亞,一救火直升機於8月6日被擊落。
  5. He collapsed a backboard support in his first nba appearance on television, delaying the game 45 minutes

    他第一次參加nba籃球賽出現在電視上時就把籃板支倒了,使比賽中了45分鐘。
  6. The kinematic performance of the macpherson suspension on a real vehicle is studied, and the changes of the front wheel alignment and the motion of the front wheel in the longitudinal and the transversal directions are figured. based on the requirements of general layout, a constrained optimization design model is set up with the steering cross rod ball joint position as the optimization variables ( design parameters ), and the sum of steering cross rod length interference while the left front wheel turning and bouncing as the objective function. and the optimization results are worked out by programming on computer

    針對一種實際車型上的麥弗遜式懸,計算分析了轉向輪跳動時前輪定位角和車輪橫向、縱向滑移量的變化情況,並根據實際車型上麥弗遜式懸的空間布置要求,建立了以轉向橫開點空間位置坐標為優化變量,轉向橫開點空間布置坐標可變化范圍為約束條件,車輪轉向和跳動時轉向橫桿長度干涉量為目標函數的約束優化設計模型。
  7. The hoisting of the girders was achieved by the combination of a hoisting machine with scaffolding. before the variant arch was moved into its place, scaffolds were set up under the place where the arch would be, and a clearance of 0

    變異拱就位時,先在該處下方搭好腳手,並把腳手開留出0 . 8m間隙,利用腳手搭設龍門,用手葫蘆把梁提升到位。
  8. Then, an optimal design to minimize tyre wear is performed, which brings forward the way to reduce tyre wear through optimal choosing and modulating original deposition of double - link independent suspension and optimizing the cut point of track rodin

    論文對雙橫臂獨立懸參數提出以減小輪胎磨損為優化目標,進行了優化設計。提出了通過優選、調整懸初始位置狀態,以及優化確定轉向橫開點位置的方法,來減小輪胎磨損。
  9. Ben, in his long, lonely wanderings about the island, had found the skeleton - it was he that had rifled it ; he had found the treasure ; he had dug it up it was the haft of his pickaxe that lay broken in the excavation ; he had carried it on his back, in many weary journeys, from the foot of the tall pine to a cave he had on the two - pointed hill at the north - east angle of the island, and there it had lain stored in safety since two months before the arrival of the hispaniola

    長期孤身流浪在海島上的本葛恩發現了那副骨,並把它身邊的東西搜掠一空。發現寶藏的也是他,他把金銀財寶都掘了出來坑裡留下的鎬頭柄就是他的,把財寶扛著從大松樹下搬到海島東北角雙峰山上的一個洞穴里。不知返了多少越,終于在伊斯班裊號抵達前兩個月把所有的寶藏都安全運到那裡。
  10. As the new product which is firstly developed by our company, this product owns accessories almost complete universal as j53 - 630b models. on base of integrated machine frame of former j53 - 630b model, this product is installed with pull rod and adopted new technology of hydraulic pressure stress, assuring equality of pull rod pre - stressing force and strengthening intensity and rigidity of machine frame. owing to solving the fracture problem of integrated machine frame for former j53 - 630amodel and j53 - 630b model, the j53 - 630c model press is greatly enhanced on reliability of its machine frame and its overload capacity is strengthened during application, being a popular type firstly purchased by extensive customers nowadays

    是我公司率先推出的新產品,該產品與j53 - 630b型零件幾乎完全通用,在原j53 - 630b型整體機的基礎上安裝了桿,採取了液壓予緊的新技術,確保了桿予緊力均勻,機的強度與剛度大大增加,徹底解決了原j53 - 630a型j53 - 630b型整體機裂問題,所以j53 - 630c型壓力機的機的可靠性大大增加,設備使用中過載能力增強,現成為廣大用戶率先選購的機型。
  11. Comparing with j53 - 1000b model with integrated body, j53 - 1000c model with split body and three - section pre - stressing force 4 - pull rod structure is safer and more dependable in the aspect of frame, and also thoroughly solves the fracture problem of integrated machine frame for j53 - 1000b model

    J53 - 1000b型為整體機身j53 - 1000c型分體機身,其結構型式為三段予應力四桿結構,其機較j53 - 1000b型整體機身更為安全可靠,也從根本上解決了j53 - 1000b型整體機身機裂的問題。
  12. With prestressed rolling mill of the middle steelworks of taiyuan iron and steel limited group company as the researched object, this article analyze the existent questions and research the initial stress of prestressed rolling mill and computer control system, analyze the design thought of prestressed rolling mill and clarify the relationship between the dimensional precision of rolled material and the rigidity of base of rolling mill and the main method to increase the rigidity of base of rolling mill, analyze how to confirm the rigidity, sectional area of handle and post, and pretightening force, put forward the viewpoint that the key to assure great rigidity is to assure that the remnant initial stress is always positive during rolling, and develop intelligent control system with plc as the core on the basis of the former research to assure that the remnant initial stress is always positive during rolling

    本文以太鋼集團公司中型型鋼廠預應力軋機為對象,分析了該廠預應力軋機所存在的問題,對預應力軋機的預應力以及微機控制進行了系統研究;分析了預應力軋機的設計思路,闡明了軋材尺寸精度與軋機機座剛度的關系及提高軋機機座剛度的主要途徑;分析了預應力軋機設計過程中預應力軋機的剛度、預緊桿和機立柱面積及預緊力的確定;提出了預應力軋機保證高剛度的關鍵就是「確保軋制過程中,殘余預應力始終大於零」的觀點;在前述研究的基礎上開發了以可編程邏輯控制器為核心的智能監控系統,以確保「軋制過程中,殘余預應力始終大於零」這個要求。
  13. Self - erection system is applied to construction of most of modern large span concrete bridges. in the process of construction, cantilever beam is changing continuously because of the gravity of concrete, the stretching force, the load and temperature variation etc. in order to ensure that two cantilevers constructing opposite can normally close up and that the bridge linearity can accord with design, flexibility deformation has to be monitored

    現代大跨度混凝土橋梁多採用自設體系施工,在混凝土自重、張力、橋面荷載、溫度變化等的作用下,懸臂梁體處于不的變化之中,為保證對向施工的兩端懸臂能正常合攏和控製成橋線形符合設計要求,需要對施工過程中的撓度變形進行監測。
  14. There was a little old piano, too, that had tin pans in it, i reckon, and nothing was ever so lovely as to hear the young ladies sing " the last link is broken " and play " the battle of prague " on it

    大廳里還有一小小的舊鋼琴。我估猜,鋼琴的裏面,準有不少的白鐵鍋吧。年輕的姑娘們唱著一曲「金鏈寸寸」 ,彈著一曲「布格戰役」 ,那是再悅耳也沒有了。
分享友人